Plan Review Details - Permit 20030563
Plan Review Stops For Permit 20030563
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2020-03-24 Cont ID  
Sent By cpuell Date 2020-03-24 Time 14:10 Rev Time 0.00
Received By cpuell Date 2020-03-24 Time 14:10 Sent To  
Notes
2020-03-24 14:11:26HAD SPOKE TO M SANCHEZ BUILDING ADDRESS HAD ALREADY
 BEEN ESTABLISHED. HOWEVER STILL NEED A LIST OF THE
 INDIVIDUAL UNIT NUMBERS. PLEASE COORDINATE WITH ME
 [email protected] 561-805-6659

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2020-10-21 Cont ID  
Sent By rmcphers Date 2020-10-21 Time 07:59 Rev Time 0.00
Received By rmcphers Date 2020-10-21 Time 07:59 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2020-10-09 Cont ID  
Sent By rmcphers Date 2020-10-09 Time 10:21 Rev Time 0.00
Received By rmcphers Date 2020-10-09 Time 10:10 Sent To  
Notes
2020-10-09 10:02:25NEW APT. BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) REVISED DRAWING (S7.1) SHOWS WIND DESIGN
 CALCULATIONS USING ASCE 7-16 - SHOULD BE USING ASCE
 7-10 PER FBC CHAPTER 35
  
 PROVISO:
 A) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE
 REQUIRED FOR:
 LIGHT POLES/SITE LIGHTING
 PARKING LOT
 DETACHED STRUCTURES - GAZEBO ETC.
 B) PROVIDE FLOORING IIC AND STC ACOUSTICAL TEST REPORTS
 FOR REVIEW FOR THE TILE FLOORING BEFORE FLOORING
 INSTALLATION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-08-13 Cont ID  
Sent By rmcphers Date 2020-08-13 Time 13:50 Rev Time 0.00
Received By rmcphers Date 2020-08-13 Time 13:00 Sent To  
Notes
2020-08-13 13:33:16NEW 3 STORY APT. BLDG.
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 2ND REVIEW
 1) PRODUCT APPROVAL PROVIDED FOR THE DWELLING UNIT
 INSWING EXTERIOR DOORS DOES NOT MEET THE WATER
 INFILTRATION REQUIREMENTS OF FBC 1709.5.1
 2) DOORS THAT OPEN INTO THE UNITS NEED TO COMPLY WITH
 WATER INFILTRATION REQUIREMENTS PER FBC 1709.5.1
 3) PRODUCT APPROVAL 19-0219.11 FOR THE SLIDING GLASS
 DOOR DOES NOT MEET THE IMPACT REQUIREMENTS FBC 1609.1.2
 (PLEASE PROVIDE A COMPLETE SHUTTER PRODUCT APPROVAL.)
 4) PRODUCT APPROVAL 17-0614.05 FOR THE FIXED GLASS DOES
 NOT MEET THE IMPACT REQUIREMENTS FBC 1609.1.2 (PLEASE
 PROVIDE A COMPLETE SHUTTER PRODUCT APPROVAL)
 5) PLEASE SHOW THE FLOORING SOUND TRANSMISSION TO
 COMPLY WITH FBC 1207 AS NOTED BELOW (A, B AND C) (YOU
 NEED TO PROVIDE THE ACOUSTICAL LAB TEST REPORTS)
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.
 THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM
 CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED
 GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NONCOMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-04-03 Cont ID  
Sent By rmcphers Date 2020-04-03 Time 09:14 Rev Time 0.00
Received By rmcphers Date 2020-04-01 Time 08:53 Sent To  
Notes
2020-04-03 09:14:39NEW 3 STORY APT. BLDG.
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE A SIGNED AND SEALED SURVEY SHOWING
 THE BASE FLOOD ELEVATION PER THE LATEST FIRM.
 2) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE EXTERIOR DOORS AND WINDOWS.
 3) DOORS THAT OPEN INTO THE UNITS NEED TO COMPLY WITH
 WATER INFILTRATION REQUIREMENTS PER FBC 1709.5.1
 4) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE ROOFING SYSTEMS.
 5) SEPARATE PERMITS ARE REQUIRED FOR - PAVING/PARKING,
 DUMPSTER, RETAINING WALLS, PAVILION ETC. PLEASE PROVIDE
 NOTES TO VERIFY THE UNDERSTANDING OF SUCH.
 6) PLEASE SHOW THE FLOORING SOUND TRANSMISSION TO
 COMPLY WITH FBC 1207 AS NOTED BELOW (A,B AND C)
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.
 THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM
 CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED
 GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
  
 MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO
 DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST
 REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE
 MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT)
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-08-13 Cont ID  
Sent By jleahy Date 2020-08-13 Time 11:16 Rev Time 0.00
Received By jleahy Date 2020-08-13 Time 11:16 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-04-21 Cont ID  
Sent By jpearson Date 2020-04-21 Time 15:50 Rev Time 0.00
Received By jpearson Date 2020-04-20 Time 15:28 Sent To  
Notes
2020-04-21 14:32:06CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
 FAC = FLORIDA ADMINISTRATIVE CODE
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. FIRE ALARM, LOW VOLTAGE SYSTEMS, DAS, LIGHTNING
 PROTECTION, GENERATORS, COMMERCIAL HOOD SYSTEMS, WALK
 IN COOLERS, SIGNS, SITE LIGHTING, AND SWIMMING POOLS
 (WHERE APPLICABLE) ARE NOT INCLUDED IN THE SCOPE OF
 THIS PLAN REVIEW. PROVIDE A BLOCK NOTE INDICATING THE
 REQUIRED SEPARATE PERMITS AND PLAN SUBMITTALS FOR ANY
 OF THESE SYSTEMS PRESENT. WPB FBC 105.1, 107.2.1
 2. RISER DIAGRAM SHOWS THREE SETS OF THREE 400 KCMIL
 CONDUCTORS FOR THE FEEDERS FROM FPL. THIS WOULD
 INDICATE THAT THIS IS A SINGLE PHASE SERVICE, BUT THE
 RISER INDICATED THIS IS A THREE PHASE SERVICE. PROVIDE
 CLARIFICATION AND/OR CORRECTIONS. NEC 215.5; WPB FBC
 107.2.1
 3. PROVIDE ACCURATE LOAD CALCULATION INCLUDING ALL
 LOADS. IT APPEARS FOR THE METER CENTER THAT NEC 220.84
 IS BEING USED, BUT THIS CODE SECTION IS NOT APPLIED
 CORRECTLY. ALL LOADS AT 100% SHOULD BE ADDED TOGETHER
 AND THEN THE DEMAND FACTOR OF 34% APPLIED TO THIS
 AMOUNT BASED ON 26 DWELLING UNITS. IT ALSO APPEARS THAT
 100% OF THE LOADS FROM EACH UNIT IS NOT BEING USED
 CORRECTLY. THIS SHOULD INCLUDE ALL ITEMS DETAILED IN
 NEC 220.84(C), INCLUDING ONLY THE LARGER OF THE AC OR
 HEAT LOAD. WHEN THIS NUMBER IS CALCULATED, THEN 100% OF
 THE HOUSE LOAD WOULD BE ADDED TO THAT FOR THE FINAL VA
 LOAD BASED ON NEC 220.84(B). NEC 220
 4. BASED ON LOADS DETAILED IN THIS SUBMISSION, I HAVE
 CALCULATED THE LOAD ON THE SERVICE TO BE 1078 AMPS,
 WHICH IS LARGER THAN THE DESIGNED SERVICE SUPPLIED.
 PROVIDE CLARIFICATIONS AND/OR CORRECTIONS AS NEEDED FOR
 SERVICE EQUIPMENT AND FEEDERS. NEC 215.2, 220.84,
 408.30, 408.36
 5. PANEL SCHEDULE FOR EACH UNIT SHOW A DIFFERENT LOAD
 THAN THE LOAD CALCULATION TABLES. IT APPEARS THAT THIS
 IS DUE TO THE CORRECT TYPE OF LOAD CALCULATION FOR
 DWELLING UNITS NOT BEING USED, WHICH WOULD INCLUDE 3VA
 PER SQUARE FOOT. INFORMATION SHOULD BE CONSISTENT.
 CORRECT DISCREPANCIES. WPB FBC 107.2.1; NEC 220
 6. IF SERVICE OR FEEDER SIZES ARE CHANGED, PROVIDE
 UPDATED AIC CALCULATIONS. NEC 110.9, 110.10
 7. PROVIDE NOTES TO INDICATE THE REQUIRED MARKING OF
 SERVICE EQUIPMENT FOR ARC FLASH HAZARD WARNING AND
 AVAILABLE FAULT CURRENT PER CODE. NEC 110.16, 110.24
 8. UNITS 2A AND 2B ALL SHOW THE FOLLOWING CODE
 VIOLATION. A MINIMUM OF ONE 20 AMPERE BRANCH CIRCUIT
 SHALL BE PROVIDED TO SUPPLY BATHROOM RECEPTACLE
 OUTLET(S). SUCH CIRCUITS SHALL HAVE NO OTHER OUTLETS.
 THIS CIRCUIT CAN BE USED FOR LIGHTING AND RECEPTACLE
 OUTLETS IN ONE BATHROOM, BUT THEN CANNOT BE USED TO
 FEED ANOTHER BATHROOM. OR, THIS CIRCUIT CAN FEED ONLY
 THE RECEPTACLES IN MULTIPLE BATHROOMS. PROVIDE
 CORRECTION. NEC 210.11(C)(3)
 9. PROVIDE TAMPER RESISTANT RECEPTACLES PER CODE. A
 NOTE WILL SUFFICE. NEC 406.12
 10. LIGHT FIXTURE SCHEDULE DOES NOT INDICATE FIXTURES
 THAT ARE RATED FOR WET LOCATIONS FOR SHOWERS, OR HAVE
 ENCLOSED LIGHT BULBS FOR CLOSETS. PROVIDE NOTE OF
 COMPLIANCE FOR EACH LOCATION. NEC 410.10(D), 410.16
 11. PROVIDE COMPLIANCE FOR DWELLING UNITS: A MINIMUM OF
 75 PERCENT OF THE LAMPS IN PERMANENTLY INSTALLED
 LIGHTING FIXTURES SHALL BE HIGH-EFFICACY LAMPS OR A
 MINIMUM OF 75 PERCENT OF THE PERMANENTLY INSTALLED
 LIGHTING FIXTURES SHALL CONTAIN ONLY HIGH EFFICACY
 LAMPS. A NOTE WILL SUFFICE. FBC EC C405.1, R404.1
 12. AFCI PROTECTION SHOWN IS NOT CODE COMPLIANT. ALL
 BRANCH CIRCUITS THAT SUPPLY 120-VOLT, SINGLE-PHASE, 15-
 AND 20-AMPERE OUTLETS INSTALLED IN KITCHENS, FAMILY
 ROOMS, DINING ROOMS, LIVING ROOMS, PARLORS, LIBRARIES,
 DENS, BEDROOMS, SUN-ROOMS, RECREATIONS ROOMS, CLOSETS,
 HALLWAYS, LAUNDRY AREAS AND SIMILAR ROOMS OR AREAS
 SHALL BE AFCI PROTECTED. THIS INCLUDES LIGHTING AND
 POWER OUTLETS AND RECEPTACLES. SOME AREAS REQUIRE BOTH
 AFCI AND GFCI PROTECTION. PROVIDE CORRECTION. NEC
 210.8, 210.12
 13. THERE IS A DISCREPANCY WITH FLOOR PLAN, RISER
 DIAGRAM AND LOAD CALCULATIONS. THE RISER SHOWS A UNIT
 1209, BUT THIS IS NOT INCLUDED IN LOAD CALCS OR FLOOR
 PLAN. IT APPEARS THAT THE HOUSE PANEL HAS BEEN CONFUSED
 FOR UNIT 1205. CORRECT DISCREPANCIES SO THAT ALL
 INFORMATION IS CONSISTENT. WPB FBC 107.2.1
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, PROVIDE A RESPONSE LETTER ADDRESSING EACH
 ITEM ALONG WITH THE CITY RESUBMITTAL FORM.
 ADDITIONALLY, INSERT CORRECTED PAGES INTO THE ORIGINAL
 SUBMITTAL AND REMOVE THE PREVIOUSLY REVIEWED SHEETS.
 ONE COPY OF THE PREVIOUSLY REVIEWED SHEETS SHOULD
 REMAIN IN PACKAGE AND BE MARKED OLD SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2020-08-19 Cont ID  
Sent By rrossano Date 2020-08-19 Time   Rev Time 0.00
Received By rrossano Date 2020-08-19 Time   Sent To  
Notes
2020-08-19 07:55:50REVIEWED UNDER FORMAL ENGINEERING SUBMITTAL E19100032.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2020-04-30 Cont ID  
Sent By shill Date 2020-04-30 Time 07:07 Rev Time 0.00
Received By shill Date 2020-04-30 Time 07:07 Sent To  
Notes
2020-04-30 07:07:24CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT
 APPLICATION IF REQUIRED
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE
  
 MAIN PHONE: (561) 822-1200
  
 IF YOU HAVE AN ISSUED ENGINEERING PERMIT, OR A PENDING
 APPLICATION, PLEASE ADVISE VIA EMAIL ([email protected])
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-07-17 Cont ID  
Sent By pleduc Date 2020-07-17 Time   Rev Time 0.00
Received By pleduc Date 2020-07-16 Time 13:17 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2020-03-30 Cont ID  
Sent By pleduc Date 2020-03-30 Time   Rev Time 0.00
Received By pleduc Date 2020-03-27 Time 16:12 Sent To  
Notes
2020-03-27 16:25:17THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) SHEET FA 2.1 - THERE DOES NOT APPEAR TO BE
 NOTIFICATION DEVICES WITHIN THE SLEEPING ROOMS
  
 PER NFPA 101, CH 30
  
 30.3.4 DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.
 30.3.4.1 GENERAL.
 30.3.4.1.1 APARTMENT BUILDINGS FOUR OR MORE STORIES IN
 HEIGHT OR
 WITH MORE THAN 11 DWELLING UNITS, OTHER THAN THOSE
 MEETING THE
 REQUIREMENTS OF 30.3.4.1.2, SHALL BE PROVIDED WITH A
 FIRE ALARM
 SYSTEM IN ACCORDANCE WITH SECTION 9.6, EXCEPT AS
 MODIFIED BY
 30.3.4.2 THROUGH 30.3.4.5.
  
 30.3.4.3 NOTIFICATION.
 30.3.4.3.1 OCCUPANT NOTIFICATION SHALL BE PROVIDED
 AUTOMATICALLY
 IN ACCORDANCE WITH SECTION 9.6, AND BOTH OF THE
 FOLLOWING SHALL
 ALSO APPLY:
 (1) VISIBLE SIGNALS SHALL BE INSTALLED IN UNITS
 DESIGNED FOR THE
 HEARING IMPAIRED.
 (2) POSITIVE ALARM SEQUENCE IN ACCORDANCE WITH 9.6.3.4
 SHALL BE
 PERMITTED.
  
 9.6.3.5 UNLESS OTHERWISE PROVIDED IN 9.6.3.5.1 THROUGH
 9.6.3.5.8,
 NOTIFICATION SIGNALS FOR OCCUPANTS TO EVACUATE SHALL BE
 AUDIBLE, AND
 VISIBLE SIGNALS IN ACCORDANCE WITH NFPA 72, NATIONAL
 FIRE ALARM
 AND SIGNALING CODE. AND ICC/ANSI A117.1, AMERICAN
 NATIONAL
 STANDARD FOR ACCESSIBLE AND USABLE BUILDINGS AND
 FACILITIES, OR
 OTHER MEANS OF NOTIFICATION ACCEPTABLE TO THE AUTHORITY
 HAVING
 JURISDICTION SHALL BE PROVIDED.
  
 NFPA 72
  
 18.4.5 SLEEPING AREA REQUIREMENTS.
 18.4.5.1* WHERE AUDIBLE APPLIANCES ARE INSTALLED TO
 PROVIDE
 SIGNALS FOR SLEEPING AREAS, THEY SHALL HAVE A SOUND
 LEVEL OF AT
 LEAST 15 DB ABOVE THE AVERAGE AMBIENT SOUND LEVEL OR 5
 DB
 ABOVE THE MAXIMUM SOUND LEVEL HAVING A DURATION OF AT
 LEAST
 60 SECONDS OR A SOUND LEVEL OF AT LEAST 75 DBA,
 WHICHEVER IS
 GREATER, MEASURED AT THE PILLOW LEVEL IN THE AREA
 REQUIRED TO BE
 SERVED BY THE SYSTEM USING THE A-WEIGHTED SCALE (DBA).
 18.4.5.2 IF ANY BARRIER, SUCH AS A DOOR, CURTAIN, OR
 RETRACTABLE
 PARTITION, IS LOCATED BETWEEN THE NOTIFICATION
 APPLIANCE AND
 THE PILLOW, THE SOUND PRESSURE LEVEL SHALL BE MEASURED
 WITH THE
 BARRIER PLACED BETWEEN THE APPLIANCE AND THE PILLOW.
  
 PLEASE REVIEW AND CORRECT OR PROVIDE SPECIFIC CODE
 REFERENCES AND NARRATIVE AS TO WHY NOT.
  
  
  
 1A) FOR INFORMATIONAL AND FALSE ALARM REDUCTION
 PURPOSES THE LOCATION OF MAUNAL PULL STATIONS MAY BE
 REDUCED PER NFPA 101, CH 9
  
 9.6.2.6* FOR FIRE ALARM SYSTEMS USING AUTOMATIC FIRE
 DETECTION OR
 WATERFLOW DETECTION DEVICES TO INITIATE THE FIRE ALARM
 SYSTEM IN
 ACCORDANCE WITH CHAPTERS 11 THROUGH 43, NOT LESS THAN
 ONE MANUAL
 FIRE ALARM BOX, LOCATED AS REQUIRED BY THE AUTHORITY
 HAVING
 JURISDICTION, SHALL BE PROVIDED TO INITIATE A FIRE
 ALARM SIGNAL.
  
 A.9.6.2.6 THE MANUAL FIRE ALARM BOX REQUIRED BY 9.6.2.6
 IS INTENDED
 TO PROVIDE A MEANS TO MANUALLY ACTIVATE THE FIRE ALARM
 SYSTEM WHEN THE AUTOMATIC FIRE DETECTION SYSTEM OR
 WATERFLOW DEVICES
 ARE OUT OF SERVICE DUE TO MAINTENANCE OR TESTING, OR
 WHERE
 HUMAN DISCOVERY OF THE FIRE PRECEDES AUTOMATIC
 SPRINKLER SYSTEM
 OR AUTOMATIC DETECTION SYSTEM ACTIVATION. WHERE THE
 FIRE ALARM
 SYSTEM IS CONNECTED TO A MONITORING FACILITY, THE
 MANUAL FIRE
 ALARM BOX REQUIRED BY 9.6.2.6 SHOULD BE CONNECTED TO A
 SEPARATE
 CIRCUIT THAT IS NOT PLACED ?ON TEST? WHEN THE DETECTION
 OR SPRINKLER
 SYSTEM IS PLACED ON TEST. THE MANUAL FIRE ALARM BOX
 SHOULD BE
 LOCATED IN AN AREA THAT IS ACCESSIBLE TO OCCUPANTS OF
 THE BUILDING
 AND SHOULD NOT BE LOCKED.
  
 PLEASE REVIEW AND IF IN AGREEMENT, CONSULT WITH MY
 OFFICE FOR A SUITABLE LOCATION
  
 PROVIDE AN APPLICABLE NOTE.
  
  
 2) SHEET FP 2 - NO FIRE SPRINKLER IN THE ELEVATOR PIT
  
 PER NFPA 13R
  
 6.6.8 ALL SITUATIONS REGARDING SPRINKLER LOCATION AND
 POSITION
 THAT ARE NOT DIRECTLY DISCUSSED IN NFPA 13R SHALL BE IN
 ACCORDANCE
 WITH NFPA 13.
  
 8.15.5 ELEVATOR HOISTWAYS AND MACHINE ROOMS.
 8.15.5.1* SIDEWALL SPRAY SPRINKLERS SHALL BE INSTALLED
 AT THE BOTTOM
 OF EACH ELEVATOR HOISTWAY NOT MORE THAN 2 FT (0.61 M)
 ABOVE THE FLOOR OF THE PIT.
 8.15.5.2 THE SPRINKLER REQUIRED AT THE BOTTOM OF THE
 ELEVATOR
 HOISTWAY BY 8.15.5.1 SHALL NOT BE REQUIRED FOR
 ENCLOSED, NONCOMBUSTIBLE
 ELEVATOR SHAFTS THAT DO NOT CONTAIN COMBUSTIBLE
 HYDRAULIC FLUIDS.
 8.15.5.3 AUTOMATIC FIRE SPRINKLERS SHALL NOT BE
 REQUIRED IN ELEVATOR
 MACHINE ROOMS, ELEVATOR MACHINERY SPACES, CONTROL
 SPACES, OR
 HOISTWAYS OF TRACTION ELEVATORS INSTALLED IN ACCORDANCE
 WITH THE
 APPLICABLE PROVISIONS IN NFPA 101, OR THE APPLICABLE
 BUILDING
 CODE, WHERE ALL OF THE FOLLOWING CONDITIONS ARE MET:
 (1) THE ELEVATOR MACHINE ROOM, MACHINERY SPACE, CONTROL
 ROOM, CONTROL SPACE, OR HOISTWAY OF TRACTION ELEVATOR
 IS
 DEDICATED TO ELEVATOR EQUIPMENT ONLY.
 (2) THE ELEVATOR MACHINE ROOM, MACHINE ROOM, MACHINERY
 SPACE, CONTROL ROOM, CONTROL SPACE, OR HOISTWAY OF
 TRACTION
 ELEVATORS ARE PROTECTED BY SMOKE DETECTORS, OR OTHER
 AUTOMATIC
 FIRE DETECTION, INSTALLED IN ACCORDANCE WITH NFPA72.
 (3) THE ELEVATOR MACHINERY SPACE, CONTROL ROOM, CONTROL
 SPACE,
 OR HOISTWAY OF TRACTION ELEVATORS IS SEPARATED FROM THE
 REMAINDER
 OF THE BUILDING BY WALLS AND FLOOR/CEILING OR ROOF/
 CEILING ASSEMBLIES HAVING A FIRE RESISTANCE RATING OF
 NOT LESS
 THAN THAT SPECIFIED BY THE APPLICABLE BUILDING CODE.
 (4) NO MATERIALS UNRELATED TO ELEVATOR EQUIPMENT ARE
 PERMITTED
 TO BE STORED IN ELEVATOR MACHINE ROOMS, MACHINERY
 SPACES, CONTROL ROOMS, CONTROL SPACES, OR HOISTWAYS OF
 TRACTION
 ELEVATORS.
 (5) THE ELEVATOR MACHINERY IS NOT OF THE HYDRAULIC
 TYPE.
 8.15.5.4* AUTOMATIC SPRINKLERS IN ELEVATOR MACHINE
 ROOMS OR
 AT THE TOPS OF HOISTWAYS SHALL BE OF ORDINARY- OR
 INTERMEDIATETEMPERATURE
 RATING.
 8.15.5.5* UPRIGHT, PENDENT, OR SIDEWALL SPRAY
 SPRINKLERS SHALL
 BE INSTALLED AT THE TOP OF ELEVATOR HOISTWAYS.
 8.15.5.6 THE SPRINKLER REQUIRED AT THE TOP OF THE
 ELEVATOR HOISTWAY
 BY 8.15.5.5 SHALL NOT BE REQUIRED WHERE THE HOISTWAY
 FOR PASSENGER
 ELEVATORS IS NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE AND
 THE CAR ENCLOSURE MATERIALS MEET THE REQUIREMENTS OF
 ASME
 A17.1, SAFETY CODE FOR ELEVATORS AND ESCALATORS.
  
 8.15.5.7 COMBUSTIBLE SUSPENSION IN ELEVATORS.
 8.15.5.7.1 SPRINKLERS SHALL BE INSTALLED AT THE TOP AND
 BOTTOM OF
 ELEVATOR HOISTWAYS WHERE ELEVATORS UTILIZE COMBUSTIBLE
 SUSPENSION
 MEANS SUCH AS NONCIRCULAR ELASTOMERIC-COATED OR
 POLYURETHANECOATED
 STEEL BELTS.
 8.15.5.7.2 THE SPRINKLERS IN THE ELEVATOR HOISTWAY
 SHALL NOT BE
 REQUIRED WHEN THE SUSPENSION MEANS PROVIDE NOT LESS
 THAN AN
 FT-1 RATING WHEN TESTED TO THE VERTICAL BURN TEST
 REQUIREMENTS
 OF UL 62, FLEXIBLE CORDS AND CABLES, AND UL 1581,
 REFERENCE STANDARD
 FOR ELECTRICAL WIRES, CABLES, AND FLEXIBLE CORDS.
  
 PLEASE REVIEW AND PROVIDE DETAILS OR CORRECT
  
  
  
 3) SHEET 2.3 - THERE ARE INDICATIONS OF FIRE LINE
 UNDERGROUND.
  
 ALL FIRE LAINE UNDERGROUND WORK SHALL BE DONE UNDER
 SEPARATE PERMIT AND SHOP DRAWINGS IN COMPLIANCE WITH
 NFPA 24, STANDARD FOR THE
 INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR
 APPURTENANCES,2013 EDITION
  
 PLEASE REVIEW AND PROVIDE AN APPLICABLE NOTE OF
 ACKNOWLEDGEMENT.
  
  
  
 4) SHEET E 7.4 - THERE ARE INDICATIONS OF A BDA SYSTEM.
  
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
 NFPA 72, 24.5.2* TWO-WAY RADIO COMMUNICATIONS
 ENHANCEMENT SYSTEMS.
 24.5.2.2 RADIO COVERAGE. RADIO COVERAGE SHALL BE
 PROVIDED THROUGHOUT THE BUILDING AS A PERCENTAGE OF
 FLOOR AREA AS SPECIFIED IN 24.5.2.2.1 THROUGH
 24.5.2.2.3.
 24.5.2.2.1 CRITICAL AREAS. CRITICAL AREAS, SUCH AS THE
 EMERGENCY COMMAND CENTER(S), THE FIRE PUMP ROOM(S),
 EXIT STAIRS, EXIT PASSAGEWAYS, ELEVATOR LOBBIES,
 STANDPIPE CABINETS, SPRINKLER SECTIONAL VALVE
 LOCATIONS, AND OTHER AREAS DEEMED CRITICAL BY THE
 AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED WITH
 99 PERCENT FLOOR AREA RADIO COVERAGE.
 24.5.2.2.2 GENERAL BUILDING AREAS. GENERAL BUILDING
 AREAS SHALL BE PROVIDED WITH 90 PERCENT FLOOR AREA
 RADIO COVERAGE.
 24.5.2.3 SIGNAL STRENGTH.
 24.5.2.3.1 INBOUND. A MINIMUM INBOUND SIGNAL STRENGTH
 OF -95 DBM, OR OTHER SIGNAL STRENGTH AS REQUIRED BY THE
 AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED
 THROUGHOUT THE COVERAGE AREA.
 24.5.2.3.2 OUTBOUND. A MINIMUM OUTBOUND SIGNAL STRENGTH
 OF -95 DBM AT THE DONOR SITE, OR OTHER SIGNAL STRENGTH
 AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION, SHALL
 BE PROVIDED FROM THE COVERAGE AREA.
  
 THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL
 STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST
 PALM BEACH FIRE RESCUE. TESTING SHALL BE BY AN
 ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES
 NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE
 PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A
 BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH
 A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP.
  
  
 YOU SHALL MAKE CONTACT AND COORDINATE WITH MARK FILLA,
 PALM BEACH COUNTY, PUBLIC SAFETY RADIO SYSTEMS MANAGER,
 FOR ALL RADIO SIGNAL DETAILS, OUTBOUND SIGNAL STRENGTH
 AND ANTENNA DIRECTION, AS OUR RADIOS OPERATE ON THAT
 SYSTEM.
 [email protected] 561-233-0837
  
  
 ALL BDA WORK SHALL BE INSTALLED UNDER SEPARATE PERMIT
 AND SHOP DRAWINGS BY A QUALIFIED FCC LIC CONTRACTOR,
 LISTED EQUIPMENT AND SPEC SHEETS, WITH A COLOR HEAT
 SPECTUM FLOOR PLAN.
  
