| 2020-03-13 16:58:42 | 03/13/20 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | SOME COMMENT MAY NOT APPLY BUT ARE PROVIDED FOR |
| | REFERENCES. |
| | |
| | 1. THE PHYSICAL ADDRESS OF THE RESIDENCE MUST BE ON |
| | PLANS IN FULL, NUMBER, STREET, CITY, STATE AND ZIP CODE |
| | PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 2. PLEASE PROVIDE FOR POOL HEATER MANUFACTURE |
| | SPECIFICATION FOR GAS HEATERS THAT SHOW A MINIMUM |
| | THERMAL EFFICIENCY OF 82 % FOR HEATERS MANUFACTURED ON |
| | OR AFTER APRIL 16, 2013, WHEN TESTED IN ACCORDANCE WITH |
| | ANSI Z 21.56. POOL HEATERS FIRED BY NATURAL OR LP GAS |
| | SHALL NOT HAVE CONTINUOUSLY BURNING PILOT LIGHTS PER |
| | THE 2017 FBC-ENERGY - SEC. R403.10.4SHEETS/INSTALLATION |
| | MANUAL FOR EQUIPMENT TO VERIFY COMPLIANCE WITH 2017 FBC |
| | FUEL GAS R 2408.1. |
| | |
| | 3. PLEASE SUBMIT A FULL MANUFACTURER'S SPECIFICATIONS |
| | FOR THE PRESSURE REGULATORS. REGULATORS INSTALLED ON |
| | THE EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR |
| | OUTDOOR INSTALLATION PER THE 2017 FBC FUEL GAS R |
| | 2421.1. |
| | |
| | 4. PLEASE SHOW ALL SHUT-OFF VALVE, METER, DRIP LEG AND |
| | UNION TO EACH APPLIANCE ON ISOMETRIC PER THE 2017 FBC |
| | FUEL GAS R 2420.4, G2421.2 AND 2419.2. |
| | |
| | 5. PLEASE HAVE A SIGNATURE ON THE ISOMETRIC DRAWING OF |
| | THE PERSON DESIGNING THE SYSTEM, NOT IN ACCORDANCE WITH |
| | FLORIDA ADMINISTRATIVE CODE 61G15-23.001, FLORIDA |
| | STATUTE 471 PER THE WPB AMENDMENTS TO THE FBC SEC. |
| | 107.1 GENERAL. |
| | |
| | 6. A SUB ELECTRICAL PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | |
| | 7. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER THE 2017 FBC |
| | RES. SECS. G2413.4.1, G2413.4.2. |
| | |
| | 8. THE PIPING CHART SAYS SCHEDULE 40 METALLIC PIPE AND |
| | IF IT'S GOING UNDERGROUND THEN THE PIPE SHOULD BE PE SO |
| | THAT CHANGES TO TWO TABLES, IF YOU ARE USING BOTH TYPE |
| | MATERIALS PLEASE PROVIDE BOTH CHARTS AND NOT ON |
| | ISOMETRIC TYPES OF PIPE PER THE WPB AMENDMENTS TO THE |
| | FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 6:30 AM TO 7:30 AM / 2:00 PM TO 5:00 PM |
| | EMAIL: [email protected] CELL: 561-701-6437 |
| | |
| 2020-03-13 16:56:06 | |
| | |