Plan Review Details - Permit 20021203
| Plan Review Stops For Permit 20021203 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
P |
Date |
2020-03-12 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-03-12 |
Time |
17:52 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-03-12 |
Time |
17:52 |
Sent To |
|
|
| Notes |
| 2020-03-11 11:36:43 | TO TKL DESK | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-03-10 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-10 |
Time |
08:52 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-06 |
Time |
14:05 |
Sent To |
|
|
| Notes |
| 2020-03-09 14:06:07 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-03-02 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-02 |
Time |
03:55 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-02-27 |
Time |
11:45 |
Sent To |
|
|
| Notes |
| 2020-02-28 11:45:38 | PLUMB <5K |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2020-03-12 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-03-12 |
Time |
17:52 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-03-12 |
Time |
17:52 |
Sent To |
|
|
| Notes |
| 2020-03-12 17:53:42 | 03/12/20 REVIEWED FOR CODE COMPLIANCE | | | (PLUMBING/BACKFLOW) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, | | | CONTRACTORS OR THEIR REPRESENTATIVES FROM THE | | | RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEW | | | AVAILABLE FROM 6:30 AM TO 7:30 / 2:00 PM TO 5:00 PM | | | EMAIL: [email protected] CELL: 561-701-6437 | | | | | 2020-03-12 06:29:38 | APPROVED BY PLUMBNG. SENT TO UTILITIES FOR REVIEW. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2020-03-10 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-10 |
Time |
08:52 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-10 |
Time |
08:23 |
Sent To |
|
|
| Notes |
| 2020-03-10 08:51:07 | 1) YOU HAVE SUBMITTED TWO DIFFERENT PERMIT APPLICATIONS | | | WITH TWO DIFFERENT ADDRESSES ON THE APPLICATIONS. WHERE | | | IS THIS DEVICE BEING INSTALLED? DELETE THE APPLICATION | | | FROM THE SUBMITTAL PACKAGE THAT IS NOT APPLICABLE TO | | | THIS INSTALLATION AND ENSURE ALL THE REQUIRED | | | INFORMATION FROM THE FIRST REVIEW IS ON THE APPLICATION | | | TO BE SUBMITTED. WPB AMEND. TO FBC SEC. 107.2.1. | | | | | | NOTE: I CALLED THE CONTRACTOR THREE DIFFERENT TIMES ON | | | 3/10/2020 TO GET INFORMATION AND COULD NOT REACH | | | ANYONE. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2020-03-02 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-03-02 |
Time |
03:54 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-03-02 |
Time |
03:18 |
Sent To |
|
|
| Notes |
| 2020-03-02 03:33:20 | 1) THE DESCRIPTION OF WORK ON THE APPLICATION STATES | | | "NEW PLUMBING " AND SPECS FOR A BACKFLOW DEVICE HAVE | | | BEEN SUBMITTED. THE DESCRIPTION OF WORK ON THE | | | APPLICATION IS SO VAGUE I CANNOT APPROVE THIS PERMIT. | | | IS THERE ANY OTHER PLUMBING WORK BEING DONE? PLACE A | | | CLEAR DESCRIPTION ON THE PERMIT APPLICATION OF THE | | | ENTIRE SCOPE OF WORK TO BE DONE.WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | 2) THE MAKE, MODEL AND SIZE OF THE DEVICE SHALL BE | | | NOTED IN THE DESCRIPTION OF WORK SECTION ON THE PERMIT | | | APPLICATION. WPB AMEND. TO FBC SEC. 107.2.1. | | | 3) ON WHAT TYPE OF SYSTEM IS THE DEVICE BEING INSTALLED | | | ( DOMESTIC WATER, IRRIGATION)? PLACE THIS INFORMATION | | | ON THE PERMIT APPLICATION. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | 4) IS THIS DEVICE BEING INSTALLED AT THE WATER METER ( | | | CONTAINMENT) OR IS IT BEING INSTALLED ON A BRANCH OFF | | | THE DOMESTIC LINE (ISOLATION)? PLACE THIS INFORMATION | | | ON THE PERMIT APPLICATION. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | 5) PIPING FROM THE WATER METER TO THE INLET OF THE | | | BACKFLOW ASSEMBLY SHALL BE TYPE "K" OR "L" COPPER, | | | BRASS OR STAINLESS STEEL PER CITY OF WEST PALM BEACH | | | STANDARD DETAIL DRAWING WS-11. | | | 6) THE VALUE NOTED ON THE APPLICATION SEEMS LOW. SUBMIT | | | A DETAILED, QUANTITY ESTIMATE OR BONA FIDE SIGNED | | | CONTRACT FOR THIS WORK. WPB AMEND. TO FBC SEC. 109.3. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|
|
|