Plan Review Details - Permit 20011115
Plan Review Stops For Permit 20011115
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-01-31 Cont ID  
Sent By rmcdouga Date 2020-01-31 Time 13:19 Rev Time 0.00
Received By rmcdouga Date 2020-01-31 Time 13:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-01-30 Cont ID  
Sent By lcrespo Date 2020-01-30 Time 17:05 Rev Time 0.00
Received By lcrespo Date 2020-01-28 Time 14:48 Sent To  
Notes
2020-01-29 14:48:44PLUMB <5K

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-01-31 Cont ID  
Sent By rmcdouga Date 2020-01-31 Time 13:19 Rev Time 0.00
Received By rmcdouga Date 2020-01-31 Time 13:12 Sent To  
Notes
2020-01-31 13:19:10PROVISO
  
 THE PRE-FABRICATED SHOWER PAN IS REQUIRED TO COMPLY
 WITH ASME A112.19.2. PROVIDE MANUFACTURER'S
 SPECIFICATIONS SHOWING THAT THE SHOWER PAN COMPLIES
 WITH THIS STANDARD TO THE PLUMBING INSPECTOR IN THE
 FIELD.

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-01-30 Cont ID  
Sent By lcrespo Date 2020-01-30 Time 17:05 Rev Time 0.00
Received By lcrespo Date 2020-01-30 Time 17:05 Sent To  
Notes
2020-01-30 17:10:2401/30/20 1ST PLUMBING REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THE SCOPE OF WORK IS NOT CLEAR ON TO WHAT IS BEING
 DONE. WAS THE SHOWER A TUB OR IS THERE AN EXISTING
 SHOWER THERE, IS THE SHOWER VALVE AND WALL COMPONENT
 GOING TO BE REPLACED, ARE YOU GOING TO BE CHANGING
 CABINETS AND OR ELECTRICAL FIXTURES (HIGH-HAT) AND OR
 OUTLETS AS THE OTHER ITEM WILL REQUIRE SEPARATE PERMITS
 FOR THE EXTENT OF WORK THAT MAY TAKE PLACE PER THE WPB
 AMENDMENTS TO THE FBC SEC. 101.2.
  
 2. THE PHYSICAL ADDRESS OF THE RESIDENCE MUST BE ON
 PLANS IN FULL, NUMBER, STREET, CITY, STATE AND ZIP CODE
 PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 3. PLEASE HAVE A SIGNATURE ON THE DRAWINGS OF THE
 PERSON THAT IS SKETCHING THE WORK PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.1 GENERAL.
  
 4. A SUB BUILDING AND IF ANY ELECTRICAL A PERMIT IS
 REQUIRED FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM