| Plan Review Stops For Permit 20030970 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
3 |
Status |
P |
Date |
2021-06-07 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2021-06-07 |
Time |
14:57 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2021-06-07 |
Time |
14:57 |
Sent To |
|
|
| Notes |
| 2021-06-07 14:58:15 | 551 @ OKEECHOBEE BLVD, GIVE THE START OF THE PROJECT, | | | UPDATED PERMIT. |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
F |
Date |
2021-03-02 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2021-03-02 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2021-03-02 |
Time |
14:36 |
Sent To |
|
|
| Notes |
| 2021-03-02 14:37:41 | PLANS SHOW MULTIPLE MANHOLES, PLEASE EMAIL ME A SITE | | | PLAN INDICATING THE LOCATION OF THE PROJECT | | | SPECIFICALLY THE START OF THE SERVICE, SO THAT AN | | | ADDRESS CAN BE ESTABLISHED. EMAIL [email protected] |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2020-07-31 |
Time |
12:19 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2020-07-31 |
Time |
12:19 |
Sent To |
|
|
| Notes |
| 2020-07-31 12:22:34 | PLEASE CONTACT [email protected], TO BE ASSIGNED A GENERIC | | | PROPERTY CONTROL NUMBER FOR VERIZON, ALSO PLEASE EMAIL | | | A SITE PLAN SHOWING THE EXACT LOCATION OF THE POLE IS | | | TO BE INSTALLED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
N |
Date |
2021-06-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-06-24 |
Time |
11:28 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-06-24 |
Time |
11:26 |
Sent To |
|
|
| Notes |
| 2021-06-24 11:29:39 | 05/28/21 DISCUSSED WITH ROBERT BROWN. | | | POLE IS LOCATED WITHIN FDOT ROW. POLE DESIGN AND | | | SPECIFICATIONS REVIEWED/APPROVED UNDER FDOT PERMIT | | | #2019-H-496-00550. | | | PERMIT PACKAGE IS INCLUDED IN THIS SUBMITTAL. JG. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2021-06-07 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-06-07 |
Time |
13:22 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-06-07 |
Time |
13:21 |
Sent To |
|
|
| Notes |
| 2021-06-07 13:23:13 | NOTE: | | | CHRISTINA WARR SEND ME EMAIL ON 06/03/21 LISTING | | | SEVERAL PROJECTS, INCLUDING THIS ONE 20030970. THERE IS | | | NOTHING NEW UPLOADED TO PROJECTDOX. CONTRACTOR NEEDS TO | | | UPLOAD TO PROJECTDOX THE INFORMATION TO ADDRESS THE | | | COMMENTS BY ALL THE PLAN REVIEWERS. | | | NOTE: | | | PROVIDE FDOT APPROVED PERMIT PACKAGE. IF THERE IS NOT | | | FDOT APPROVED PERMIT PACKAGE THEN ALL THE BUILDING | | | REVIEW COMMENTS APPLY. SEE COMMENTS BELOW. | | | | | | | | | | | | SECOND BUILDING REVIEW COMMENTS | | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | PERMIT #20030970 | | | | | | ORIGINAL COMMENT: | | | 1- APPLICATION WAS SUBMITTED AS AN ELECTRICAL PERMIT | | | ONLY FOR THE INSTALLATION OF 100 AMP ELECTRICAL SERVICE | | | TO SMALL CELL POLE. BASED ON THE INFORMATION SUBMITTED, | | | IT LOOKS LIKE A COMMUNICATIONS PERMIT IS REQUIRED. CITY | | | ORDINANCE NO. 4774-18. | | | NOTE: PLEASE SEE ZONING AND ENGINEERING COMMENTS. | | | | | | RESPONSE: | | | PLEASE SEE ZONING AND ENGINEERING COMMENTS. | | | | | | ORIGINAL COMMENT: | | | 2- TITLE SHEET T1 SPECIFIES "INSTALLATION OF PROPOSED | | | POWER FOR SMALL CELL EQUIPMENT ON PROPOSED METAL POLE". | | | SCOPE OF WORK IS NOT CLEAR. IS THERE A NEW METAL POLE | | | OR IS IT EXISTING INSTALLED BY FPL.?. PLANS ALSO SHOW | | | VERIZON WIRELESS ENCLOSURE ATTACHED TO THE POLE. THERE | | | ARE NO SPECIFICATIONS FOR THE ATTACHMENT OF THIS | | | ENCLOSURE TO THE POLE. IS THIS DONE UNDER ANOTHER | | | PERMIT. ? SEC. 107.2.1 CITY AMENDMENTS. | | | PROVIDE PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR | | | THE PROPOSED METAL POLE AND VERIZON WIRELESS ENCLOSURE | | | ATTACHMENT IF THEY ARE PART OF THIS PERMIT. SEC. 1609.1 | | | FBC-BUILDING. | | | | | | RESPONSE: | | | A) IT IS NOT CLEAR IF A NEW POLE WILL BE INSTALLED OR | | | NOT. IF NEW POLE IS INSTALLED, THEN PROVIDE COMPLETE | | | ENGINEERING DETAILS AND SPECIFICATIONS, INCLUDING THE | | | EFFECTIVE PROJECTIVE AREA OF THE POLE AND PROPOSED | | | EQUIPMENT TO BE INSTALLED IN IT. | | | PLANS ALSO SHOW VERIZON WIRELESS ENCLOSURES ATTACHED TO | | | THE POLE. THERE ARE NO SPECIFICATIONS FOR THE | | | ATTACHMENT OF THIS ENCLOSURES TO THE POLE. SEC. 1609.1 | | | FBC-BUILDING. ALSO, PROVIDE ALL THE WIND DESIGN DATA AS | | | REQUIRED BY SEC. 1603.4 FBC-BUILDING. | | | | | | B)PROVIDE POLE MANUFACTURER'S SPECS MEETING THE | | | ENGINEER'S DESIGN CRITERIA. ENGINEER OF RECORD TO | | | REVIEW/APPROVED POLE SPECS PRIOR TO SUBMITTAL. SEC. | | | 107.3.4.1 CITY AMENDMENTS. | | | | | | ORIGINAL COMMENT: | | | 3- VALUATION DECLARED IN THE PERMIT APPLICATION IS LOW. | | | VALUATION TO INCLUDE ALL LABOR, MATERIALS, CONTRACTOR'S | | | OVERHEAD AND PROFIT AND DESIGN PROFESSIONAL FEES AS | | | REQUIRED BY SEC. 109.3 CITY AMENDMENTS. UPDATE | | | VALUATION AS REQUIRED, INCLUDING DESIGN PROFESSIONAL | | | FEES. | | | | | | RESPONSE | | | NOT ADDRESSED. SCOPE OF WORK IS NOT CLEAR. UNABLE TO | | | DETERMINE VALUE. | | | | | | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | | ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF | | | THE REVISION MADE, IDENTIFYING THE SHEET OR | | | SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL | | | HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR | | | ANTICIPATED COOPERATION. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-03-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-03-05 |
Time |
17:02 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-03-05 |
Time |
16:38 |
Sent To |
|
|
| Notes |
| 2021-03-05 17:03:24 | SECOND BUILDING REVIEW COMMENTS | | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | PERMIT #20030970 | | | | | | ORIGINAL COMMENT: | | | 1- APPLICATION WAS SUBMITTED AS AN ELECTRICAL PERMIT | | | ONLY FOR THE INSTALLATION OF 100 AMP ELECTRICAL SERVICE | | | TO SMALL CELL POLE. BASED ON THE INFORMATION SUBMITTED, | | | IT LOOKS LIKE A COMMUNICATIONS PERMIT IS REQUIRED. CITY | | | ORDINANCE NO. 4774-18. | | | NOTE: PLEASE SEE ZONING AND ENGINEERING COMMENTS. | | | | | | RESPONSE: | | | PLEASE SEE ZONING AND ENGINEERING COMMENTS. | | | | | | ORIGINAL COMMENT: | | | 2- TITLE SHEET T1 SPECIFIES "INSTALLATION OF PROPOSED | | | POWER FOR SMALL CELL EQUIPMENT ON PROPOSED METAL POLE". | | | SCOPE OF WORK IS NOT CLEAR. IS THERE A NEW METAL POLE | | | OR IS IT EXISTING INSTALLED BY FPL.?. PLANS ALSO SHOW | | | VERIZON WIRELESS ENCLOSURE ATTACHED TO THE POLE. THERE | | | ARE NO SPECIFICATIONS FOR THE ATTACHMENT OF THIS | | | ENCLOSURE TO THE POLE. IS THIS DONE UNDER ANOTHER | | | PERMIT. ? SEC. 107.2.1 CITY AMENDMENTS. | | | PROVIDE PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR | | | THE PROPOSED METAL POLE AND VERIZON WIRELESS ENCLOSURE | | | ATTACHMENT IF THEY ARE PART OF THIS PERMIT. SEC. 1609.1 | | | FBC-BUILDING. | | | | | | RESPONSE: | | | A) IT IS NOT CLEAR IF A NEW POLE WILL BE INSTALLED OR | | | NOT. IF NEW POLE IS INSTALLED, THEN PROVIDE COMPLETE | | | ENGINEERING DETAILS AND SPECIFICATIONS, INCLUDING THE | | | EFFECTIVE PROJECTIVE AREA OF THE POLE AND PROPOSED | | | EQUIPMENT TO BE INSTALLED IN IT. | | | PLANS ALSO SHOW VERIZON WIRELESS ENCLOSURES ATTACHED TO | | | THE POLE. THERE ARE NO SPECIFICATIONS FOR THE | | | ATTACHMENT OF THIS ENCLOSURES TO THE POLE. SEC. 1609.1 | | | FBC-BUILDING. ALSO, PROVIDE ALL THE WIND DESIGN DATA AS | | | REQUIRED BY SEC. 1603.4 FBC-BUILDING. | | | | | | B)PROVIDE POLE MANUFACTURER'S SPECS MEETING THE | | | ENGINEER'S DESIGN CRITERIA. ENGINEER OF RECORD TO | | | REVIEW/APPROVED POLE SPECS PRIOR TO SUBMITTAL. SEC. | | | 107.3.4.1 CITY AMENDMENTS. | | | | | | ORIGINAL COMMENT: | | | 3- VALUATION DECLARED IN THE PERMIT APPLICATION IS LOW. | | | VALUATION TO INCLUDE ALL LABOR, MATERIALS, CONTRACTOR'S | | | OVERHEAD AND PROFIT AND DESIGN PROFESSIONAL FEES AS | | | REQUIRED BY SEC. 109.3 CITY AMENDMENTS. UPDATE | | | VALUATION AS REQUIRED, INCLUDING DESIGN PROFESSIONAL | | | FEES. | | | | | | RESPONSE | | | NOT ADDRESSED. SCOPE OF WORK IS NOT CLEAR. UNABLE TO | | | DETERMINE VALUE. | | | | | | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | | ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF | | | THE REVISION MADE, IDENTIFYING THE SHEET OR | | | SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL | | | HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR | | | ANTICIPATED COOPERATION. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-06-17 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2020-06-17 |
Time |
16:45 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2020-06-17 |
Time |
16:41 |
Sent To |
|
|
| Notes |
| 2020-06-17 16:45:37 | BUILDING REVIEW COMMENTS | | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | | | 1- APPLICATION WAS SUBMITTED AS AN ELECTRICAL PERMIT | | | ONLY FOR THE INSTALLATION OF 100 AMP ELECTRICAL SERVICE | | | TO SMALL CELL POLE. BASED ON THE INFORMATION SUBMITTED, | | | IT LOOKS LIKE A COMMUNICATIONS PERMIT IS REQUIRED. CITY | | | ORDINANCE NO. 4774-18. | | | NOTE: PLEASE SEE ZONING AND ENGINEERING COMMENTS. | | | | | | 2- TITLE SHEET T1 SPECIFIES "INSTALLATION OF PROPOSED | | | POWER FOR SMALL CELL EQUIPMENT ON PROPOSED METAL POLE". | | | SCOPE OF WORK IS NOT CLEAR. IS THERE A NEW METAL POLE | | | OR IS IT EXISTING INSTALLED BY FPL.?. PLANS ALSO SHOW | | | VERIZON WIRELESS ENCLOSURE ATTACHED TO THE POLE. THERE | | | ARE NO SPECIFICATIONS FOR THE ATTACHMENT OF THIS | | | ENCLOSURE TO THE POLE. IS THIS DONE UNDER ANOTHER | | | PERMIT. ? SEC. 107.2.1 CITY AMENDMENTS. | | | PROVIDE PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR | | | THE PROPOSED METAL POLE AND VERIZON WIRELESS ENCLOSURE | | | ATTACHMENT IF THEY ARE PART OF THIS PERMIT. SEC. 1609.1 | | | FBC-BUILDING. | | | | | | 3- VALUATION DECLARED IN THE PERMIT APPLICATION IS LOW. | | | VALUATION TO INCLUDE ALL LABOR, MATERIALS, CONTRACTOR'S | | | OVERHEAD AND PROFIT AND DESIGN PROFESSIONAL FEES AS | | | REQUIRED BY SEC. 109.3 CITY AMENDMENTS. UPDATE | | | VALUATION AS REQUIRED, INCLUDING DESIGN PROFESSIONAL | | | FEES. | | | | | | 4- PLANS SUBMITTED HAVE A COPY OF THE ENGINEER'S SEAL | | | AND SIGNATURE. PLANS NEED TO HAVE THE ORIGINAL SEAL AND | | | SIGNATURE OF THE ENGINEER OF RECORD AS REQUIRED BY SEC. | | | 61G15-23.003 FAC AND CHAPTER 471 F.S. WHEN SUBMITTING | | | PLANS/DOCUMENTS FOR PUBLIC RECORDS. ENGINEER TO SUBMIT | | | PLANS WITH ORIGINAL SEAL AND SIGNATURE OR ENGINEER MAY | | | SUBMIT PLANS WITH DIGITAL SIGNATURE IF FOLLOWING THE | | | PROCEDURE OF SEC. 61G15-23.004 FAC. | | | | | | ENGINEERS | | | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2021-06-16 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-06-16 |
Time |
14:00 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-06-16 |
Time |
13:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2021-03-03 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-03-03 |
Time |
12:50 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-03-03 |
Time |
12:45 |
Sent To |
|
|
| Notes |
| 2021-03-03 12:52:55 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | YOU NEED TO ADDRESS THE REVEIW COMMENTS FROM 3/23/20. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-03-23 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2020-03-23 |
Time |
15:23 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2020-03-23 |
Time |
15:23 |
Sent To |
|
|
| Notes |
| 2020-03-23 15:23:35 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | FAC = FLORIDA ADMINISTRATIVE CODE | | | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1. VALUE FOR WORK STATED ON PERMIT APPLICATION APPEARS | | | LOW. PROVIDE COPY OF SIGNED CONTRACT WITH SCOPE AND | | | VALUE OF WORK, TO INCLUDE ALL MATERIALS AND LABOR. THIS | | | IS FOR TOTAL PROJECT, NOT JUST ELECTRICAL. WPB FBC | | | 109.3 | | | 2. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR | | | SERVICE INCLUDING INFORMATION FROM THE POWER COMPANY | | | STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR | | | THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE | | | SERVICE EQUIPMENT IS ADEQUATE. NEC 110.9, 110.10 | | | 3. PROVIDE AIC RATING OF ANY SERVICE DISCONNECTS AND | | | PANELS. NEC 110.3, 110.9 | | | 4. PROVIDE NOTES TO INDICATE THE REQUIRED MARKING OF | | | SERVICE EQUIPMENT FOR ARC FLASH HAZARD WARNING AND | | | AVAILABLE FAULT CURRENT PER CODE. NEC 110.16, 110.24 | | | 5. PROVIDE GROUNDING DETAIL FOR SERVICE ON RISER | | | DIAGRAM. NEC 215.5, 250; WPB FBC 107.2.1 | | | 6. PROVIDE WIND LOAD DESIGN CRITERIA FOR POWER POLE. | | | FBC 1609.1 | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, PROVIDE A RESPONSE LETTER ADDRESSING EACH | | | ITEM ALONG WITH THE CITY RESUBMITTAL FORM. | | | ADDITIONALLY, INSERT CORRECTED PAGES INTO THE ORIGINAL | | | SUBMITTAL AND REMOVE THE PREVIOUSLY REVIEWED SHEETS. | | | ONE COPY OF THE PREVIOUSLY REVIEWED SHEETS SHOULD | | | REMAIN IN PACKAGE AND BE MARKED OLD SHEETS. | | | | | | SINCERELY, | | | | | | JOHN PEARSON | | | ELECTRICAL PLANS EXAMINER | | | 561-805-6746 | | | [email protected] | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2021-08-12 |
|
|
Cont ID |
|
| Sent By |
gpatrie |
Date |
2021-08-12 |
Time |
08:55 |
Rev Time |
0.00 |
| Received By |
gpatrie |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-12 08:55:26 | NEW POLE DESIGN SUBMITTED. | | | THIS IS NOT IN THE CITY RIGHT-OF-WAY, FDOT. | | | | | | CONTACT: [email protected] |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2021-05-05 |
|
|
Cont ID |
|
| Sent By |
gpatrie |
Date |
2021-05-05 |
Time |
07:53 |
Rev Time |
0.00 |
| Received By |
gpatrie |
Date |
2021-05-05 |
Time |
07:52 |
Sent To |
|
|
| Notes |
| 2021-05-05 07:53:20 | SEE PREVIOUS COMMENTS. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2020-09-16 |
|
|
Cont ID |
|
| Sent By |
gpatrie |
Date |
2020-09-16 |
Time |
07:13 |
Rev Time |
0.00 |
| Received By |
gpatrie |
Date |
2020-09-16 |
Time |
07:12 |
Sent To |
|
|
| Notes |
| 2020-09-16 07:13:03 | NO POLE DESIGN SHOWN. | | | OKEECHOBEE BLVD IS A FDOT ROADWAY, PERMIT REQUIRED. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-09-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2021-08-23 |
Time |
07:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2021-08-13 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-08-13 |
Time |
18:26 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-06-08 |
Time |
13:50 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2021-06-07 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-06-07 |
Time |
13:23 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-06-07 |
Time |
13:21 |
Sent To |
|
|
| Notes |
| 2021-06-07 13:22:10 | EMAIL FROM CHRISTINA WARR (REAL ESTATE PROJECT MANAGER) | | | DATED 06/03/21 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2021-05-06 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-05-06 |
Time |
08:45 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-02-25 |
Time |
06:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-09-22 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-09-22 |
Time |
07:49 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-06-17 |
Time |
12:08 |
Sent To |
|
|
| Notes |
| 2020-06-17 16:40:44 | 06/17/2020 NEW INCOMING STOP WAS ADDED BECAUSE A | | | COMMUNICATIONS PERMIT MAY BE REQUIRED (CITY ORDINANCE | | | NO. 4774-18). THEREFORE, ZONING AND ENGINEERING REVIEWS | | | WERE ADDED. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2020-03-23 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-03-19 |
Time |
15:32 |
Sent To |
|
|
| Notes |
| 2020-03-19 15:32:38 | ELEC<5K |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2021-09-22 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2021-09-21 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2021-09-21 |
Time |
16:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2021-06-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-06-24 |
Time |
13:08 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-06-24 |
Time |
13:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2021-03-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-03-05 |
Time |
17:16 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-03-05 17:21:23 | DRAWING E5 HAS A COPY OF THE ENGINEER'S SEAL AND | | | SIGNATURE. NEED TO UPLOAD DRAWING WITH ENGINEER'S | | | DIGITAL SIGNATURE AS DONE WITH ALL OTHER PLANS UPLOADED | | | IN THIS SUBMITTAL. | | | DRAWINGS NEED TO HAVE THE ENGINEER'S DIGITAL SIGNATURE | | | FOLLOWING THE PROCEDURE OF SEC. 61G15-23.004 F.A.C TO | | | ALLOW FOR SIGNATURE VERIFICATION. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-07-02 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2020-07-02 |
Time |
17:53 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2020-07-02 |
Time |
17:53 |
Sent To |
|
|
| Notes |
| 2020-07-02 17:53:37 | 1-ENGINEER DRAWINGS SUBMITTED DON'T HAVE THE ENGINEER'S | | | ORIGINAL SIGNATURE. PLANS SUBMITTED HAVE A COPY OF THE | | | ENGINEER'S SIGNATURE. PLANS NEED TO HAVE THE ORIGINAL | | | SEAL AND SIGNATURE OF THE ENGINEER OF RECORD AS | | | REQUIRED BY SEC. 61G15-23.003 FAC AND CHAPTER 471 F.S. | | | WHEN SUBMITTING PLANS/DOCUMENTS FOR PUBLIC RECORDS. | | | | | | NOTE: | | | NEED TO PROVIDE HARD COPY OF DRAWINGS WITH ORIGINAL | | | SEAL AND SIGNATURE AS REQUIRED BY CHAPTER 472 F. S. OR | | | SUBMIT DIGITALLY SIGNED DRAWINGS FOLLOWING THE | | | PROCEDURE OF SEC.61G15-23.004. NOTE: COORDINATE WITH | | | CITY LIBRARIAN AT [email protected] FOR PROPER | | | UPLOADING. | | | | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
5 |
Status |
P |
Date |
2021-09-28 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-09-28 |
Time |
10:37 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-09-28 |
Time |
10:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
F |
Date |
2021-09-21 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-09-21 |
Time |
15:30 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-09-20 |
Time |
16:22 |
Sent To |
|
|
| Notes |
| 2021-09-21 15:33:08 | FAILED | | | | | | IN ACCORDANCE WITH THE WCF ROW REVIEW BY THE | | | ENGINEERING DEPARTMENT, YOU MUST ?REVISE LAT / LONG | | | LOCATIONS FOR CELL TOWER." | | | | | | CONTACT ERIC SCHNEIDER @ [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2021-08-06 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-08-06 |
Time |
15:13 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-08-06 |
Time |
14:42 |
Sent To |
|
|
| Notes |
| 2021-08-06 15:13:06 | FAILED | | | | | | 1) A PORTION OF THE UNDERGROUND POWER TRAVERSES ALABAMA | | | AVENUE, A CITY RIGHT-OF-WAY. A COMMUNICATIONS | | | FACILITIES PLACEMENT PERMIT APPLICATION - CITY | | | RIGHTS-OF-WAY MUST BE SUBMITTED TO THE CITY'S BUILDING | | | DIVISION AND APPROVED BY THE CITY'S PLANNING AND | | | ENGINEERING SERVICES DIVISIONS FOR THE ALABAMA AVENUE | | | PORTION OF THIS PROJECT PRIOR TO THIS PERMIT BEING | | | APPROVED. | | | | | | 2) PROVIDE A PROVIDE A SURVEY, PREPARED BY A FLORIDA | | | LICENSED SURVEYOR, WHICH SHOWS THE SIDEWALK, WITH | | | DIMENSIONS, AND THE RIGHT-OF-WAY LINE SO THAT STAFF CAN | | | VERIFY THAT THE UNDERGROUND POWER AND HANDHOLES | | | ASSOCIATED WITH THE WIRELESS COMMUNICATION FACILITY IS | | | WITHIN THE RIGHT-OF-WAY AND NOT ON PRIVATE PROPERTY. | | | | | | 3) THE UTILITY POWER PLAN NEEDS TO VERIFY THE SETBACK | | | FROM THE UNDERGROUND POWER AND HANDHOLES FROM THE | | | RIGHT-OF-WAY LINE. | | | | | | 4) PLEASE ENSURE THAT YOU COORDINATE WITH THE RELATED | | | SIDEWALK PROJECT FOR THE PLACEMENT OF THE FEATURES AT | | | THE NORTHEAST CORNER OF THE OKEECHOBEE BOULEVARD AND | | | ROSEMARY AVENUE INTERSECTION. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2021-03-04 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-03-04 |
Time |
11:41 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-03-04 |
Time |
11:41 |
Sent To |
|
|
| Notes |
| 2021-03-04 11:41:30 | FAILED - SAME COMMENTS | | | | | | 1) PROVIDE A PROVIDE A SURVEY, PREPARED BY A FLORIDA | | | LICENSED SURVEYOR, WHICH SHOWS THE POLE LOCATION, THE | | | HANDHOLES, THE UNDERGROUND ELECTRIC, THE SIDEWALK AND | | | THE RIGHT-OF-WAY LINE SO THAT STAFF CAN VERIFY THAT THE | | | WIRELESS COMMUNICATION FACILITY IS WITHIN THE | | | RIGHT-OF-WAY AND NOT ON PRIVATE PROPERTY. | | | | | | 2) PROVIDE A COPY OF THE FDOT APPROVAL IF THE SURVEY | | | SHOWS THE PROPOSED WIRELESS COMMUNICATION FACILITY IN | | | THE RIGHT-OF-WAY. | | | | | | 3) THE PLANS SUBMITTED WITH THE PERMIT MUST SHOW THAT | | | THE PROPOSED WIRELESS FACILITY (POLE) MEETS THE CITY OF | | | WEST PALM BEACH CONCEALMENT (STEALTH) OR STYLE AND | | | POSSIBLY HEIGHT REQUIREMENTS LISTED IN SECTIONS | | | 78-411(E), 78-411(F) AND 78-411(G) OF THE CITY CODE. | | | PROVIDE A POLE THAT MEETS THE CITY CODE REQUIREMENTS. | | | NOTE: VERIZON HAS SHOWN POLES ON OTHER APPLICATIONS FOR | | | OTHER LOCATIONS WITHIN THE CITY THAT MEET THE CITY CODE | | | REQUIREMENTS. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2020-07-31 |
Time |
11:42 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2020-07-31 |
Time |
11:35 |
Sent To |
|
|
| Notes |
| 2020-07-31 11:48:51 | FAILED | | | | | | 1) PROVIDE A PROVIDE A SURVEY, PREPARED BY A FLORIDA | | | LICENSED SURVEYOR, WHICH SHOWS THE POLE LOCATION AND | | | THE RIGHT-OF-WAY LINE SO THAT STAFF CAN VERIFY THAT THE | | | WIRELESS COMMUNICATION FACILITY IS WITHIN THE | | | RIGHT-OF-WAY AND NOT ON PRIVATE PROPERTY. THE | | | ENGINEERING PLAN SHOWS THE POLE, AND ELECTRIC BOX, | | | ENCROACHING PRIVATE PROPERTY, WHICH IS NOT PERMITTED | | | UNLESS THE CITY HAS APPROVED A WIRELESS COMMUNICATION | | | FACILITIES PERMIT. | | | | | | 2) PROVIDE A COPY OF THE FDOT APPROVAL IF THE SURVEY | | | SHOWS THE PROPOSED WIRELESS COMMUNICATION FACILITY IN | | | THE RIGHT-OF-WAY. | | | | | | 3) THE PLANS SUBMITTED WITH THE PERMIT SHOW THAT THE | | | PROPOSED WIRELESS FACILITY (POLE) DOES NOT MEET THE | | | CITY OF WEST PALM BEACH CONCEALMENT (STEALTH) OR STYLE | | | AND POSSIBLY HEIGHT REQUIREMENTS LISTED IN SECTIONS | | | 78-411(E), 78-411(F) AND 78-411(G) OF THE CITY CODE. | | | PROVIDE A POLE THAT MEETS THE CITY CODE REQUIREMENTS. | | | NOTE: VERIZON HAS SHOWN POLES ON OTHER APPLICATIONS FOR | | | OTHER LOCATIONS WITHIN THE CITY THAT MEET THE CITY CODE | | | REQUIREMENTS. | | | | | | 4) THE AREA WHERE THE PROPOSED POLE IS SHOWN IS | | | CURRENTLY UNDER RECONSTRUCTION TO CHANGE THE LOCATION | | | OF THE SIDEWALK AND THE LANDSCAPE AREA. THE LOCATION OF | | | THE POLE SHOWN ON THE ENGINEERING PLAN APPEARS TO BE | | | LOCATED IN THE MIDDLE OF THE PROPOSED BICYCLE LANE THAT | | | IS BEING CONSTRUCTED. PLEASE CONTACT CITYPLACE RETAIL | | | LLC FOR THE SPECIFIC PLANS SO THAT YOU CAN COORDINATE | | | LOCATING THE POLE OUTSIDE OF THE SIDEWALK AND AVOID THE | | | PROPOSED PALM TREES BEING INSTALLED IN THE RIGHT-OF-WAY | | | LANDSCAPE STRIP. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|