Plan Review Details - Permit 20030124
Plan Review Stops For Permit 20030124
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2020-07-08 Cont ID  
Sent By cpuell Date 2020-07-08 Time 15:42 Rev Time 0.00
Received By cpuell Date 2020-07-08 Time 15:42 Sent To  
Notes
***NONE***

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2020-03-05 Cont ID  
Sent By cpuell Date 2020-03-05 Time 13:32 Rev Time 0.00
Received By cpuell Date 2020-03-05 Time 13:32 Sent To  
Notes
2020-03-05 13:33:32PLEASE PROVIDE SITE PLAN, SHOWING ENTRANCES TO
 DIFFERENT UNITS, INCLUDING LAYOUT FOR 1ST AND 2ND
 FLOOR. PLEASE CONTACT [email protected]

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2020-04-06 Cont ID  
Sent By pvalenti Date 2020-04-06 Time 10:52 Rev Time 0.00
Received By pvalenti Date 2020-04-06 Time 10:52 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2020-03-11 Cont ID  
Sent By shill Date 2020-03-11 Time 18:43 Rev Time 0.00
Received By shill Date 2020-03-11 Time 18:43 Sent To  
Notes
2020-03-11 18:43:40PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND ?ASBESTOS? IN THE SUBJECT LINE.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-04-09 Cont ID  
Sent By dbattles Date 2020-04-09 Time 09:43 Rev Time 0.00
Received By dbattles Date 2020-04-09 Time 09:43 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-04-06 Cont ID  
Sent By pvalenti Date 2020-04-06 Time 10:30 Rev Time 0.00
Received By pvalenti Date 2020-04-06 Time 10:30 Sent To  
Notes
2020-04-06 10:39:39PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 BUILDING PLAN REVIEW DENIED:
  
 FBC B 107.2.2, AS PER LAST BUILDING REVIEW ITEM #5; THE
 INFORMATION ON SHEET G-103B NEEDS TO BE CORRECTED.
 PLEASE CHANGE THE CONSTRUCTION TYPE LISTED IN TYPES OF
 CONSTRUCTION (A) CH.6, LAST COLUMN AT TOP ROW SHOWS
 TYPE 2B. THE FIRST COLUMN SHOWS TYPE 1B, THESE TWO
 COLUMNS NEED TO MATCH.
  
  
  
  
 NOTE: AS PER LAST REVIEW, NO RESPONSE NEEDED FOR
 PROVISOS THEY WILL BE
 ADDED TO PLANS BEFORE BEING ISSUED.
  
 A) PROVIDE PRODUCT APPROVAL FOR ROOF HATCH AND LADDER
 WITH 16 SQ. FT MINUMUM OPENING
 AS REQUIRED BY FBC 1011.12 AND 1011.12.1
  
 B) ENGINEERING FOR HANDRAILS AND GUARDRAILS.
  
 C) SUBMITTAL TO INCLUDE ANY PRODUCT APPROVALS INCLUDING
 WINDOWS, STOREFRONT AND DOORS.
  
 D) ROOFING PRODUCT APPROVALS TO BE SUBMITTED WITH SUB
 PERMIT APPLICATION.
  
 E) I) AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED
 PRIOR TO C.O.
  
 CONTACT WITHIN 90 DAYS OF PERMIT ISSUANCE.
 F) 5) CONSTRUCTION HOURS ? 7AM TO 7PM MON?FRI, 8AM TO
 8PM SAT?SUN
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-03-10 Cont ID  
Sent By dbattles Date 2020-03-10 Time 11:06 Rev Time 0.00
Received By dbattles Date 2020-03-10 Time 11:06 Sent To  
Notes
2020-03-10 11:06:26REVIEW COMMENTS FOR ANCHOR SPACES:
 1) 708.6 FBC{B]SHEET A-101 NOTE A51 STATES EXISTING TO
 REMAIN. PLEASE STATE THE FIRE RATING OF THIS DOOR AS IT
 IS IN A FIRE PARTITION SEPARATING THE TENANT SPACES.
  
 2) 708.1 FBC[B]SHOW 1 HOUR FIRE SEPARATIONS OF TENANT
 SPACES.
  
 3) STATE ON DATA SHEET THE PREVIOUS OCCUPANCY OF ANCHOR
 SPACES.
  
 4) PROVIDE BREAKDOWN OF SQUARE FOOTAGES OF EACH SPACE.
  
 5) SHEET G-103B PLEASE CHANGE THE CONSTRUCTION TYPE
 LISTED IN -TYPES OF CONSTRUCTION-(A) CH. 6- LAST COLUMN
 TO TOP ROW SAYS TYPE 2B.
 MATCH THE TYPE STATED ON THE FIRST COLUMN (TYPE 1-B)
  
 6) 705.8 TABLE FBC[B]SHOW FIRE SEPARATION BETWEEN THE
 NEW PARKING GARAGE AND EXISTING STRUCTURE TO THE SOUTH.
 USE BUILDING TO PROPERTY LINES AS THE SEPARATION
 DISTANCE. STATE THE ALLOWABLE AREA OF OPENINGS BASED ON
 THE SEPARATION DISTANCE.
  
 7) 1011.12 FBC[B]SHEET A-106 SHOWS ROOF HATCH AT 3 FEET
 BY 3 FEET. SEE FBC 1011.12 AND 1011.12.1 FOR REQUIRED
 SIZE OF ROOF HATCH.
  
 PROVISOS: NO RESPONSE NEEDED FOR PROVISOS THEY WILL BE
 ADDED TO PLANS BEFORE BEING ISSUED.
 A) PROVIDE PRODUCT APPROVAL FOR ROOF HATCH AND LADDER
 WITH 16 SQ. FT MINUMUM OPENING
 AS REQUIRED BY FBC 1011.12 AND 1011.12.1
 B) ENGINEERING FOR HANDRAILS AND GUARDRAILS.
 C) SUBMITTAL TO INCLUDE ANY PRODUCT APPROVALS INCLUDING
 WINDOWS, STOREFRONT AND DOORS.
 D) ROOFING PRODUCT APPROVALS TO BE SUBMITTED WITH SUB
 PERMIT APPLICATION.
 E) I) AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED
 PRIOR TO C.O.
 CONTACT WITHIN 90 DAYS OF PERMIT ISSUANCE.
 F) 5) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO
 8PM SAT-SUN
  
 PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW
 EACH COMMENT IS BEING ADDRESSED.
  
 PLEASE FEEL FREE TO CONTACT ME AT 561-805-6718 (M-F
 8-5) TO DISCUSS COMMENTS, OR E-MAIL ANYTIME
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-03-11 Cont ID  
Sent By jpearson Date 2020-03-11 Time 07:26 Rev Time 0.00
Received By jpearson Date 2020-03-11 Time 07:26 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-03-26 Cont ID  
Sent By pleduc Date 2020-03-26 Time   Rev Time 0.00
Received By pleduc Date 2020-03-26 Time 15:05 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-04-06 Cont ID  
Sent By pvalenti Date 2020-04-06 Time 11:32 Rev Time 0.00
Received By pvalenti Date 2020-03-20 Time 09:13 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2020-07-08 Cont ID  
Sent By lmarchan Date 2020-07-08 Time 07:53 Rev Time 0.00
Received By lmarchan Date 2020-07-08 Time 07:53 Sent To  
Notes
2020-07-08 07:53:29NO FEES DUE - SEE 19051045

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2020-03-20 Cont ID  
Sent By dbattles Date 2020-03-20 Time 09:12 Rev Time 0.00
Received By dbattles Date 2020-03-20 Time 09:12 Sent To  
Notes
2020-03-20 09:13:35109 FBC[AMENDED] PLANS WILL BE REVIEWED BY THE PBC
 IMPACT FEE OFFICE DIGITALLY VIA PROJECTDOX UPON
 NOTIFICATION BY THIS OFFICE. NOTIFICATION MAY OCCUR
 WHEN PLANS ARE NEAREST FINAL FORM. YOU MAY COORDINATE
 WITH THE IMPACT FEE OFFICE AT (561) 233-5025 OR SIMPLY
 UPLOAD THE MUNICIPAL IMPACT FEE QUESTIONNAIRE FORM TO
 YOUR PROJECT AND NAME THE FILE MUNICIPAL IMPACT FEE
 QUESTIONNAIRE. THE FORM CAN BE FOUND AT: HTTP://DISCOVE
 R.PBCGOV.ORG/PZB/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QU
 ESTIONNAIRE.PDF UPON APPROVAL AND FEE PAYMENT, PLEASE
 UPLOAD THE RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected]
  
 THANK YOU,
 DYLAN BATTLES
 561-805-6718
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2020-03-20 Cont ID  
Sent By ccole Date 2020-03-20 Time 10:05 Rev Time 0.00
Received By ccole Date 2020-03-20 Time 10:05 Sent To  
Notes
2020-03-20 10:06:05NO MECHANICAL PLANS HAVE BEEN SUBMITTED FOR THE
 PROPOSED PROJECT.
 THE ARCHITECT IS REQUESTING THAT ALL MECHANICAL WORK BE
 PERFORMED UNDER A SEPARATE PERMIT.
 CCOLE- 3/20/20

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-07-13 Cont ID  
Sent By dbattles Date 2020-07-13 Time 11:33 Rev Time 0.00
Received By dbattles Date 2020-07-13 Time 11:33 Sent To  
Notes
2020-07-13 11:34:54SEE COMMENTS ON PERMIT 19051045.

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-03-11 Cont ID  
Sent By tklarge Date 2020-03-11 Time 09:01 Rev Time 0.00
Received By tklarge Date 2020-03-11 Time 09:00 Sent To  
Notes
2020-03-11 09:01:171) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION
 MANUAL FOR THE OIL-GUARD SYSTEM. WPB AMEND. TO FBC SEC.
 107.2.1.
 2) SHT. P000 - PUMP SCHEDULE - A FULL OPEN VALVE IS
 REQUIRED ON THE DISCHARGE SIDE OF THE CHECK VALVE IN
 THE PUMP OR EJECTOR DISCHARGE PIPING BETWEEN THE PUMP
 OR EJECTOR AND THE GRAVITY DRAINAGE SYSTEM.
 FBC-PLUMBING SEC. 712.2,1113.1.4.
 3) SHOW THE DIMENSIONS OF THE SUMP PIT ON SHT.P000. THE
 SUMP PIT SHALL COMPLY WITH FBC-PLUMBING SEC.1113.1.2 AS
 A MINIMUM.
 4) THERE ARE TWO COPIES OF SHT. P000. REMOVE THE OLD
 SHEET FROM THIS SUBMITTAL. WPB AMEND. TO FBC SEC.
 107.2.1.
 5) SHT. P000 - SHOW THE REQUIRED FULL OPEN VALVE ON THE
 SUMP DETAIL.
 6) SHTS. P101 & P102 - SOME OF THE STORM DRAINS ARE
 SHOWN AS 6 INCH ON THE PLAN VIEW YET THE STORM
 ISOMETRIC TYPICAL DECK DRAIN SECTION ONLY SHOWS 4 INCH
 PIPE. CLARIFY.
 7) SHT. P102 - THERE IS A NOTE AT EACH STAIRWELL THAT
 STATES "SHEET FLOW DOWN TO FIRST LEVEL FROM COVERED
 STAIRWELL.REFERENCE CIVIL PLANS FOR STORM DRAINAGE."
 THERE IS NO INFORMATION REGARDING THIS ON THE CIVIL
 DRAWINGS IN THIS SUBMITTAL. CLARIFY THIS NOTE.WPB
 AMEND. TO FBC SEC. 107.2.1.
 8) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION
 MANUAL FOR THE SUMP PUMP. WPB AMEND. TO FBC SEC.
 107.2.1.
 9) SHT. P000 - SUMP PUMP DETAIL STILL SHOWS THE PUMP
 DISCHARGE LINE DIRECTLY CONNECTED TO THE STORM SYSTEM.
 THIS DISCHARGE LINE SHALL BE INDIRECTLY CONNECTED TO
 THE SANITARY SYSTEM PER FBC-PLUMBING SEC.301.6.
 10) THE SANITARY LINE THAT THE PUMP IS DISCHARGING TO
 APPARENTLY HAS BEEN ABANDONED AND IS CAPPED OFF PER ONE
 OF MY FIELD INSPECTORS. RESEARCH SHALL BE DONE AND
 DOCUMENTATION SUBMITTED ON THIS LINE AND VERIFIED BY
 THE DESIGN PROFESSIONAL AND CONTRACTOR THAT THIS LINE
 IS STILL ACTIVE.WPB AMEND. TO FBC SEC. 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop Z ZONING
Rev No 2 Status P Date 2020-07-13 Cont ID  
Sent By jroach Date 2020-07-13 Time 09:33 Rev Time 0.00
Received By jroach Date 2020-07-13 Time 09:33 Sent To  
Notes
2020-07-13 09:33:58ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 07.07.2020
 PERMIT NO.: 20030124
 ________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. SEPARATE PERMITS REQUIRED FOR SITE WORK (PARKING
 LOT), STRIPING, HARDSCAPE, LIGHTING, LANDSCAPING,
 IRRIGATION, ETC.
  
 2. ALL APPLICABLE DEVELOPMENT ORDER CONDITIONS, AS
 SPECIFIED IN RESOLUTION NO. 81-20 SHALL APPLY AND BE
 SATISFIED IN ACCORDANCE WITH THE TIMEFRAMES SPECIFIED
 THEREIN.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  
 19051045 IS FOR PARKING GARAGE
 PLEASE ENTER RESULTS IN 20030124 AS WELL FOR THE ANCHOR
 STORES TO THE SOUTH OF GARAGE.

Review Stop Z ZONING
Rev No 1 Status F Date 2020-03-23 Cont ID  
Sent By jroach Date 2020-03-23 Time 11:08 Rev Time 0.00
Received By jroach Date 2020-03-23 Time 11:08 Sent To  
Notes
2020-03-23 11:08:44ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 3.23.2020
 PERMIT NO.: 19051045
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. THE SITE PLAN INCLUDED SHALL MATCH THAT WHICH WAS
 PREPARED FOR THE MINOR DSI AMENDMENT, AS PREPARED BY
 UDKS. THE SITE PLAN PREPARED BY THE ARCHITECT IS
 MISSING A LOT OF NECESSARY INFORMATION, MAY NOT BE
 CONSISTENT WITH THE MINOR DSI AMENDMENT, ETC.
  
 2. THE SITE PLAN NEEDS TO CLEARLY IDENTIFY THE SCOPE OF
 WORK THAT IS ASSOCIATED WITH THE PERMIT IT IS ASSIGNED
 TO.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved