| Plan Review Stops For Permit 20030644 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2020-03-27 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2020-03-27 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2020-03-27 |
Time |
14:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2020-04-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-04-13 |
Time |
08:46 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-04-13 |
Time |
08:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2020-03-31 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-03-31 |
Time |
11:45 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-03-31 |
Time |
11:45 |
Sent To |
|
|
| Notes |
| 2020-03-31 11:45:48 | ASBESTOS ? PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM | | | THE CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2020-05-23 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-05-23 |
Time |
14:54 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-05-22 |
Time |
15:44 |
Sent To |
|
|
| Notes |
| 2020-05-23 14:55:26 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | 3RD BUILDING REVIEW APPROVED WITH PROVISO: | | | | | | AWS D1.1 CLAUSE 3.1: AT TIME OF INSPECTION PLEASE | | | PROVIDE A WELD PROCEDURE SPECIFICATION; THE W.P.S. | | | SPECIFIES THE REQUIRED ESSENTIAL VARIABLES INCLUDING: | | | BASE MATERIALS, JOINTS, PROCESS, AND FILLER METALS TO | | | BE USED. | | | AWS D1.1 CLAUSE 4.15: AT TIME OF INSPECTION PLEASE | | | PROVIDE A WELDER PERFORMANCE QUALIFICATION RECORD; THE | | | W.P.Q.R. PROVIDES INFORMATION WHICH CAN BE USED TO | | | VERIFY THE WELDER?S QUALIFICATION AND CERTIFICATION AS | | | IT RELATES TO THE WELDING REQUIREMENTS OF THE PROJECT. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2020-04-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-04-13 |
Time |
08:45 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-04-13 |
Time |
08:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-03-31 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-03-31 |
Time |
11:44 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-03-31 |
Time |
10:10 |
Sent To |
|
|
| Notes |
| 2020-03-31 11:41:37 | SHELL ALTERATION | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE | | | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE | | | PRODUCT APPROVALS FOR THE NEW EXTERIOR WINDOWS AND | | | DOORS. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2020-03-31 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2020-03-31 |
Time |
13:51 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2020-03-31 |
Time |
10:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2020-05-26 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-05-26 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-05-26 |
Time |
11:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2020-04-10 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-04-10 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-04-10 |
Time |
12:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2020-03-25 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-03-25 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-03-25 |
Time |
14:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2020-06-01 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-06-01 |
Time |
10:06 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-06-01 |
Time |
10:06 |
Sent To |
|
|
| Notes |
| 2020-06-01 10:07:35 | A SEPARATE PERMIT IS REQUIRED FOR THE GAS PIPING WORK | | | UNDER THIS SHELL MODIFICATION PERMIT.- CCOLE-6/1/2020. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-06-01 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-06-01 |
Time |
16:55 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-05-22 |
Time |
14:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-04-14 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-04-14 |
Time |
14:29 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-04-09 |
Time |
10:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-04-02 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-04-02 |
Time |
09:23 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-03-24 |
Time |
14:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
N |
Date |
2020-03-24 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-03-24 |
Time |
14:52 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-03-24 |
Time |
14:52 |
Sent To |
|
|
| Notes |
| 2020-03-24 14:52:29 | SEE UPLOADED EMAIL FROM IMPACT FEE OFFICE. LEM |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
N |
Date |
2020-04-13 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-04-13 |
Time |
14:52 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-04-13 |
Time |
13:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2020-03-30 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-03-30 |
Time |
17:10 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-03-30 |
Time |
16:53 |
Sent To |
|
|
| Notes |
| 2020-03-30 17:16:54 | 1ST REVIEW FBC-2017 MECHANICAL | | | PERMIT #20030644 | | | 3/30/20 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | | 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) PLEASE PROVIDE MECHANICAL PLANS THAT CLEARLY | | | INDICATE THE SCOPE OF WORK FOR THE PROJECT- SECTION | | | 107.2.1 WPB. PLEASE SEE MECHANICAL DEMOLITION NOTE #1 | | | ON SHEET AD1.1 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | | UPDATED. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2020-06-01 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-06-01 |
Time |
10:06 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-06-01 |
Time |
08:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2020-04-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-04-14 |
Time |
14:21 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-04-14 |
Time |
11:12 |
Sent To |
|
|
| Notes |
| 2020-04-14 14:21:15 | 1) SHT.P101 - KEY NOTE #2 REFERS TO THE GREASE WASTE | | | LINE BUT BOTH LINES ON THE PLAN ARE LABELED AS | | | SANITARY. CLARIFY. | | | 2) SHT.P101SHOWS A GREASE WASTE LINE STUBBED INTO THE | | | SPACE BUT THIS GREASE LINE CONNECTS TO A LINE LABELED | | | "SANITARY".CLARIFY. | | | 3) SHT. P101 - SHOW THE DIAMETER OF THE GREASE LINE | | | STUB IN ON THE PLAN. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2020-03-27 |
|
|
Cont ID |
|
| Sent By |
jbaker |
Date |
2020-03-27 |
Time |
13:56 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-03-26 |
Time |
10:08 |
Sent To |
|
|
| Notes |
| 2020-03-27 13:57:11 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | FBC P = FBC PLUMBING | | | | | | PLUMBING COMMENTS: | | | | | | 1. 2017 FBC 107.2.1 CORRECT SHEET INDEX FOR PLUMBING | | | DRAWINGS ON G1.0.1 | | | 2. 2017 FBC 107.2.1 PROVIDE PLUMBING PIPING MATERIAL | | | SPECIFICATIONS AND SIZING CRITERIA (ANTICIPATED | | | FIXTURES, GREASE LOAD, AND GAS LOAD. WHERE IS EXISTING | | | GAS SHOWN? PROVIDE A NARRATIVE SCOPE OF WORK FOR THE | | | PLUMBING. | | | | | | | | | REVIEWED REMOTELY BY JAMES BAKER, PE | | | PX3997, PE77268 | | | 561-805-6724 | | | [email protected] | | | | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2020-05-23 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-05-23 |
Time |
14:55 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-05-22 |
Time |
15:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2020-04-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-04-13 |
Time |
08:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-04-13 |
Time |
08:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-03-31 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2020-03-31 |
Time |
13:42 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2020-03-31 |
Time |
13:42 |
Sent To |
|
|
| Notes |
| 2020-03-31 13:42:25 | ALL SHEETS GOOD ON FIRST REVIEW. ANY NEW SHEETS | | | SUBMITTED FOR NEXT REVIEW WILL NEED TO BE CHECKED. WPB | | | FBC 107.1; FS 471/481 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2020-06-01 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2020-06-01 |
Time |
16:52 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2020-06-01 |
Time |
16:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2020-04-13 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2020-04-13 |
Time |
10:51 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2020-04-13 |
Time |
10:51 |
Sent To |
|
|
| Notes |
| 2020-04-13 10:51:39 | FAILED | | | | | | PROVIDE WRITTEN RESPONSES TO COMMENTS. | | | | | | 1) UPDATED COMMENT: HIBISCUS ELEVATION | | | | | | A. SHEET AD.1.1 SHOWS NOTE D17 (EXISTING PILASTERS TO | | | REMAIN) POINTING TO TWO PILASTERS THAT ARE DASHED | | | (REMOVAL SYMBOL). SHEET A2.0.1 HAS NOTE 18 (REMOVE | | | EXISTING PILASTER) POINTING TO THE TWO PILASTERS. BASED | | | ON THE PROPOSED PLANS, IT DOES APPEAR THESE ARE BEING | | | REMOVED, SO UPDATED THE NOTE TAG (D17) TO REFLECT THE | | | REMOVAL. | | | | | | B. THE AREA THAT IS 22 FEET 2 INCHES WIDE IS DASHED | | | (REMOVAL SYMBOL) FOR ITS ENTIRE LENGTH; HOWEVER, THE | | | NORTH ELEVATION - DEMOLITION ON SHEET A2.0.1 ONLY SHOWS | | | A LIMITED AREA BEING REMOVED. THE NORTH ELEVATION - | | | PROPOSED NOTE 15 INDICATES ENTIRE WALL BEING REMOVED | | | AND THEN REBUILT. THE TWO SHEETS NEED TO SHOW THE SAME | | | CONDITIONS. UPDATE THE DEMOLITION ELEVATION TO SHOW | | | ACCURATE DEMOLITION. | | | | | | 2) UPDATED COMMENT: THANK YOU FOR PROVIDING THE THE | | | TRANSPARENCY CALCULATIONS FOR THE NORTH, WEST AND SOUTH | | | ELEVATIONS. THE WEST AND SOUTH ELEVATIONS MEET THE | | | MINIMUM OF 50% TRANSPARENCY REQUIREMENT. THE NORTH | | | ELEVATION DOES NOT MEET THE MINIMUM 50% TRANSPARENCY | | | REQUIREMENT. THE 1,235 SQUARE FEET OF FACADE REQUIRE A | | | MINIMUM OF 617.5 SQUARE FEET OF TRANSPARENCY. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2020-04-02 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2020-04-02 |
Time |
09:13 |
Rev Time |
0.75 |
| Received By |
eschneid |
Date |
2020-04-02 |
Time |
09:13 |
Sent To |
|
|
| Notes |
| 2020-04-02 09:14:44 | FAILED | | | | | | PROVIDE WRITTEN RESPONSES TO COMMENTS. | | | | | | 1) THE DEMOLITION SHOWN ALONG HIBISCUS STREET (NORTH | | | ELEVATION) ON SHEET AD.1.1 DOES NOT MATCH THE | | | DEMOLITION SHOWN ON THE ELEVATION ON SHEET A2.0.1. | | | THERE IS NEW CONSTRUCTION ON SHEET A2.0.1 THAT DOES NOT | | | MATCH WHERE DEMOLITION IS AND IS NOT BEING SHOWN. | | | | | | 2) THE DEMOLITION SHOWN ALONG THE PLAZA (WEST AND SOUTH | | | ELEVATIONS) ON SHEET AD.1.1 DOES NOT MATCH THE | | | DEMOLITION SHOWN ON THE ELEVATION ON SHEET A2.0.2. | | | THERE IS NEW CONSTRUCTION ON SHEET A2.0.2 THAT DOES NOT | | | MATCH WHERE DEMOLITION IS AND IS NOT BEING SHOWN. | | | | | | 3) PROVIDE THE TRANSPARENCY CALCULATIONS FOR THE NORTH, | | | WEST AND SOUTH ELEVATIONS. A MINIMUM OF 50% | | | TRANSPARENCY IS REQUIRED ON EACH FRONTAGE BETWEEN GRADE | | | AND 10 FEET IN HEIGHT. | | | | | | 4) DOORS 103, 104 AND 105 ON THE WEST ELEVATION DO NOT | | | CONFORM TO THE TYPES THEY ARE REFERENCED FROM SHEET | | | A3.0.1 DOOR SCHEDULE/TYPES. PLEASE VERIFY THESE CROSS | | | REFERENCES. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] |
|
|