Plan Review Details - Permit 20020407
Plan Review Stops For Permit 20020407
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-03-11 Cont ID  
Sent By rmcphers Date 2020-03-11 Time 08:12 Rev Time 0.00
Received By rmcphers Date 2020-03-11 Time 08:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-02-21 Cont ID  
Sent By rmcphers Date 2020-02-21 Time 10:15 Rev Time 0.00
Received By rmcphers Date 2020-02-21 Time 10:15 Sent To  
Notes
2020-02-21 10:18:16FULL SET OF PLANS PROVIDED IN PROJECT DOX UNDER PERMIT
 NUMBER 19031394

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-02-19 Cont ID  
Sent By rmcphers Date 2020-02-19 Time 15:41 Rev Time 0.00
Received By rmcphers Date 2020-02-19 Time 15:16 Sent To  
Notes
2020-02-19 15:54:53HARDSCAPE ?
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED -
 1) PLEASE BE MORE SPECIFIC ON THE BUILDING PERMIT
 APPLICATION "WORK DESCRIPTION" WHAT ARE YOU REQUESTING
 A PERMIT FOR ? (CONCRETE PAVING, STEPS,CURBS, PADS
 ETC.) FBC WPB AMENDMENTS 105.3
 2) PLEASE PROVIDE ALL DETAILS FOR EACH COMPONET -
 CONCRETE THICKNESS, REINFORCEMENT ETC. - STAIR DETAILS
 RISER, TREADS, RAILING ETC. - ACCESSIBILITY SLOPES ETC.
 FBC WPB AMENDMENTS 107
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2020-03-11 Cont ID  
Sent By rrossano Date 2020-03-11 Time   Rev Time 0.00
Received By rrossano Date 2020-03-11 Time   Sent To  
Notes
2020-03-11 09:27:08REVIEWED UNDER FORMAL ENGINEERING SUBMITTAL E19010017.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2020-02-24 Cont ID  
Sent By RRossano Date 2020-02-24 Time   Rev Time 0.00
Received By rrossano Date 2020-02-24 Time   Sent To I
Notes
2020-02-24 12:22:13REVIEWED UNDER FORMAL ENGINEERING SUBMITTAL E19010017.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-03-19 Cont ID  
Sent By lmarchan Date 2020-03-19 Time 12:42 Rev Time 0.00
Received By lmarchan Date 2020-03-05 Time 09:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-02-25 Cont ID  
Sent By lmarchan Date 2020-02-25 Time 07:56 Rev Time 0.00
Received By lmarchan Date 2020-02-11 Time 10:44 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-03-11 Cont ID  
Sent By rmcphers Date 2020-03-11 Time 08:14 Rev Time 0.00
Received By rmcphers Date 2020-03-11 Time 08:14 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-02-19 Cont ID  
Sent By rmcphers Date 2020-02-19 Time 15:55 Rev Time 0.00
Received By rmcphers Date 2020-02-19 Time 15:55 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2020-03-19 Cont ID  
Sent By eschneid Date 2020-03-19 Time 12:14 Rev Time 0.50
Received By eschneid Date 2020-03-19 Time 12:14 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-02-24 Cont ID  
Sent By eschneid Date 2020-02-24 Time 15:36 Rev Time 0.50
Received By eschneid Date 2020-02-24 Time 15:36 Sent To PC
Notes
2020-02-24 15:53:33FAILED
  
 1) THE PLANS SHOW THE RELOCATION OF THE LIFT STATION
 WHICH CAUSES A RECONFIGURATION OF THE PARKING SPACES.
 THE RECONFIGURED PARKING SPACES AND LIFT STATION AFFECT
 THE TERMINAL LANDSCAPE ISLAND TREES. STAFF HAS NOT BEEN
 PROVIDED A PLAN TO VERIFY THAT THE MINIMUM CODE
 REQUIREMENTS WILL CONTINUE TO BE MET WITH THE PROPOSED
 RECONFIGURATION. STAFF WILL NOT APPROVE THIS PERMIT
 UNTIL AN APPROVABLE LANDSCAPE PLAN IS PROVIDED.
  
 2) THE AMENDMENT PLANS REQUIRE REVISIONS TO THE PARKING
 STRIPING AND LANDSCAPE PLANS AS WELL AS A MINOR PLANNED
 DEVELOPMENT AMENDMENT.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved