|
 |
 |
 |
 |
 |
Plan Review Details - Permit 20020967
| Plan Review Stops For Permit 20020967 |
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2020-03-24 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2020-03-24 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2020-03-24 |
Time |
|
Sent To |
I |
|
| Notes |
| 2020-03-24 15:13:51 | ENGINEERING REVIEW COMPLETE. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2020-03-16 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2020-03-16 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2020-03-16 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-03-16 13:55:56 | THE SUBMITTED SHOP DRAWING FOR THE COLT 400 BACKFLOW IS | | | NOT USC APPROVED. PLEASE SEE APPROVED BACKFLOW SHOP | | | DRAWINGS REVIEWED UNDER FORMAL ENGINEERING SUBMITTAL | | | E18020047. BACKFLOW SHALL BE LEAD-FREE AND USC | | | APPROVED. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR WPB, FL 33401 (MAILING | | | ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 MOBILE: (561) 246-9525 | | | EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2020-03-16 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-03-16 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-03-16 |
Time |
10:22 |
Sent To |
|
|
| Notes |
| 2020-03-16 10:28:04 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) INSTALL, TEST AND INSPECT PER NFPA 24, STANDARD FOR | | | THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND | | | THEIR APPURTENANCES, 2013 EDITION. | | | | | | | | | 2) DO NOT COVER OVER AND PIPE/JOINTS PRIOR TO | | | INSPECTIONS. | | | | | | | | | 3) PROVIDE MANUFACTURES SPEC SHEETS FOR FIRE INSPECTOR | | | REVIEW AND VERIFICATIONS ON INSPECTIONS | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-03-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-03-21 |
Time |
11:44 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-03-11 |
Time |
09:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2020-03-20 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-03-20 |
Time |
11:35 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-03-20 |
Time |
11:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2020-03-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-03-21 |
Time |
11:44 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-03-21 |
Time |
11:44 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |