|
 |
 |
 |
 |
 |
Plan Review Details - Permit 20030200
| Plan Review Stops For Permit 20030200 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2020-03-17 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-03-17 |
Time |
06:38 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-03-17 |
Time |
06:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2020-03-05 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-03-05 |
Time |
16:17 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-03-05 |
Time |
16:17 |
Sent To |
|
|
| Notes |
| 2020-03-05 16:18:20 | ***CORRECTIONS*** | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | ASBESTOS REVIEW DENIED: | | | | | | ASBESTOS REQUIREMENTS: | | | | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN PDF | | | FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE | | | THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2020-03-05 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-03-05 |
Time |
16:18 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-03-05 |
Time |
16:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2020-03-12 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-03-12 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-03-12 |
Time |
11:21 |
Sent To |
FIRE |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2020-03-13 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-03-13 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-03-13 |
Time |
14:49 |
Sent To |
P |
|
| Notes |
| 2020-03-13 14:50:18 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | 1) ANY REMOVAL AND/OR CONSTRUCTION OF THE CEILING/WALL | | | AREAS MAY REQUIRE AN EVALUATION OR MODIFICATION OF THE | | | FIRE SPRINKLER AND FIRE ALARM SYSTEMS FOR CODE COVERAGE | | | AND COMPLIANCE BY CERTIFIED CONTRACTORS. | | | | | | 2) ANY AND ALL WORK ON THE FIRE SPRINKLER AND/OR FIRE | | | ALARM SYSTEMS SHALL BE DONE UNDER SEPARATE PERMITS AND | | | SHOP DRAWINGS BY CERTIFIED CONTRACTORS. | | | | | | 3) THE FIRE SPRINKLER AND FIRE ALARM SYSTEMS SHALL | | | REMAIN ACTIVE THROUGHOUT THE DEMO AND CONSTRUCTION | | | PERIODS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-03-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-14 |
Time |
03:19 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-04 |
Time |
13:09 |
Sent To |
|
|
| Notes |
| 2020-03-05 13:09:19 | ROUTED TO PVALENTI |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2020-03-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-14 |
Time |
03:19 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-14 |
Time |
03:16 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |