Plan Review Details - Permit 20020299
Plan Review Stops For Permit 20020299
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2020-02-20 Cont ID  
Sent By lcrespo Date 2020-02-20 Time 07:27 Rev Time 0.00
Received By lcrespo Date 2020-02-20 Time 07:27 Sent To  
Notes
2020-02-20 07:28:3502/20/20 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 6:30 AM 7:30 / 2:00 PM TO 5:00 PM
 [email protected]
 561-701-6437
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-02-12 Cont ID  
Sent By lcrespo Date 2020-02-12 Time 15:07 Rev Time 0.00
Received By lcrespo Date 2020-02-12 Time 07:27 Sent To  
Notes
2020-02-12 15:08:1102/12/2020 1ST PLUMBING/GAS REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
 1. PLEASE PROVIDE MANUFACTURER'S SPECIFICATIONS OF AN
 UPDATED VERSION FOR THE GENERATOR AND THEY SHALL BE
 ONSITE FOR FINAL GAS INSPECTION. THE GENERATOR SHALL BE
 LISTED AND APPROVED. NFPA 58 SEC. 5.20.1. THE GENERATOR
 SHALL MEET THE REQUIREMENTS OF UL 2200.
 2. THE GENERATOR THAT YOU HAVE STATED ON YOUR PLANS
 SAYS 308 BTU'S AND THEY ARE 330 BTU'S ON THE SPEC SO
 PLEASE MAKE SURE THAT IS REFLECTED ON YOUR ISOMETRIC
 PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
 3. PLEASE LABEL AND SHOW THE SHUTOFF VALVE AND DRIP LEG
 ON GAS ISOMERIC PER THE 2017 FBC RES. SEC. G2401.1.3.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-02-20 Cont ID  
Sent By lcrespo Date 2020-02-20 Time 07:27 Rev Time 0.00
Received By lcrespo Date 2020-02-14 Time 13:39 Sent To  
Notes
2020-02-18 13:39:42RESUB ROUTED TO LCRESPO

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-02-12 Cont ID  
Sent By lcrespo Date 2020-02-12 Time 15:08 Rev Time 0.00
Received By lcrespo Date 2020-02-07 Time 13:47 Sent To  
Notes
2020-02-10 13:47:25PLUMB <5K