Plan Review Details - Permit 20030726
| Plan Review Stops For Permit 20030726 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2020-04-02 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-04-02 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-04-02 |
Time |
14:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-03-24 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-03-24 |
Time |
08:25 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-03-24 |
Time |
08:25 |
Sent To |
|
|
| Notes |
| 2020-03-24 08:28:01 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | 1) SEPARATE PERMIT REQUIRED FOR ACCESS CONTROL, AND | | | REQUIRES FIRE REVIEW. | | | | | | 2) VALUE OF THE WORK SHOWN IS LOW PLEASE SUBMIT A | | | SIGNED CONTRACT FOR THE WORK INVOLVED. VALUE TO INCLUDE | | | ALL LABOR , MATERIAL ECT, ECT. | | | | | | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS | | | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2020-04-03 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-04-03 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-04-03 |
Time |
10:07 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2020-03-25 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-03-25 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-03-25 |
Time |
09:10 |
Sent To |
I |
|
| Notes |
| 2020-03-25 09:20:30 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | 1) ALL INSTALLED EQUIPMENT SHALL FUNCTION AS PER THE | | | REQUIREMENTS OF NFPA 101, CHAPTER 7, MEANS OF EGRESS AS | | | APPLICABLE BELOW PER EACH DOOR/ENTRY/EXIT. | | | | | | 7.2.1.5.6 ELECTRICALLY CONTROLLED EGRESS DOOR | | | ASSEMBLIES. DOOR ASSEMBLIES IN THE MEANS OF EGRESS | | | SHALL BE PERMITTED TO BE ELECTRICALLY LOCKED IF | | | EQUIPPED WITH APPROVED, LISTED HARDWARE, PROVIDED THAT | | | ALL OF THE FOLLOWING CONDITIONS ARE MET: | | | (1) THE HARDWARE FOR OCCUPANT RELEASE OF THE LOCK IS | | | AFFIXED TO THE DOOR LEAF. | | | (2) THE HARDWARE HAS AN OBVIOUS METHOD OF OPERATION | | | THAT IS READILY OPERATED IN THE DIRECTION OF EGRESS. | | | (3) THE HARDWARE IS CAPABLE OF BEING OPERATED WITH ONE | | | HAND IN THE DIRECTION OF EGRESS. | | | (4) OPERATION OF THE HARDWARE INTERRUPTS THE POWER | | | SUPPLY DIRECTLY TO THE ELECTRIC LOCK AND UNLOCKS THE | | | DOOR ASSEMBLY IN THE DIRECTION OF EGRESS. | | | (5)* LOSS OF POWER TO THE LISTED RELEASING HARDWARE | | | AUTOMATICALLY UNLOCKS THE DOOR ASSEMBLY IN THE | | | DIRECTION OF EGRESS. | | | (6) HARDWARE FOR NEW INSTALLATIONS IS LISTED IN | | | ACCORDANCE WITH ANSI/UL 294, STANDARD FOR ACCESS | | | CONTROL SYSTEM UNITS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | 2020-03-24 08:39:22 | SENT PLAN TO FIRE FOR ACCESS CONTROL. JLEAHY |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-04-03 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-04-03 |
Time |
11:01 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-04-01 |
Time |
10:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-03-25 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-03-25 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-03-16 |
Time |
12:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2020-04-03 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-04-03 |
Time |
11:01 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-04-03 |
Time |
11:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2020-03-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-03-24 |
Time |
14:06 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-03-24 |
Time |
14:06 |
Sent To |
|
|
| Notes |
|
|
|