Plan Review Details - Permit 20030650
Plan Review Stops For Permit 20030650
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-05-27 Cont ID  
Sent By rmcphers Date 2020-05-27 Time 09:40 Rev Time 0.00
Received By rmcphers Date 2020-05-27 Time 09:36 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-03-31 Cont ID  
Sent By rmcphers Date 2020-03-31 Time 16:24 Rev Time 0.00
Received By rmcphers Date 2020-03-31 Time 16:07 Sent To  
Notes
2020-03-31 16:24:07DECK
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT OR
 PROVIDE A STATEMENT ON THE DRAWINGS FROM THE DESIGNER
 FOR THE SOIL BEARING CAPACITY FBC 1803
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-03-31 Cont ID  
Sent By jpearson Date 2020-03-31 Time 16:35 Rev Time 0.00
Received By jpearson Date 2020-03-31 Time 15:22 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-03-27 Cont ID  
Sent By pleduc Date 2020-03-27 Time   Rev Time 0.00
Received By pleduc Date 2020-03-27 Time 11:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-05-27 Cont ID  
Sent By rmcphers Date 2020-05-27 Time 09:41 Rev Time 0.00
Received By rmcphers Date 2020-05-14 Time 09:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-04-08 Cont ID  
Sent By lmarchan Date 2020-04-08 Time 13:51 Rev Time 0.00
Received By lmarchan Date 2020-03-26 Time 08:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-04-02 Cont ID  
Sent By thunt Date 2020-04-02 Time 11:56 Rev Time 0.00
Received By tklarge Date 2020-04-01 Time 06:32 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-05-27 Cont ID  
Sent By rmcphers Date 2020-05-27 Time 09:41 Rev Time 0.00
Received By rmcphers Date 2020-05-27 Time 09:41 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-03-31 Cont ID  
Sent By jpearson Date 2020-03-31 Time 15:53 Rev Time 0.00
Received By jpearson Date 2020-03-31 Time 15:53 Sent To  
Notes
2020-03-31 15:53:26ALL SIGNATURES GOOD FOR THIS SUBMISSION. IF
 RE-SUBMISSION REQUIRED, ANY NEW PLAN SHEETS WILL NEED
 TO BE CHECKED. WPB FBC 105.1

Review Stop Z ZONING
Rev No 2 Status P Date 2020-05-20 Cont ID  
Sent By eschneid Date 2020-05-20 Time 16:24 Rev Time 0.25
Received By eschneid Date 2020-05-20 Time 15:46 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-04-08 Cont ID  
Sent By eschneid Date 2020-04-08 Time 12:11 Rev Time 0.50
Received By eschneid Date 2020-04-08 Time 11:47 Sent To  
Notes
2020-04-08 12:17:13FAILED
  
 1) THE ARCHITECTURAL SITE PLAN PROVIDED WITH THE PERMIT
 IS NOT THE APPROVED SITE PLAN. PROVIDE THE CORRECT SITE
 PLAN. BOHLER ENGINEERING HAS THE APPROVED SITE PLAN.
 CONTACT THEM TO GET A COPY.
  
 2) PROVIDE A DIMENSIONED SITE PLAN FOR THE PROPOSED
 DECK. THE BOHLER ENGINEERING SITE PLAN HAS THESE
 DIMENSIONS.
  
 3) THE DECK IS PROPOSED TO BE CONSTRUCTED OVER A 12
 FOOT UTILITY EASEMENT. YOU MUST PROVIDE EASEMENT
 RELEASE LETTER FROM ALL OF THE UTILITY COMPANIES.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]