 PLEASE REVIEW AND PROVIDE AN APPLICABLE NOTE OF
 ACKNOWLEDGEMENT.
  
  
  
 5) SHEET G 1.2 - THERE ARE INDICATIONS OF A GAZEBO WITH
 A BBQ INSTALLED; HOWEVER, THERE IS NO INDICATION OF
 WHAT TYPE OF GRILL AND IF IT IS OF PERMANENT MOUNTING
 PER MANUFACTURES SPEC.
  
 PLEAE PROVIDE THE TYPE AND MANAFCATURES SPECS.
  
  
 5A) SHEET G 1.2 - THERE IS NO INDICATION OF A FIRE
 EXTINGUISHER AT THE GAZEBO AREA.
  
 PLEASE PROIVDE AT LEAT A 5LB ABC FIRE EXTINGUISHER IN
 THIS AREA THAT IS CERTIFIED AND TAG BY A THRID PARTY FE
 COMPANY.
  
  
  
 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 7) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2020-10-27 Cont ID  
Sent By shill Date 2020-10-27 Time 09:34 Rev Time 0.00
Received By shill Date 2020-10-20 Time 13:23 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-10-20 Cont ID  
Sent By lmarchan Date 2020-10-20 Time 06:38 Rev Time 0.00
Received By lmarchan Date 2020-09-18 Time 07:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-08-20 Cont ID  
Sent By shill Date 2020-08-20 Time 17:33 Rev Time 0.00
Received By shill Date 2020-07-15 Time 09:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-04-30 Cont ID  
Sent By shill Date 2020-04-30 Time 07:07 Rev Time 0.00
Received By shill Date 2020-03-24 Time 13:54 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 3 Status P Date 2020-11-19 Cont ID  
Sent By rmcphers Date 2020-11-19 Time 07:36 Rev Time 0.00
Received By lmarchan Date 2020-08-04 Time 06:59 Sent To  
Notes
2020-10-27 11:07:01RECEIPT MU 2020-30332 - $137.895.20 - PAID
2020-09-18 07:00:0108/04/20 EMAILED IMPACT FEE OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status F Date 2020-08-13 Cont ID  
Sent By rmcphers Date 2020-08-13 Time 13:52 Rev Time 0.00
Received By rmcphers Date 2020-08-13 Time 13:52 Sent To  
Notes
2020-08-13 13:53:11PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  
2020-08-04 15:30:158/4/20 EMAILED IMPACT FEE OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2020-04-03 Cont ID  
Sent By rmcphers Date 2020-04-03 Time 09:15 Rev Time 0.00
Received By rmcphers Date 2020-04-03 Time 09:15 Sent To  
Notes
2020-04-03 09:15:36PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2020-09-28 Cont ID  
Sent By medwards Date 2020-09-28 Time 12:05 Rev Time 0.00
Received By medwards Date 2020-09-28 Time 12:04 Sent To  
Notes
2020-09-28 12:07:41APPROVED WITH PRIVISO:
 DRYER BOOSTER FANS MUST BE LISTED AND LABELED TO UL
 705.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2020-08-04 Cont ID  
Sent By medwards Date 2020-08-04 Time 12:13 Rev Time 0.00
Received By medwards Date 2020-08-04 Time 10:15 Sent To  
Notes
2020-08-04 12:14:072ND REVIEW FBC-2017 MECHANICAL
 PERMIT-20030563
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET M-6.2 (NOTE-2) INDICATES THE USE OF A DRYER
 BOOSTER FAN, PLEASE PROVIDE THE SPECS FOR THIS DEVICE
 ALONG WITH THE UL APPROVAL. FBC FS 107.2.1
  
 2) SHEET M-5.3 INDICATES A MFCU-1A FOR THE PET WASHING
 ROOM AND A MFCU-1B FOR THE BICYCLE STORAGE ROOM. SHEET
 M-7.1 DOES NOT HAVE THESE UNITS LISTED IN THE EQUIPMENT
 SCHEDULE. PLEASE BE CONSISTENT ON BOTH SHEETS. FBC FS
 107.2.1
  
 3) SHEET M-5.3 AND SHEET M-7.1 DO NOT SHOW OUTSIDE AIR
 PROVIDED FOR THE OCCUPIABLE PET WASH ROOM OR THE
 BICYCLE STORAGE ROOM, PLEASE SHOW VENTILATION
 CALCULATIONS FOR THESE AREAS ALONG WITH HOW OUTSIDE AIR
 WILL BE BROUGHT INTO THESE AREAS. FBC M 401.2
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-04-03 Cont ID  
Sent By medwards Date 2020-04-03 Time 15:04 Rev Time 0.00
Received By medwards Date 2020-03-31 Time 16:06 Sent To  
Notes
2020-04-03 15:05:531ST REVIEW FBC-2017 MECHANICAL
 PERMIT- 20030563
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
 1) PLEASE SHOW HOW YOU ARE MEETING CHAPTER 4 OF THE FBC
 M, ARE YOU USING NATURAL VENTILATION OR MECHANICAL?
 2) PLEASE PROVIDE VENTILATION CALCULATIONS TO SHOW YOU
 ARE BRINGING THE MINIMUM REQUIRED OA INTO EACH AREA OF
 THE APARTMENTS. FBC M 403.3.2
 3) PLEASE PROVIDE INFORMATION FOR EACH AHU/CU.
 INCLUDING MAX. AIR SUPPLIED, RETURN AIR VOLUME AND OA
 NEEDED. . FBC WPB 107.2.1
 4) PLEASE SHOW HOW YOU ARE PROVIDING EXHAUST FROM THE
 KITCHENS. FBC M TABLE 430.3.1.1
 5) SHEET M.4.1- PLEASE SHOW ROOF ACCESS ON THIS SHEET
 OR GIVE A SHEET REFERENCE ON THIS SHEET SHOWING THE
 ROOF ACCESS. FBC M 306.5
 6) PLEASE PROVIDE A DRAWING SHOWING THE LOCATION OF THE
 DRYER. FBC WPB 107.2.1
 7) PLEASE PROVIDE DRYER DUCT LENGTHS FOR EACH UNIT. FBC
 M 504.8.4.1
 8) PLEASE SHOW DRYER DUCT MAKEUP AIR LOCATION AND SIZE
 OF DUCT OR TRANSFER GRILL. FBC M 504.6
 9) IF DRYER IS IN THE SAME CLOSET AS THE AHU SHOW HOW
 THIS DESIGN MEETS FBC M 602 FOR PLENUMS.
 10) PLEASE PROVIDE CFM?S FOR ALL TRANSFER GRILLS AND
 RETURNS. FBC M 601.5 NOTES (3)&(4).
 11) PLEASE PROVIDE A DETAILED DRAWING SHOWING THE MAKE
 UP OF THE RAG FROM MASTER BEDROOM TO LIVING. FBC WPB
 107.2.1
 12) WHEN YOU DOWNLOADED THE SHEETS INTO PROJECTDOX YOU
 MISLABELED SHEET M5.2. THIS SHEET SHOULD REFERENCE UNIT
 1B AND 2B. IN PROJECTDOX THE PAGE IS SHOWING 1B & 2A.
 13) SHEET M-5.1 UNIT 1A PLEASE IDENTIFY THE AHU UNIT.
 FBC WPB 107.2.1
 14) SHEET M-5.1: UNIT 1A THE EXHAUST LOUVER THAT IS
 LABELED DRYER VENT LOUVER IS GOING TO EF-1 IN THE
 BATHROOM OFF FROM THE KITCHEN. PLEASE CORRECT THIS. FBC
 WPB 107.2.1
 15) SHEET M-5.1: UNIT 1A THE OTHER EXHAUST DUCT IS
 GOING TO A LOCATION IN THE CLOSET WITH THE DOUBLE DOORS
 AND APPEARS TO STOP. PLEASE PROVIDE A DETAIL DRAWING OF
 WHERE THIS DUCT TERMINATES. FBC WPB 107.2.1
 16) SHEET M-5.1: UNIT 1A PLEASE PROVIDE CFM?S FOR THE
 RETURN. FBC WPB 107.2.1
 17) SHEET M-5.1: PLEASE SHOW THAT ALL EXHAUST
 TERMINATIONS FOR THIS PROJECT MEET FBC M 501.3.1.
 18) SHEET M-5.1: PLEASE SHOW THAT ALL O.A. INTAKES FOR
 THIS PROJECT MEET FBC M 401.4.
 19) SHEET M-5.1: UNIT 2A IT APPEARS THAT THE DUCT
 LABELED ?DRYER VENT? IS GOING INTO THE AHU/WATER HEATER
 ROOM. DETAILS ON M6.1 DOES NOT SHOW A DRYER IN THIS
 LOCATION.
 20) SHEET M-7.1: THERE ARE SEVERAL LOCATIONS ON THE
 SHEET THAT ARE NOT INCLUDED IN THIS PROJECT. PLEASE
 REMOVE ROOMS AND EQUIPMENT FROM THIS SHEET THAT ARE NOT
 RELATED TO THIS PERMITTED PROJECT.
 21) SHEET M-5.2 SHOWS A UNIT 1B ON THE FIRST FLOOR.
 SHEET M-7.1 DOES NOT MENTION A 1B1 IN THE LOCATIONS
 COLUMN. PLEASE CORRECT THIS. . FBC WPB 107.2.1
 22) PLEASE VERIFY ACTUAL AIR FLOW FROM SHEET M-7.1
 MATCHES THE INDIVIDUAL UNIT SHEETS. . FBC WPB 107.2.
 23) SHEET M-6.2 PLEASE SHOW THAT THE MINI-SPLIT UNITS
 MEET SECTION 307.2.4.1 OF FBC M.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 4 Status P Date 2020-10-21 Cont ID  
Sent By tklarge Date 2020-10-21 Time 04:48 Rev Time 0.00
Received By tklarge Date 2020-10-20 Time 14:11 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2020-10-08 Cont ID  
Sent By lacrespo Date 2020-10-08 Time 10:04 Rev Time 0.00
Received By tklarge Date 2020-10-06 Time 05:11 Sent To  
Notes
2020-10-07 06:47:331) SUBMIT FIRE STOPPING DETAILS FOR NON-METALLIC PIPE
 THROUGH FIRE RATE FLOORS.A DETAIL HAS BEN SUBMITTED FOR
 WALLS BUT NOT FOR FLOORS AS PREIOUSLY REQUESTED.WPB
 AMEND. TO FBC SEC. 107.3.5.1.1 (4).
 2) SHT.P7.4 - UNIT 2A - #1208 - RISER 2SA2 IS LABELED
 AS 2S2A ON SHTS.P2.1 & P5.2. CLARIFY. 2ND REQUEST.
 3) SHT. P7.4 - UNIT 2A - #1208 THE WATER CLOSET AND THE
 TUB IN THE HALL BATH ARE NOT VENTED. FBC-PLUMBING
 SEC.901.2, 901.2.1,SINCE THESE FIXTURES ARE ON A
 SEPARATE FIXTURE BRANCH, A VENT IS RQUIRED.
 FBC-PLUMBING SEC.901.2, 901.2.1,
 4) SHT. P7.4 - UNIT 1A - #1207 - THE SHOWER AND WATER
 CLOSET IN THE MASTER BATHROOM ARE NOT VENTED.SINCE
 THESE FIXTURES ARE ON A SEPARATE FIXTURE BRANCH, A VENT
 IS REQUIRED. FBC-PLUMBING SEC.901.2, 901.2.1,
 5) SHT. P7.4 - UNIT 1A - #1207 - THE WATER CLOSET AND
 THE TUB ARE NOT VENTED. SINCE THESE FIXTURES ARE ON A
 SEPARATE FIXTURE BRANCH, A VENT IS REQUIRED.
 FBC-PLUMBING SEC.901.2, 901.2.1,
 6) SHT. P7.4 - UNIT 1A - #1206 - THE WATER CLOSET AND
 THE TUB ARE NOT VENTED. SINCE THESE FIXTURES ARE ON A
 SEPARATE FIXTURE BRANCH, A VENT IS REQUIRED.
 FBC-PLUMBING SEC.901.2, 901.2.1,
 7) SHT. P7.4 - UNIT 2B - #1205 - THE SHOWER AND WATER
 CLOSET IN THE MASTER BATHROOM ARE NOT VENTED.SINCE
 THESE FIXTURES ARE ON A SEPARATE FIXTURE BRANCH, A VENT
 IS REQUIRED. FBC-PLUMBING SEC.901.2, 901.2.1,
 8) SHT. P7.4 - UNIT 2B - #1205 - THE WATER CLOSET AND
 THE TUB IN THE HALL BATH ARE NOT VENTED. FBC-PLUMBING
 SEC.901.2, 901.2.1,SINCE THESE FIXTURES ARE ON A
 SEPARATE FIXTURE BRANCH, A VENT IS RQUIRED.
 FBC-PLUMBING SEC.901.2, 901.2.1,
 9) SHT. P7..4 - UNIT 2B - #1204 - THE WATER CLOSET AND
 THE TUB IN THE HALL BATH ARE NOT VENTED. FBC-PLUMBING
 SEC.901.2, 901.2.1,SINCE THESE FIXTURES ARE ON A
 SEPARATE FIXTURE BRANCH, A VENT IS RQUIRED.
 FBC-PLUMBING SEC.901.2, 901.2.1,
 10) SHT. P7.5 - UNIT2B - #1204 - THE SHOWER AND WATER
 CLOSET IN THE MASTER BATHROOM ARE NOT VENTED.SINCE
 THESE FIXTURES ARE ON A SEPARATE FIXTURE BRANCH, A VENT
 IS REQUIRED. FBC-PLUMBING SEC.901.2, 901.2.1,
 11) SHT. P7.5 - UNIT 1A - #1203 - THE WATER CLOSET AND
 THE TUB ARE NOT VENTED. FBC-PLUMBING SEC.901.2,
 901.2.1,SINCE THESE FIXTURES ARE ON A SEPARATE FIXTURE
 BRANCH, A VENT IS RQUIRED. FBC-PLUMBING SEC.901.2,
 901.2.1,
 12) SHT. P7.5 - UNIT 1A - #1202 - THE WATER CLOSET AND
 THE TUB ARE NOT VENTED. FBC-PLUMBING SEC.901.2,
 901.2.1,SINCE THESE FIXTURES ARE ON A SEPARATE FIXTURE
 BRANCH, A VENT IS RQUIRED. FBC-PLUMBING SEC.901.2,
 901.2.1,
 13) SHT. P7.5 - UNIT 2A - #1201 - THE TUB AND WATER
 CLOSET IN THE HALL BATHROOM ARE NOT VENTED.SINCE THESE
 FIXTURES ARE ON A SEPARATE FIXTURE BRANCH, A VENT IS
 REQUIRED. FBC-PLUMBING SEC.901.2, 901.2.1.
 14) SHT. P7.5 - UNIT 2A - #1201 - THE SHOWER AND WATER
 CLOSET IN THE MASTER BATH ARE NOT VENTED. THE LAVATORY
 FIXTURE BRANCH SHALL BE LOCATED BETWEEN THE WATER
 CLOSET AND THE SHOWER.FBC-PLUMBING SEC.901.2, 912.1.
 15) SHT. P7.6 - RISER S1A - THE TUB AND WATER CLOSET
 ARE NOT VENTED. THE LAVATORY DRAIN AND VENT SHALL BE
 LOCATED BETWEEN THE WATER CLOSET AND THE SHOWER.
 FBC-PLUMBING SEC.901.2, 912.1.
 16) SHT. P7.7 - UNIT 2A - RISER S2A - THE TUB AND WATER
 CLOSET ARE NOT VENTED.THE LAVATORY DRAIN AND VENT SHALL
 BE LOCATED BETWEEN THE WATER CLOSET AND THE TUB.
 FBC-PLUMBING SEC.901.2, 912.1.
 17) SHT. P7.7 - UNIT 2A - RISER 2S2A - THE SHOWER AND
 WATER CLOSET ARE NOT VENTED. THE LAVATORY DRAIN AND
 VENT SHALL BE LOCATED BETWEEN THE WATER CLOSET AND THE
 SHOWER. FBC-PLUMBING SEC.901.2, 912.1.
 18) SHT. P7.8 - UNIT 2B - RISER S2B - AS DRAWN, THE
 WATER CLOSET AND TUB ARE NOT VENTED.THE LAVATORY DRAIN
 AND VENT SHALL BE LOCATED BETWEEN THE WATER CLOSET AND
 THE TUB OR THE WATER CLOSET AND TUB SHALL BE INSTALLED
 ON A HORIZONTAL WET VENT. FBC-PLUMBING SEC.901.2,
 912.1.
 19) SHT. P7.8 - UNIT 2B - RISER S2B - THE WATER CLOSET
 AND THE SHOWER ARE NOT VENTED. SINCE THESE FIXTURES ARE
 ON A SEPARATE FIXTURE BRANCH, A VENT IS REQUIRED.
 FBC-PLUMBING SEC.901.2, 901.2.1,
 20) SHT. P7.8 - UNIT 1B - RISER S1B - THE WATER CLOSET
 AND THE SHOWER ARE NOT VENTED. SINCE THESE FIXTURES ARE
 ON A SEPARATE FIXTURE BRANCH, A VENT IS REQUIRED.
 FBC-PLUMBING SEC.901.2, 901.2.1,
 21) SHT. P7.2 - DETAIL #1 - THE WATER CLOSET AND SHOWER
 ARE NOT VENTED. SINCE THESE FIXTURES ARE ON A SEPARATE
 FIXTURE BRANCH, A VENT IS REQUIRED. FBC-PLUMBING
 SEC.901.2, 901.2.1,
 22) SHT. P7.2 - DETAIL #3 - THE DISHWASHER SHALL
 DISCHARGE INDIRECTLY IN ACCORDANCE WITH FBC-PLUMBING
 SEC.802.1.6.
  
 REVIEW IS INCOMPLETE

Review Stop P PLUMBING
Rev No 2 Status F Date 2020-08-10 Cont ID  
Sent By tklarge Date 2020-08-10 Time 12:43 Rev Time 0.00
Received By tklarge Date 2020-08-05 Time 10:18 Sent To  
Notes
2020-08-10 05:43:031) SHT.A-0.1 - DETAIL #3 - UNIT 2A - THIS LAYOUT DOES
 NOT COMPLY WITH THE FAIR HOUSING ACT DESIGN MANUAL,
 CHAPTER 7, PAGE 7.56 & 7.57. THE ONLY FIXTURE PERMITTED
 TO BE ADJACENT TO THE SHOWER IS A LAVATORY MOUNTED ON
 THE CONTROL WALL BESIDE THE SHOWER AND MAY OVERLAP THE
 CLEAR FLOOR SPACE BY A MAXIMUM OF 6 INCHES. THE PORTION
 OF THE LAVATORY THAT OVERLAPS THE CLEAR FLOOR SPACE
 MUST HAVE KNEE SPACE BELOW OR A REMOVABLE VANITY
 CABINET. A 30 INCH WIDE BY 48 INCH DEEP CLEAR FLOOR
 SPACE MUST BE PROVIDED PARALLEL TO THE SHOWER AND FLUSH
 WITH THE CONTROL WALL. 2ND REQUEST.
 2) THE PRESSURE CYLINDER FOR THE ELEVATOR SHALL BE
 PROTECTED IN ACCORDANCE WITH 2017 FBC-BUILDING
 SEC.3011. I COULD NOT FIND THIS DETAIL ON THE PLANS.
 PLEASE SUBMIT THE SPECIFIC PAGE WHERE THIS DETAIL CAN
 BE FOUND. 2ND REQUEST.
 3) FIRESTOPPING DETAILS HAVE BEEN SUBMITTED FOR METAL
 PIPE THROUGH RATED WALLS AND FLOORS. IF PVC PIPE IS TO
 BE INSTALLED, SUBMIT FIRESTOPPING ASSEMBLY DETAILS FOR
 THE PVC PIPE THROUGH RATED FLOORS AND WALLS.WPB AMEND.
 TO FBC SEC. 107.2.1, 107.3.5.1.1.
 4) SHT. P7.2 - DETAIL #1 - A MAXIMUM OF 10 FIXTURE
 UNITS SHALL BE VENTED BY A 1 1/2 INCH VENT PER
 FBC-PLUMBING TABLE 906.1.AS DRAWN, 15 FIXTURE UNITS ARE
 BEING VENTED BY THE 1 1/2 INCH VENT. REFER TO
 FBC-PLUMBING TABLE 709.1 FOR FIXTURE UNIT VALUE FOR A
 BATHROOM GROUP.
 5) SHT. P7.3 - THE HOSE BIBBS SHALL BE EQUIPPED WITH
 SEPARATE SHUTOFF VALVES PER FBC-PLUMBING SEC.606.2 (2).
 6) SHT. P7.3 - PROVIDE RISER TAGS FOR THE 1 1/2 INCH
 LINE UP TO THE 2ND & 3RD FLOOR UNITS AND FOR THE 4 INCH
 SANITARY FROM THE 2ND & 3RD FLOOR UNITS. WPB AMEND. TO
 FBC SEC. 107.3.5.1.3.
 7) SHT. P7.4 - UNIT 2A - #1208 - RISER 2SA2 APPEARS TO
 BE LABELED AS 2S2A ON SHT. P5.2.. CLARIFY.
 8) SHT. P7.4 - UNIT 2A - #1208 - RISER 2V2A APPEARS TO
 BE LABELED AS 2V2D ON SHT. P2.1. CLARIFY.
 9) SHT.P7.4 - UNIT 1A - #'S 1206 & 1207 - FIRST FLOOR
 SANITARY - THE KITCHEN SINK IS DISCHARGING INTO THE
 HORIZONTAL WET VENT. ONLY FIXTURES WITHIN THE BATHROOM
 GROUP SHALL CONNECT TO THE WET VENTED HORIZONTAL BRANCH
 DRAIN. THE KITCHEN SINK SHALL CONNECT TO THE 4 INCH
 HORIZONTAL DRAIN DOWNSTREAM OF THE SHOWER.FBC-PLUMBING
 SEC.912.1.
 10) SHT. P7.4 - UNIT 2B - #1205 - FIRST FLOOR SANITARY
 - THE SHOWER AND WATER CLOSET ARE NOT VENTED.THE
 LAVATORY DRAIN & VENT SHALL BE LOCATED BETWEEN THE
 WATER CLOSET AND THE SHOWER. FBC PLUMBING SEC. 901.2,
 11) SHT. P7.4 - THE 2 INCH SANITARY LINE FOR THE PET
 WASH GOES NOWHERE. SHOW THE CONTINUATION AND
 TERMINATION POINT OF THIS LINE AND IDENTIFY IT WITH A
 RISER TAG IF APPLICABLE. WPB AMEND. TO FBC SEC.
 107.2.1.
 12) SHT. P7.4 - VENT RISER V1B SHOWN AT THE PET WASH IS
 NOT SHOWN ON SHT. P2.1 - CLARIFY.
 13) SHT. P7.4 - UNIT 2B - #1204 - MASTER BATH - VENT
 VTB APPEARS TO BE LABELED AS 2V2B ON SHT. P2.1.
 CLARIFY.
 14) SHT. P7.4 - UNIT 2B - #1205 - HALL BATH - RISER
 2V2B APPEARS TO BE LABELED AS V2B ON SHT. P2.1.THIS
 ALSO OCCURS ON THE 2ND AND 3RD FLOOR PLAN ON P2.1.
 CLARIFY.
 15) SHT. P7.5 - UNIT 2B -#1204 - HALL BATH - RISER 2V2B
 APPEARS TO BE LABELED AS V2B ON SHT. P2.1. THIS ALSO
 OCCURS ON THE 2ND AND 3RD FLOOR PLAN ON P2.1. CLARIFY.
 16) SHT. P7.5 - UNIT 2B - #1204 - RISER S2B IS NOT
 SHOWN ON SHT. P2.1 - CLARIFY.
 17) SHT. P7.5 - UNIT 2B -#1204 - HALL BATH - FIRST
 FLOOR SANITARY - THE SHOWER AND WATER CLOSET ARE NOT
 VENTED.THE LAVATORY DRAIN & VENT SHALL BE LOCATED
 BETWEEN THE WATER CLOSET AND THE SHOWER. FBC PLUMBING
 SEC. 901.2,
 18) SHT. P7.5 - UNIT 2A -#1201 - MASTER BATH - RISER
 LABELED AS V2A APPEARS TO BE LABELED AS 2V2D ON SHT.
 P2.1. CLARIFY.
 19) SHT. P7.5 - UNIT 2A - #1201 -MASTER BATH - RISER
 LABELED AS S2A APPEARS TO BE LABELED AS 2S2A ON SHT.
 P2.1. THIS ALSO OCCURS ON THE 2ND & 3RD FLOORS. ALSO,
 THE VENT RISER FOR MASTER BATH LAVATORY IS NOT SHOWN ON
 THE PLAN VIEW FOR THE 2ND AND 3RD FLOORS. CLARIFY
 20) SHT. P7.5 - UNIT 2A - #1201 - HALL BATH - THE
 SHOWER AND WATER CLOSET ARE NOT VENTED.THE LAVATORY
 DRAIN & VENT SHALL BE LOCATED BETWEEN THE WATER CLOSET
 AND THE SHOWER. FBC PLUMBING SEC. 901.2,
 21) SHT. P7.5 - UNIT 2A - #1201 - HALL BATH - RISER
 LABELED AS 2V2A APPEARS TO BE LABELED AS V2A ON SHT
 P2.1. THIS ALSO OCCURS ON THE 2ND AND 3RD FLOORS.
 CLARIFY.
 22) SHT. P7.5 - UNIT 2A - #1201 - RISER LABELED AS 2S2A
 APPEARS TO BE LABELED AS S2A ON SHT. P2.1. THIS ALSO
 OCCURS IN THE SAME UNIT ON THE 2ND & 3RD FLOORS.
 CLARIFY.
 23) SHT. P7.6 - RISER S1A - THE SHOWER AND WATER CLOSET
 ARE NOT VENTED.THE LAVATORY DRAIN & VENT SHALL BE
 LOCATED BETWEEN THE WATER CLOSET AND THE SHOWER. FBC
 PLUMBING SEC. 901.2,
 24) SHT. P7.7 - UNIT 2A - RISER S2A - THE SHOWER AND
 WATER CLOSET ARE NOT VENTED.THE LAVATORY DRAIN & VENT
 SHALL BE LOCATED BETWEEN THE WATER CLOSET AND THE
 SHOWER. FBC PLUMBING SEC. 901.2.
 25) SHT. P7.7 - UNIT 2A - RISER 2SA2 FOR THE MASTER
 BATH APPEARS TO BE LABELED AS 2S2A ON SHT. P5.2 -
 CLARIFY.
 26) CHECK ALL THE RISER TAGS ON THE PLAN VIEW SHEETS
 AGAINST THE SANITARY RISER DIAGRAMS TO ENSURE THE RISER
 TAGS CORRELATE THROUGH EACH FLOOR. REFER TO SHEETS
 P2.1, P7.4, P7.5, P7.6 & P7.7. WPB AMEND. TO FBC SEC.
 107.2.1.
 27) SHT. P7.8 - UNIT 2B - RISER S2B - 2ND & 3RD FLOOR -
 THE SHOWER AND WATER CLOSET IN THE HALL BATH ARE NOT
 VENTED.THE LAVATORY DRAIN & VENT SHALL BE LOCATED
 BETWEEN THE WATER CLOSET AND THE SHOWER. FBC PLUMBING
 SEC. 901.2,
 28) SHT. P7.8 - UNIT 2B - RISER S2B - THE KITCHEN SINK
 IS DISCHARGING INTO THE HORIZONTAL WET VENT. ONLY
 FIXTURES WITHIN THE BATHROOM GROUP SHALL CONNECT TO THE
 WET VENTED HORIZONTAL BRANCH DRAIN. THE KITCHEN SINK
 SHALL CONNECT TO THE 4 INCH HORIZONTAL DRAIN DOWNSTREAM
 OF THE SHOWER.FBC-PLUMBING SEC.912.1.
 29) SHT.P7.8 - DETAIL #1 - RISERS 2V2B & V2B - A
 MAXIMUM OF 10 FIXTURE UNITS SHALL BE VENTED BY A 1 1/2
 INCH VENT PER FBC-PLUMBING TABLE 906.1.AS DRAWN, 15
 FIXTURE UNITS ARE BEING VENTED BY THE 1 1/2 INCH VENT.
 REFER TO FBC-PLUMBING TABLE 709.1 FOR FIXTURE UNIT
 VALUE FOR A BATHROOM GROUP.
 30) PLEASE IDENTIFY THE TUBS AS TUBS ON THE RISER
 DIAGRAMS AND NOT AS SHOWERS.
 31) SUBMIT A CONDENSATE RISER FOR REVIEW. SIZING SHALL
 COMPLY WITH FBC-PLUMBING SEC.314.
 32) THE SANITARY RISERS SHOW THE DIRECTION OF FLOW AT
 SEVERAL AREAS OF THE RISERS. REVISE THE RISERS TO
 REFLECT CORRECT DIRECTION OF FLOW.
 33) SUBMIT A WATER HEATER PAN DRAIN RISER FOR
 REVIEW.WPB AMEND. TO FBC SEC. 107.2.1.
 34) IF A SUMP PUMP WILL BE INSTALLED IN THE ELEVATOR
 SUMP, THE INSTALLATION SHALL COMPLY WITH FBC-PLUMBING
 SEC.1003.4.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-04-05 Cont ID  
Sent By tklarge Date 2020-04-05 Time 07:35 Rev Time 0.00
Received By tklarge Date 2020-04-04 Time 02:01 Sent To  
Notes
2020-04-04 11:47:32PLUMBING:
 1) SHT. A-0.1 - DETAILS #1, #2 & #3 - SHOWS THE
 CENTERLINE OF THE WATER CLOSET FROM THE EDGE OF THE TUB
 AND/OR SHOWER AS ONE- FOOT SEVEN INCHES, ONE- FOOT NINE
 INCHES AND ONE- FOOT EIGHT INCHES RESPECTIVELY. THE
 DISTANCE SHALL BE 0NE -FOOT SIX INCHES ( 18" ) ABSOLUTE
 AS REQUIRED BY THE FAIR HOUSING ACT DESIGN MANUAL,
 CHAPTER 6, PG. 6.7. THESE DIMENSIONS MUST ALSO BE
 CHANGED ON THE ELEVATION DRAWINGS.
 2) SHT. A-0.1 - DETAIL #7 - SHOW THE WIDTH OF THE
 PROPOSED REINFORCEMENT FOR THE TUB. THE LENGTH IS SHOWN
 AS 48 INCHES.WPB AMEND. TO FBC SEC. 107.2.1.
 3) SHT. A-0.1 - THE UNITS THAT HAVE A SHOWER DO NOT
 COMPLY WITH THE REQUIREMNT FOR THE CLEAR FLOOR SPACE
 THAT IS REQUIRED BY THE FHA DESIGN MANUAL CHAPTER 7,
 PG.7.56. AS PROPOSED, THIS LAYOUT DOES NOT COMPLY WITH
 HAVING THE WATER CLOSET NEXT TO THE SHOWER.A 30 INCH
 WIDE BY 48 INCH DEEP CLEAR FLOOR SPACE MUST BE PROVIDED
 AT SHOWER STALLS, PARALLEL TO THE FIXTURE AND FLUSH
 WITH THE CONTROL WALL. FHA DESIGN MANUAL PART TWO,
 CHAPTER 7, PART B, PG. 7.56..
 4) SHT. A-0.1 - DETAIL #3 NOTES "SEE DETAIL #6 FOR GRAB
 BAR REINFORCEMENT AT SHOWER." DETAIL #6 SHOWS
 REINFORCEMENT AT TOILETS.REVISE THE NOTE TO REFER TO
 DETAIL #8.
 5) SHT. A-0.1 - DETAIL #3 NOTES " SEE DETAIL #8 FOR
 REINFORCEMENT AT TOILET." DETAIL #8 SHOWS REINFORCEMENT
 AT SHOWERS. REVISE THE NOTE TO REFER TO DETAIL #6.
 6) SHT. A-0.1 - DETAIL #8 - THE SHOWER REINFORCEMENT
 THAT IS SHOWN FOR A FUTURE SHOWER SEAT DOES NOT COMPLY
 WITH THE FAIR HOUSING ACT DESIGN MANUAL. THE
 REINFORCING MUST START AT THE FLOOR AND RISE TO A
 MINIMUM HEIGHT OF 24 INCHES, NOT START 6 INCHES ABOVE
 THE FLOOR PER PART TWO, CHAPTER 6, PG. 6.13 OF THE FAIR
 HOUSING ACT DESIGN MANUA. REVISE THE DETAIL.
 7) THE PLANS REFER TO A GYM. I DID NOT SEE A GYM
 LOCATED ON THE PLANS. CLARIFY. WPB AMEND. TO FBC SEC.
 107.2.1.
 8) SHT. A-1.3 - DETAIL #5 - CLARIFY THE CLEARANCES FOR
 THE WATER CLOSET FROM THE EDGE OF THE VANITY AND THE
 TUB/SHOWER. COMPLY WITH FHA DESIGN MANUAL.
 9) SHT. A-1.4 - INTERIOR ELEVATION #6 - THE CENTERLINE
 OF THE WATER CLOSET SHALL BE 18 INCHES PER THE FHA
 DESIGN MANUAL.. THE PLANS SHOWS ONE FOOT NINE INCHES
 (21 INCHES).
 10) SHT.A-1.5 - INTERIOR ELEVATIONS #5 & #9 - THE
 CENTERLINE TO THE WATER CLOSET SHALL BE 18 INCHES TO
 THE CENTERLINE, NOT 20 INCHES AS SHOWN.FHA DESIGN
 MANUAL, PART TWO, CHAPTER 7, PART B PG. 7.43.
 11) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE PET
 WASH UNIT. WPB AMEND. TO FBC SEC. 107.2.1.
 12) SUBMIT ADDITIONAL INFORMATION ON THE RAINWATER
 CALCULATIONS. SHOW HOW YOU ARRIVED AT THE FINAL
 RESULTS. THE PARAPET WALL MUST BE INCLUDED IN THE
 RAINWATER CALCULATIONS PER THE 2017 FBC-PLUMBING
 SECS.1106.4, 1106.5.SEE SHT. A-3.
 13) IS THE ELEVATOR A TRACTION TYPE OR HYDRAULIC TYPE?
 IF OF A HYDRAULIC TYPE , THE PRESSURE CYLINDER SHALL BE
 PROTECTED IN ACCORDANCE WITH 2017 FBC -BUILDING
 SEC.3011.
 14) THE PLANS SHOW A BBQ GRILL. SUBMIT DETAILS ON THE
 GRILL AND ANY VENTILATION REQUIREMENTS. IS THIS A GAS
 GRILL OR A CHARCOAL BURNING GRILL. CLARIFY ON THE
 PLANS.
 15) SUBMIT GAS RISER DIAGRAM AND MANUFACTURER'S
 SPECIFICATIONS FOR THE GRILL IF IT UTILIZES GAS.WPB
 AMEND. TO FBC SEC. 107.3.5.1.6.
 16) SUBMIT FIRESTOPPING DETAILS FOR PIPE PENETRATIONS
 THROUGH FRAMED RATED WALLS. THE SUBMITTED DETAIL IS FOR
 PENETRATIONS THROUGH A CONCRETE FLOOR OR A BOLCK WALL.
 WPB AMEND. TO FBC SEC. 107.3.5.1.1.
 17) SHT. P-1.0 - IDENTIFY ALL RISERS ON THE PLUMBING
 SHEETS.. PROVIDE RISER TAG NUMBERS FOR EACH RISER (
 WATER & SANITARY).WPB AMEND. TO FBC SEC.107.3.5.1.3.
 18) SUBMIT A COMPLETE UNDERGROUND SANITARY RISER
 DIAGRAM SHOWING ALL SANITARY RISERS AND PROVIDE RISER
 TAG NUMBERS SO THE RISERS WILL CORRELATE WITH RISERS
 THAR ARE TO BE SHOWN ON THE FLOOR PLAN. WPB AMEND. TO
 FBC SEC. 107.3.5.1.3.
 19) SHT. P-2.1 - THE FIRST FLOOR PLAN SHOWS TRENCH
 DRAINS BY THE ELEVATORS.AND THE PLAN REFERS TO THE
 CIVIL DRAWINGS. THESE DRAINS ARE NOT SHOWN ON THE CIVIL
 DRAWINGS. CLEARLY SHOW THE LOCATION OF THESE DRAINS ON
 THE PLANS AND SPECIFY THE SPECIFIC SHEET WHERE THEY ARE
 LOCATED. WPB AMEND. TO FBC SEC. 107.1, 107.3.5.1.3.
 20) SHT. P-2.1 - THERE ARE NO PIPE SIZES ON THE PIPES
 AND THE RISERS NEED TO HAVE RISER TAGS AND IDENTIFIED
 AS TO THE USE. WPB AMEND. TO FBC SEC. 107.2.1.REFER TO
 THE SPECIFIC CIVIL DRAWING WHERE THE REQUIRED
 INFORMATION CAN BE FOUND.
 21) THE UNITS WITH THE HALL BATH HAVE THE HALL BATH
 MISSING FROM THE SANITARY AND WATER RISER. WPB AMEND.
 TO FBC SEC. 107.3.5.1.3.
 22) SHTS. P-5.1 & P-5.2 - KEYNOTE #2 IS NOT SHOWN ON
 THE PLANS. CLARIFY.
 23) SHT. P-7.1 - A FULL OPEN VALVE IS REQUIRED AT THE
 BASE OF THE WATER RISER PER 2017 FBC-PLUMBING SEC.606.1
 (4).
 24) SUBMIT A COMPLETE WATER RISER FOR THE 2 BATH UNIT.
 WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 25) SHT. P-7.2 - DETAIL #3 - THE KITCHEN SINKS ARE NOT
 VENTED. 2017 FBC-PLUMBING SECS.901.2,901.2.1.
 26) SHT. P-7.3 - DETAIL #1 - THE FLOOR DRAINS ARE NOT
 VENTED. 2017 FBC-PLUMBING SEC.901.2,901.2.1.
 27) A TRAP AND VENT IS REQUIRED ON THE PET WASH
 DRAIN.2017 FBC-PLUMBING SEC. 1002.1, SECS.901.2,901.2.1
 28) THE PLUMBING SHEETS NOTE" SEE PLANS FOR
 CONTINUATION" OF PLUMBING LINES. LIST THE SPECIFIC
 SHEET WHERE THESE CONTINUATION LINES CAN BE FOUND. WPB
 AMEND. TO FBC SEC. 107.3.5.1.3.
 29) A SEPARATE SHUTOFF VALE IS REQUIRED ON THE WATER
 SUPPLY TO THE PET RINSE AREA. 2017 FBC-PLUMBING
 SEC.606.2 (1) (3).
 30) SHT. P-7.3 - IDENTIFY THE LOCATION OF THE TWO FLOOR
 DRAINS. WPB AMEND. TO FBC SEC. 107.2.1.
 31) SHT. P-8.1 - PLUMBING FIXTURE CONNECTION SCHEDULE -
 NOTE #3 STATES " FIXTURES SHALL BE IN COMPLIANCE WITH
 MIAMI-DADE COUNTY WATER USE EFFICIENCY STANDARDS.
 CLARIFY.
 32) SHT. P-8.1 - PIPE MATERIAL SCHEDULE - NOTE #6
 REFERS TO THE 2007 FLORIDA PLUMING CODE. THE CODE THAT
 IS IN EFFECT IS THE 2017 EDITION. REVISE THE NOTE.
 33) SEPARATE PEMITS WILL BE REQUIRED FOR ALL BACKFLOW
 PREVENTION DEVICES.
 34) SUBMIT IRRIGATION PLANS IF A NEW IRRIGATION SYSTEM
 IS GOING TO BE INSTALLED. WPB AMEND. TO FBC SEC.
 107.2.1.
 35) SHT. P-1.0 - KEYED NOTE #3 REFERS TO THE CIVIL
 DRAWINGS FOR THE CONTINUATION OF THE DRAIN LINE FROM
 THE ROOF. THESE LINES ARE NOT SHOWN ON CIVIL DRAWING
 C-2.1. CLARIFY.
 36) THE WATER VALVES FOR THE STACKED WASHER SHALL BE
 PROVIDED WITH ACCESS IN ACCORDANCE WITH 2017
 FBC-PLUMBING SEC.606.3.
  
 FIRE PROTECTION:
 1) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR THE
 SPRINKLER HEADS TO BE INSTALLED IN THE LIGHT HAZARD AND
 ORDINARY HAZARD AREAS. NFPA 13R SEC. 8.1.7 (12).
 2) SHT. FP-1 REFERS TO FP-1 FOR THE POINT OF SERVICE.
 THE POINT OF SERVICE IS NOT SHOWN ON FP-1. CLARIFY.SHOW
 THE POINT OF SERVICE ON SHT. C-2.3 PER FL. STATUTE
 633.021.
 3) THERE IS NO SPRINKLER HEAD SHOWN IN THE ELEVATOR
 PIT. COMPLY WITH NFPA 13 SEC. 8.15.5.
 4) SUBMIT A KEYNOTE LEGEND FOR THE KEYNOTES ON SHT.
 FP-1, BUILDING A RISER DIAGRAM.
 5) SHT. FP-1 - BUILDING A RISER DIAGRAM SHOWS THE BASE
 OF THE RISER TAG AS BEING ON THE THIRD FLOOR. CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 3 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 2 Status P Date 2020-12-09 Cont ID  
Sent By rgathrig Date 2020-12-09 Time 09:39 Rev Time 0.00
Received By rgathrig Date 2020-12-09 Time 09:39 Sent To  
Notes
***NONE***

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 1 Status F Date 2020-11-23 Cont ID  
Sent By rgathrig Date 2020-11-23 Time 11:18 Rev Time 0.00
Received By rgathrig Date 2020-11-23 Time 11:18 Sent To  
Notes
2020-11-23 11:18:44PRIVATE PROVIDER REVIEW FOR INSPECTIONS IS FAILED
  
 NOTICE TO BUILDING OFFICIAL NAMES GFA INTERNATIONAL AS
 THE FIRM AND GEORGE DIXON AS THE PRIVATE PROVIDER.
 LICENSE NUMBERS FOR BUILDING CODE ADMINISTRATOR AND
 INSPECTOR WERE SUBMITTED FOR MR. DIXON. NO ADDITIONAL
 INFORMATION WAS SUBMITTED FOR ANY DULY AUTHORIZED
 REPRESENTATIVE. IS MR. DIXON GOING TO BE THE ONLY
 PERSON MAKING THE INSPECTIONS N THIS PROJECT?
  
 THE CERTIFICATE OF INSURANCE DOES NOT STATE THAT
 PROFESSIONAL LIABILITY INSURANCE COVERAGE IS IN PLACE
 FOR THE PRIVATE PROVIDER?S FIRM, THE PRIVATE PROVIDER,
 AND ANY DULY AUTHORIZED REPRESENTATIVE IN THE AMOUNTS
 REQUIRED. ( FOUND IN 553.791 (4) )
  
 RICHARD GATHRIGHT
 ASSISTANT BUILDING OFFICIAL
 561-805-6679
  

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2020-08-13 Cont ID  
Sent By rmcphers Date 2020-08-13 Time 13:50 Rev Time 0.00
Received By rmcphers Date 2020-08-13 Time 13:50 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2020-04-03 Cont ID  
Sent By rmcphers Date 2020-04-03 Time 09:15 Rev Time 0.00
Received By rmcphers Date 2020-04-03 Time 09:15 Sent To  
Notes
2020-04-03 09:16:13SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2020-10-21 Cont ID  
Sent By rmcphers Date 2020-10-21 Time 07:59 Rev Time 0.00
Received By rmcphers Date 2020-10-21 Time 07:59 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-09-28 Cont ID  
Sent By medwards Date 2020-09-28 Time 13:03 Rev Time 0.00
Received By medwards Date 2020-09-28 Time 12:11 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-08-04 Cont ID  
Sent By medwards Date 2020-08-04 Time 13:35 Rev Time 0.00
Received By medwards Date 2020-08-04 Time 12:15 Sent To  
Notes
2020-08-10 12:46:16PLUMBING SHEETS APPEAR TO BE OK. T.LARGE 8/10/2020.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-04-03 Cont ID  
Sent By rmcphers Date 2020-04-03 Time 09:16 Rev Time 0.00
Received By rmcphers Date 2020-04-03 Time 09:16 Sent To  
Notes
2020-04-03 09:17:10SURVEY NEEDS TO BE ELECTRONICALLY SIGNED AND SEALED

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status N Date 2020-04-10 Cont ID  
Sent By shill Date 2020-04-10 Time 10:55 Rev Time 0.00
Received By shill Date 2020-04-10 Time 10:55 Sent To  
Notes
2020-04-10 10:56:05NOT REQUIRED PER KEN CONRAD
  

Review Stop Z ZONING
Rev No 4 Status P Date 2020-10-27 Cont ID  
Sent By ajones Date 2020-10-27 Time 09:29 Rev Time 0.00
Received By ajones Date 2020-10-27 Time 09:29 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date   Cont ID  
Sent By   Date 2020-10-14 Time   Rev Time 0.00
Received By ajones Date 2020-10-14 Time 10:51 Sent To  
Notes
2020-10-14 10:51:1910/14/20- FAILED. ELEVATIONS DO NOT MATCH THE PLANS
 APPROVED IN THE MINOR AMENDMENT.
  
 ANGELLA VANN
 [email protected]
 561-822-1441

Review Stop Z ZONING
Rev No 2 Status F Date 2020-08-19 Cont ID  
Sent By ajones Date 2020-08-19 Time 13:19 Rev Time 0.00
Received By ajones Date 2020-08-19 Time 13:19 Sent To  
Notes
2020-08-19 13:20:138/19/20- FAILED- WAITING ON MINOR AMENDMENT APPROVAL
  
 ANGELLA VANN
 [email protected]
 561-822-1441

Review Stop Z ZONING
Rev No 1 Status F Date 2020-04-28 Cont ID  
Sent By avann Date 2020-04-28 Time 11:47 Rev Time 0.00
Received By ajones Date 2020-04-28 Time 11:47 Sent To  
Notes
2020-04-28 11:50:374/28/2020- FAILED
 1. THE SITE PLAN DOES NOT MATCH THE APPROVED SITE PLAN
 ON FILE WITH THE PLANNING DIVISION.
 2. THERE SEEMS TO BE CHANGES IN THE ELEVATIONS
 (WINDOWS) THAN WHAT IS ON FILE WITH THE PLANNING
 DIVISION
  
 ANGELLA VANN, AICP
 [email protected]
 561-822-1441


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved