Review Stop G GAS REVIEW
Rev No 3 Status P Date 2020-06-23 Cont ID  
Sent By tklarge Date 2020-06-23 Time 09:42 Rev Time 0.00
Received By tklarge Date 2020-06-22 Time 09:25 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2020-05-05 Cont ID  
Sent By tklarge Date 2020-05-05 Time 06:35 Rev Time 0.00
Received By tklarge Date 2020-05-04 Time 08:08 Sent To  
Notes
2020-05-04 10:59:401) ALL GAS APPLIANCES SHALL BE LISTED AND LABELED PER
 FBC-FUEL GAS SEC.301.3. THE SUBMITTED SPECIFICATIONS
 FOR THE RANGE, GRILL AND POOL HEATER DO NOT SHOW THE
 LISTING FOR THE APPLIANCES.
 2) THE POOL HEATER SHALL HAVE A THERMAL EFFICIENCY OF
 82% PER FBC-ENERGY SEC.R403.10.4. SUBMIT VERIFICATION
 OF COMPLIANCE.
 3) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE UNVENTED
 GAS LOG, FIREPLACE, CLOTHES DRYERS, AND RANGE, FBC-FUEL
 GAS SEC.304.1. THE RESPONSE FROM FAE REFERS TO SHT.
 M1.1. THERE WAS NO SHT. M1.1 SUBMITTED.
 4) SUBMIT THE SPECIFICATIONS FOR THE GENERATOR THAT
 SHOW THE MODEL OF THE GENERATOR BEING INSTALLED. WPB
 AMEND. TO FBC SEC. 107.2.1.
 5) THE FUEL FLOW RATE (BTU LOAD) SHOWN IN THE SUBMITTED
 GENERATOR SPECIFICATIONS DOES NOT CORRELATE WITH THE
 BTU LOAD OF THE GENERATOR SHOWN ON THE GAS RISER.
 CLARIFY.
 6) THE GAS PLANS CALL OUT 2 DIFFERENT GAS SIZING TABLES
 FOR THE LOW PRESSURE SYSTEM- 402.4 (1) & 402.4 (2).
 CLARIFY.
 7) SHOW THE DISTANCE FROM THE MAIN GAS LINE TO THE
 GENERATOR.
 8) SHOW THE DISTANCE FROM EACH REGULATOR TO THE GAS
 APPLIANCE. INCLUDE THE DIMENSIONS OF ALL OFFSETS AND
 DROPS TO THE APPLIANCE. THE CODE REQUIRES THE DEVELOPED
 LENGTH.
 9) THE 1 1/2 INCH SCH. 40 PIPE LINE TO THE POOL HEATER,
 FIREPLACE AND FIREPIT IS UNDERSIZED PER GAS SIZING
 TABLE 402.4 (2). THE TABLE ALLOWS 532 MBTU'S AT THE
 CALCULATED LENGTH AND THE PLANS SHOW 540 MBTU'S.
 10) THE 3/4 INCH SCH. 40 METALLIC PIPE TO THE FIREPIT
 IS UNDERSIZED PER GAS SIZING TABLE 402.4 (2). THE TABLE
 ALLOWS 92 MBTU'S AT THE CALCULATED LENGTH AND THE PLANS
 SHOW 100 MBTU'S.
 11) THE 1 1/4 INCH LINE TO THE GENERATOR MAY BE
 UNDERSIZED. THE DISTANCE FROM THE REGULATOR TO THE
 GENERATOR IS REQUIRED TO DETERMINE IF THE PIPE SIZE IS
 CODE COMPLIANT.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-02-26 Cont ID  
Sent By lcrespo Date 2020-02-26 Time 16:57 Rev Time 0.00
Received By lcrespo Date 2020-02-26 Time 16:57 Sent To  
Notes
2020-02-26 17:30:571ST GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
 SOME COMMENT MAY NOT APPLY BUT ARE PROVIDED FOR
 REFERENCES.
  
  
 1. THE PHYSICAL ADDRESS OF THE RESIDENCE MUST BE ON
 PLANS IN FULL, NUMBER, STREET, CITY, STATE AND ZIP CODE
 PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 2. PLEASE PROVIDE FOR EACH AND ALL APPLIANCES
 MANUFACTURES SPECIFICATION SHEETS/INSTALLATION MANUAL
 FOR EQUIPMENT TO VERIFY COMPLIANCE WITH 2017 FBC FUEL
 GAS R 2408.1.
  
 3. PLEASE SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION PER THE 2017 FBC FUEL GAS R 2421.1.
  
 4. PLEASE SHOW ALL SHUT-OFF VALVE TO EACH APPLIANCE ON
 FLAT AND ISOMETRIC PER THE 2017 FBC FUEL GAS R 2420.4.
  
 5. PLEASE SHOW THE DISTANCE FROM THE POINT OF DELIVERY
 TO THE MOST REMOTE OUTLET IN THE BUILDING AND/OR SYSTEM
 PER THE 2017 FBC FUEL GAS. R 2413.4.1.
  
 6. SUBMIT COMBUSTION AIR CALCULATIONS FOR GAS
 APPLIANCES. WHERE IS COMBUSTION AIR PROVIDED BY THE
 BUILDING'S MECHANICAL VENTILATION SYSTEM, THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR? 2017 FBC
 FUELS GAS R 2407.9.3. COMBINED COMBUSTION AIR AND
 VENTILATION AIR SYSTEM.
  
 7. SHUT OFF VALVES FOR FIREPLACE SHALL BE IN EACH ROOM
 AS THE UNIT NOT OUTSIDE PLEASE SHOW ON FLAT AND
 ISOMETRIC PER THE 2017 FBC FUEL GAS R 2420.5.
  
 8. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1' OF
 EITHER SIDE PER THE 2017 FBC FUEL GAS R 2421.2.
  
 9. PLEASE LABEL DRIP LEG ON ALL EQUIPMENT INSTALLED PER
 THE 2017 FBC FUEL GAS R 2419.2.
  
 10. SHOW DIMENSIONS OF THE LOCATION FOR EACH TANKLESS
 WATER HEATER NEXT TO EACH OTHER AND DISTANCE OF ANY
 OPERABLE DOORS OR WINDOWS IN RELATION TO THE WATER
 HEATER. THE LOCATION OF THE WATER HEATER SHALL COMPLY
 WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS PER
 THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION
 ON CONSTRUCTION DOCUMENTS.
  
 11. SUBMIT SPECIFICATION FOR THE GENERATOR. THE
 MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR SHALL
 BE ONSITE FOR FINAL GAS INSPECTION. THE GENERATOR SHALL
 BE LISTED AND APPROVED. NFPA 58 SEC. 5.20.1. THE
 GENERATOR SHALL MEET THE REQUIREMENTS OF UL 2200.
  
 12. GENERATOR IS NOT SHOWN IN PLANS AND IF IT IS A
 FUTURE MUST BE SHOWN LABELED WITH SHUTOFF VALVE AND
 HARD CAP PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 6:30 AM 7:30 / 2:00 PM TO 5:00 PM
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-06-23 Cont ID  
Sent By tklarge Date 2020-06-23 Time 09:42 Rev Time 0.00
Received By tklarge Date 2020-06-18 Time 15:37 Sent To  
Notes
2020-06-18 15:37:24ROUTED TO T.LARGE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-05-05 Cont ID  
Sent By tklarge Date 2020-05-05 Time 06:36 Rev Time 0.00
Received By tklarge Date 2020-04-27 Time 14:11 Sent To  
Notes
2020-05-02 14:11:28TO TKL DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-02-26 Cont ID  
Sent By lcrespo Date 2020-02-26 Time 16:57 Rev Time 0.00
Received By lcrespo Date 2020-02-24 Time 13:14 Sent To  
Notes
2020-02-25 13:14:25REVISION ROUTED TO LCRESPO

Review Stop P PLUMBING
Rev No 2 Status N Date 2020-05-05 Cont ID  
Sent By tklarge Date 2020-05-05 Time 06:35 Rev Time 0.00
Received By tklarge Date 2020-05-05 Time 06:35 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-02-26 Cont ID  
Sent By lcrespo Date 2020-02-26 Time 16:57 Rev Time 0.00
Received By lcrespo Date 2020-02-26 Time 16:57 Sent To  
Notes
***NONE***