Plan Review Details - Permit 19120918
Plan Review Stops For Permit 19120918
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2020-01-17 Cont ID  
Sent By rrossano Date 2020-01-17 Time   Rev Time 0.00
Received By rrossano Date 2020-01-17 Time   Sent To I
Notes
2020-01-17 07:09:11PASSED WITH PROVISOS:
  
 1 - CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-6 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-7 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) SEE CITY STANDARD
 DETAILS AT LINK BELOW:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 2 - CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR WPB, FL 33401 (MAILING
 ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098
 FAX: (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-12-30 Cont ID  
Sent By rrossano Date 2019-12-30 Time   Rev Time  
Received By rrossano Date 2019-12-30 Time   Sent To I
Notes
2019-12-30 08:02:46PLEASE ADDRESS ZONING COMMENTS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-01-17 Cont ID  
Sent By ccarvaja Date 2020-01-17 Time 09:20 Rev Time 0.00
Received By ccarvaja Date 2020-01-08 Time 15:41 Sent To  
Notes
2020-01-15 15:41:36ROUTED TO ENGINEERING
2020-01-09 14:08:31RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-12-30 Cont ID  
Sent By cpuell Date 2019-12-30 Time 09:09 Rev Time 0.00
Received By cpuell Date 2019-12-20 Time 14:03 Sent To  
Notes
2019-12-20 14:03:50ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2020-01-13 Cont ID  
Sent By rfalcone Date 2020-01-13 Time 15:35 Rev Time 0.00
Received By rfalcone Date 2020-01-13 Time 15:35 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2019-12-24 Cont ID  
Sent By rfalcone Date 2019-12-24 Time 08:51 Rev Time 0.00
Received By rfalcone Date 2019-12-24 Time 08:51 Sent To ENG
Notes
2019-12-24 08:52:5312/24/19 FAILED.
  
 CLEARLY SHOW THE REQUIRED THREE (3) FOOT SIDE SETBACK
 FROM THE DRIVEWAY TO THE PROPERTY LINE ON THE SURVEY.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT
 E-MAIL: [email protected]
 TEL: (561) 822-1442
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved