Plan Review Details - Permit 19120701
Plan Review Stops For Permit 19120701
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-01-07 Cont ID  
Sent By rmcdouga Date 2020-01-07 Time 08:56 Rev Time 0.00
Received By rmcdouga Date 2020-01-07 Time 08:56 Sent To I
Notes
2020-01-07 08:57:53CONTRACTOR EMAILED DIGITALLY SIGNED GENERATOR PAD
 DRAWINGS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-01-03 Cont ID  
Sent By rmcdouga Date 2020-01-03 Time 10:56 Rev Time 0.00
Received By rmcdouga Date 2020-01-03 Time 10:56 Sent To  
Notes
2020-01-03 10:59:16PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) AT LEAST ONE OF THE ENGINEERED DRAWINGS FOR THE
 GENERATOR PAD HAS TO HAVE THE ENGINEER'S SEAL AND
 ORIGINAL HANDWRITTEN SIGNATURE. FAC 61G15-23.003
 PROCEDURES FOR PHYSICALLY SIGNING AND SEALING PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
 ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER
 DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN
 ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025,
 F.S., AND RULE 61G15-23.001, F.A.C. MUST BE PHYSICALLY
 SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE
 PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE.
 (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE
 LICENSEE?S SIGNATURE ON EACH PAGE REQUIRED TO BE
 SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR
 COPIED IMAGE OF THE LICENSEE?S SIGNATURE SHALL NOT BE
 USED.
 (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY
 CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY
 OVERLAPPING THE LICENSEE?S SIGNATURE ON EACH PAGE
 REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL
 NOT RENDER THE SIGNATURE ILLEGIBLE.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-12-31 Cont ID  
Sent By jleahy Date 2019-12-31 Time 15:28 Rev Time 0.00
Received By jleahy Date 2019-12-31 Time 15:28 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2019-12-30 Cont ID  
Sent By lcrespo Date 2019-12-30 Time 14:09 Rev Time 0.00
Received By lcrespo Date 2019-12-30 Time 14:09 Sent To  
Notes
2019-12-30 14:10:43GAS PERMIT UNDER 19120065

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-01-07 Cont ID  
Sent By rmcdouga Date 2020-01-07 Time 08:58 Rev Time 0.00
Received By rmcdouga Date 2020-01-07 Time 08:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status P Date 2019-12-31 Cont ID  
Sent By jleahy Date 2019-12-31 Time 15:29 Rev Time 0.00
Received By jleahy Date 2019-12-18 Time 14:12 Sent To  
Notes
2019-12-19 14:12:29ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2019-12-23 Cont ID  
Sent By rfalcone Date 2019-12-23 Time 14:44 Rev Time 0.00
Received By rfalcone Date 2019-12-23 Time 14:44 Sent To B
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved