Plan Review Details - Permit 20010094
| Plan Review Stops For Permit 20010094 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2020-06-17 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-06-17 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-06-16 |
Time |
15:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-02-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-02-13 |
Time |
09:07 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-02-13 |
Time |
09:07 |
Sent To |
|
|
| Notes |
| 2020-02-13 09:17:12 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | 1) THIS PROJECT WAS SUPPOSED TO BE BROKEN UP INTO THREE | | | (3) SPEARATE PERMITS BECAUSE OF THE ELECTRICAL SERVICE | | | AREAS "A", "B", AND "C" | | | | | | 2) THE AVAILABLE FAULT CURRENT SHALL BE CALCULATED FOR | | | THE SERVICE IN CONJUNCTION WITH THE AVAILABLE FAULT | | | FROM FPL AT THE TRANSFORMER. | | | | | | 110.24 AVAILABLE FAULT CURRENT | | | ( A) FIELD MARKING. SERVICE EQUIPMENT IN OTHER THAN | | | DWELLING UNITS SHALL BE LEGIBLY MARKED IN THE FIELD | | | WITH THE MAXIMUM | | | AVAILABLE FAULT CURRENT. THE FIELD MARKING(S) SHALL | | | INCLUDE THE DATE THE FAULT-CURRENT CALCULATION WAS | | | PERFORMED AND BE OF SUFFICIENT | | | DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-07-06 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-07-06 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-06-03 |
Time |
08:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-04-10 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-04-10 |
Time |
06:04 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-01-27 |
Time |
08:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2020-07-06 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-07-06 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-07-06 |
Time |
14:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-02-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-02-13 |
Time |
10:51 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-02-13 |
Time |
10:51 |
Sent To |
|
|
| Notes |
| 2020-02-13 10:54:10 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | | | | PLAN IS REQUIRED TO BE SIGNED AND SEALED BY A DESIGN | | | PROFESSIONAL | | | | | | BECAUSE OF THE VOLTAGE (480) IT NEEDS TO BE SIGNED AND | | | SERALED BY AN ENGINEER. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2020-06-25 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2020-06-25 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2020-06-25 |
Time |
14:48 |
Sent To |
|
|
| Notes |
| 2020-06-25 14:48:42 | PROVISO: CITY STANDARD FIXTURE AND POLE SHALL BE BLACK. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2020-04-09 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2020-04-09 |
Time |
13:53 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2020-04-09 |
Time |
13:53 |
Sent To |
|
|
| Notes |
| 2020-04-09 14:03:49 | 1. PLEASE PROVIDE A DETAIL SPEC DRAWING FOR THE ACORN | | | LIGHT FIXTURE PROPOSED EAST OF DIXIE HWAY. IT SHOULD | | | FOLLOW CITY STANDARDS FOR DOWNTOWN. | | | 2. DO WE NEED POLE 26? IT IS RIGHT NEXT TO AN EXISTING | | | COUNTY LIGHT (POLE 133). COULD WE MAKE THE LAMP ON THE | | | EXISTING COUNTY A TRIPLE HEAD AND REMOVE 26? THERE ARE | | | SEVERAL POLES IN THAT AREA. | | | 3. ARE POLES 84 AND 85 MOUNTED ON THE MAST ARM? IF NOT, | | | HOW ARE THEY LOCATED NEXT TO THE EXISTING MAST AMS? | | | 4. PLEASE INDICATE THE LOCATION OF THE RAILROAD | | | CROSSINGS SIGNAL POLES. | | | 5. PLEASE CONFIRM LOCATION OF POLES ON NORTH SIDE OF | | | BANYAN FROM DIXIE TO OLIVE ARE COORDINATED WITH THE | | | PROPOSED 303 BANYAN PROJECT. DEPENDING ON THE SCHEDULE | | | OF THE PRIVATE PROJECT, THESE FIXTURES COULD BE | | | EXCLUDED FROM THE SCOPE OF WORK. | | | 6. POLES 111-113 AND,117 - 114 ARE ALREADY INSTALLED | | | (OLD ICTY HALL PROJECT). | | | 7. WHERE IS POLE 130? | | | 8. PLEASE CONFIRM PROPOSED LIGHT FIXTURE INCLUDES THE | | | 7-PIN RECEPTACLE REQUIRED BY CITY STANDARDS. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|
|