|
 |
 |
 |
 |
 |
Plan Review Details - Permit 20030156
| Plan Review Stops For Permit 20030156 |
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2020-03-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-18 |
Time |
10:12 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-18 |
Time |
10:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2020-03-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-14 |
Time |
02:55 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-14 |
Time |
02:42 |
Sent To |
|
|
| Notes |
| 2020-03-14 02:55:21 | COMBUSTION AIR IS REQUIRED FOR THE COOKTOP AND THE | | | DRYER. PROVIDE VERIFICATION & CALCULATIONS HOW THE | | | REQUIREMENTS ARE BEING MET.PROVIDE THE CODE SECTIONS | | | FROM THE GAS CODE THAT YOU ARE USING IN THE DESIGN OF | | | THE COMBUSTION AIR REQUIREMENTS. WPB AMEND. TO FBC SEC. | | | 107.2.1, FBC-FUEL GAS SEC.304.1.2ND REQUEST. | | | NOTE: A NOTE HAS BEEN PLACED ON THE PLANS THAT READS | | | "REQUIRES LOUVER DOOR OR VENT IN WALL." PLEASE READ THE | | | PLAN REVIEW COMMENT AND REFER TO THE NOTED CODE | | | SECTIONS. THE CODE REQUIRES CALCULATIONS, NOT A VAGUE | | | NOTE THAT DOES NOT PROVIDE THE REQUIRED INFORMATION. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2020-03-06 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-06 |
Time |
05:55 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-06 |
Time |
05:13 |
Sent To |
|
|
| Notes |
| 2020-03-06 05:55:21 | 1) SUBMIT A GAS RISER DIAGRAM WITH LEGIBLE INFORMATION | | | ON IT. I CANNOT READ SOME OF THE PIPE SIZES BECAUSE THE | | | SIZES ARE WRITTEN SO SMALL AND THEY ARE ILLEGIBLE. GO | | | OVER THE LINES ON THE RISER. A COUPLE OF THEM ARE VERY | | | LIGHT.WPB AMEND. TO FBC SEC. 107.2.1. | | | 2) SHOW THE CORRESPONDING EHD (EQUIVALENT HYDRAULIC | | | DIAMETER) FOR THE STANDARD PIPE SIZES FOR THE | | | CORRUGATED STAINLEASS STEEL TUBING. 2017 FBC-FUEL GAS | | | SEC. 402.1. | | | 3) COMBUSTION AIR IS REQUIRED FOR THE COOKTOP AND THE | | | DRYER. PROVIDE VERIFICATION & CALCULATIONS HOW THE | | | REQUIREMENTS ARE BEING MET.PROVIDE THE CODE SECTIONS | | | FROM THE GAS CODE THAT YOU ARE USING IN THE DESIGN OF | | | THE COMBUSTION AIR REQUIREMENTS. WPB AMEND. TO FBC SEC. | | | 107.2.1, FBC-FUEL GAS SEC.304.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-03-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-18 |
Time |
10:12 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-18 |
Time |
10:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-03-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-14 |
Time |
02:55 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-11 |
Time |
13:15 |
Sent To |
|
|
| Notes |
| 2020-03-12 13:15:47 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-03-06 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-06 |
Time |
05:55 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-04 |
Time |
13:43 |
Sent To |
|
|
| Notes |
| 2020-03-05 13:43:56 | REVISION ROUTED TO TKLARGE |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |