Plan Review Details - Permit 20030925
Plan Review Stops For Permit 20030925
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2020-05-28 Cont ID  
Sent By rmcphers Date 2020-05-28 Time 11:57 Rev Time 0.00
Received By rmcphers Date 2020-05-28 Time 10:56 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-05-11 Cont ID  
Sent By rmcphers Date 2020-05-11 Time 14:52 Rev Time 0.00
Received By rmcphers Date 2020-05-11 Time 14:52 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-04-07 Cont ID  
Sent By rmcphers Date 2020-04-07 Time 14:39 Rev Time 0.00
Received By rmcphers Date 2020-04-07 Time 14:35 Sent To  
Notes
2020-04-07 14:39:16WALL SIGN
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) DRAWINGS (ENGINEERING) DO NOT SHOW AS ELECTRONICALLY
 SIGNED IN "ADOBE". WHEN DRAWINGS ARE PRINTED OUT THEY
 ARE NO LONGER ELECTRONICALLY SIGNED. THE PATH FROM THE
 ENGINEER TO ELECTRONIC PLAN REVIEW MUST ALL BE
 ELECTRONIC.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-03-23 Cont ID  
Sent By rmcphers Date 2020-03-23 Time 14:01 Rev Time 0.00
Received By rmcphers Date 2020-03-23 Time 13:47 Sent To  
Notes
2020-03-23 14:01:06SIGN
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) DRAWING NEEDS TO BE ELECTRONICALLY SIGNED BY THE
 ENGINEER FOR USE IN ELECTRONIC PLAN REVIEW.
  

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2020-05-28 Cont ID  
Sent By jleahy Date 2020-05-28 Time 09:55 Rev Time 0.00
Received By jleahy Date 2020-05-28 Time 09:29 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2020-05-11 Cont ID  
Sent By jleahy Date 2020-05-11 Time 08:27 Rev Time 0.00
Received By jleahy Date 2020-05-11 Time 08:13 Sent To  
Notes
2020-05-11 08:28:57COMMENTS #1 AND 3 FROM ORIGINAL REVIEW STILL NOT
 ADDRESSED JLEAHY

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2020-04-13 Cont ID  
Sent By jleahy Date 2020-04-13 Time 15:32 Rev Time 0.00
Received By jleahy Date 2020-04-13 Time 15:22 Sent To  
Notes
2020-04-13 15:36:55SEE COMMENTS FROM FIRST REVIEW NOTHING CHAGED JLEAHY

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-03-27 Cont ID  
Sent By jleahy Date 2020-03-27 Time 07:49 Rev Time 0.00
Received By jleahy Date 2020-03-27 Time 07:49 Sent To  
Notes
2020-03-27 07:50:55ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) PLAN NOT DIGITALLY SIGNED.
  
 2) DISCONNECT MISSING PER 6006(A)(1)
  
 3) VALUE DOESN'T COVER LABOR VALUE SHALL INCLUDE "ALL"
 LABOR, AND MATERIALS.
  
 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF
 THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF
 BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS,
 MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE
 UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE
 DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED,
 QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS
 (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE
 BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION
 OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT
 VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING,
 MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK,
 ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2020-05-28 Cont ID  
Sent By rmcphers Date 2020-05-28 Time 11:57 Rev Time 0.00
Received By rmcphers Date 2020-05-12 Time 10:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-05-11 Cont ID  
Sent By rmcphers Date 2020-05-11 Time 14:53 Rev Time 0.00
Received By rmcphers Date 2020-04-30 Time 15:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-04-13 Cont ID  
Sent By jleahy Date 2020-04-13 Time 15:37 Rev Time 0.00
Received By jleahy Date 2020-04-06 Time 09:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-03-27 Cont ID  
Sent By lmarchan Date 2020-03-27 Time 13:31 Rev Time 0.00
Received By lmarchan Date 2020-03-19 Time 12:43 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2020-05-28 Cont ID  
Sent By rmcphers Date 2020-05-28 Time 11:56 Rev Time 0.00
Received By rmcphers Date 2020-05-28 Time 11:56 Sent To  
Notes
2020-05-12 16:39:34DIGITALLY SIGNED DOCUMENTS IN "SIGNATURES" FOLDER

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2020-05-11 Cont ID  
Sent By rmcphers Date 2020-05-11 Time 14:52 Rev Time 0.00
Received By rmcphers Date 2020-05-11 Time 14:52 Sent To  
Notes
2020-05-11 14:53:29DRAWINGS (ENGINEERING) DO NOT SHOW AS ELECTRONICALLY
 SIGNED IN "ADOBE". WHEN DRAWINGS ARE PRINTED OUT THEY
 ARE NO LONGER ELECTRONICALLY SIGNED. THE PATH FROM THE
 ENGINEER TO ELECTRONIC PLAN REVIEW MUST ALL BE
 ELECTRONIC.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-04-07 Cont ID  
Sent By rmcphers Date 2020-04-07 Time 14:39 Rev Time 0.00
Received By rmcphers Date 2020-04-07 Time 14:39 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-03-23 Cont ID  
Sent By rmcphers Date 2020-03-23 Time 14:01 Rev Time 0.00
Received By rmcphers Date 2020-03-23 Time 14:01 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2020-05-05 Cont ID  
Sent By llouie Date 2020-05-05 Time   Rev Time 0.00
Received By llouie Date 2020-05-05 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2020-04-08 Cont ID  
Sent By llouie Date 2020-04-08 Time   Rev Time 0.00
Received By llouie Date 2020-04-08 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-03-27 Cont ID  
Sent By llouie Date 2020-03-27 Time   Rev Time  
Received By llouie Date 2020-03-27 Time   Sent To  
Notes
2020-03-27 13:07:30 
 ** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) THE SIGN AREA SHALL NOT EXCEED 36 INCHES IN HEIGHT
 BY 60% OF THE WIDTH OF EACH SIDE OF THE BUILDING.
 PLEASE PROVIDE DIMENSIONS AND CALCULATIONS TO
 DEMONSTRATE THE COMPLIANCE WITH THE SIGN AREA. [ZLDR
 S.94-221(E)(1)]
  
  
 NOTES:
  
 * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS.
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
 * ZONE: BMUD-TYPE II
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved