Plan Review Details - Permit 20021132
Plan Review Stops For Permit 20021132
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-03-11 Cont ID  
Sent By rmcdouga Date 2020-03-11 Time 17:59 Rev Time 0.00
Received By rmcdouga Date 2020-03-11 Time 17:59 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-03-23 Cont ID  
Sent By jpearson Date 2020-03-23 Time 12:20 Rev Time 0.00
Received By jpearson Date 2020-03-23 Time 12:20 Sent To I
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status N Date 2020-03-17 Cont ID  
Sent By fmittner Date 2020-03-17 Time 15:44 Rev Time 0.00
Received By fmittner Date 2020-03-17 Time 15:44 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2020-03-23 Time   Rev Time 0.00
Received By lmarchan Date 2020-02-26 Time 12:57 Sent To  
Notes
2020-03-16 18:16:08ROUTED TO HISTORIC INBOX
2020-03-06 17:58:17ROUTED TO PLUMBING
2020-02-27 12:57:43ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-03-16 Cont ID  
Sent By abelisle Date 2020-03-16 Time 14:42 Rev Time 0.00
Received By abelisle Date 2020-03-16 Time 14:41 Sent To I
Notes
2020-03-16 15:11:343/16/2020 PLUMBING REVIEW COMPLETE SENT TO PROCESSING
 A.B

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-03-10 Cont ID  
Sent By abelisle Date 2020-03-10 Time 16:52 Rev Time 0.00
Received By abelisle Date 2020-03-10 Time 16:45 Sent To  
Notes
2020-03-10 16:59:073/10/2020 1ST PLUMBING/POOL REVIEW **DENIED** WITH
 COMMENTS NOTE - A COMPREHENSIVE REVIEW COULD NOT BE
 DONE AT THIS TIME AND ADDITIONAL PLAN REVIEW COMMENTS
 MAY BE GENERATED UPON THE RE-REVIEW OF SUBMITTED
 CORRECTIONS.
  
 1-SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER
 ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013
 EDITION ADDRESSES FLOW RATE IN GALLONS PER MINUTE
 (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE
 DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE
 SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH
 CALCULATIONS MUST INCLUDE ALL OF THE SYSTEM COMPONENTS
 INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES,
 HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS
 EXCEPT THE PUMP.
  
 2-SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9,
 4.4.9.1.
  
 3-SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN
 DRAIN AND FILTER. WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 ATELYO BELISLE
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6695
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2020-03-02 Cont ID  
Sent By rfalcone Date 2020-03-02 Time 14:53 Rev Time 0.00
Received By rfalcone Date 2020-03-02 Time 14:53 Sent To I
Notes
***NONE***