| Plan Review Stops For Permit 19120697 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2020-03-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-03-12 |
Time |
07:06 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-03-12 |
Time |
07:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-01-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-01-21 |
Time |
15:15 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-01-21 |
Time |
10:41 |
Sent To |
|
|
| Notes |
| 2020-01-21 15:32:18 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) PROVIDE STRUCTURAL DRAWINGS FOR THE EXACT | | | INSTALLATION DETAILS FOR ANCHORING THE GENERATOR | | | STRUCTURAL SUPPORTS TO THE CONCRETE FLOOR SLAB AS | | | INDICATED ON THE GENERATOR DETAIL ON SHEET E-0.03. FBC | | | 107.2.1 | | | | | | 2) THE STRUCTURAL ENGINEER IS TO VERIFY THAT THE 4" | | | THICK CONCRETE SLAB ON GRADE THAT IS SHOWN ON THE | | | BUILDING PLANS IS ADEQUATE TO SUPPORT THE GRAVITY LOADS | | | OF THE GENERATOR SET. PROVIDE CALCULATIONS. FBC | | | 107.2.1.2 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2020-03-02 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-03-02 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-03-02 |
Time |
08:57 |
Sent To |
|
|
| Notes |
| 2020-03-02 09:23:37 | RAISED VALUE TO MARSHALL SWIFT MINIMUM JLEAHY |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2020-03-01 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-03-01 |
Time |
10:34 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-03-01 |
Time |
10:34 |
Sent To |
|
|
| Notes |
| 2020-03-01 10:35:27 | SEE NOTES FROM FIRST REVIEW | | | | | | SUBMIT A SIGNED CONTRACT FOR THE GENERATOR SHOWING | | | VALUE FOR GENERATOR , LABOR AND FUEL TANK. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-01-10 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-01-10 |
Time |
09:25 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-01-10 |
Time |
09:11 |
Sent To |
|
|
| Notes |
| 2020-01-10 09:26:55 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | 1) VALUE FOR THE WORK SHOWN IS LOW PLEASE SUBMIT A | | | SIGNED CONTRACT FOR THE WORK INVOLVED, INCLUDING | | | GENERATOR, FUEL TANK, TRANSFER SWITCHES, ECT. ECT. | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2020-03-02 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-03-02 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-03-02 |
Time |
12:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2019-12-31 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-12-31 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-12-31 |
Time |
10:38 |
Sent To |
|
|
| Notes |
| 2019-12-31 11:02:16 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | | 1) THERE ARE NO INDICATIONS OF THE EXHAUST SYSTEM. | | | | | | PER NFPA 110. | | | | | | 7.10 EXHAUST SYSTEM. | | | 7.10.1 THE EXHAUST SYSTEM EQUIPMENT AND INSTALLATION, | | | INCLUDING | | | PIPING, MUFFLER, AND RELATED ACCESSORIES, SHALL BE IN | | | ACCORDANCE WITH NFPA37, STANDARD FOR THE INSTALLATION | | | AND USE OF | | | STATIONARY COMBUSTION ENGINES AND GAS TURBINES, AND | | | OTHER APPLICABLE | | | STANDARDS. | | | 7.10.2 EXHAUST SYSTEM INSTALLATION SHALL BE GASTIGHT TO | | | PREVENT | | | EXHAUST GAS FUMES FROM ENTERING INHABITED ROOMS OR | | | BUILDINGS | | | AND TERMINATE IN SUCH A MANNER THAT TOXIC FUMES CANNOT | | | REENTER A BUILDING OR STRUCTURE, PARTICULARLY THROUGH | | | WINDOWS, | | | AIR VENTILATION INLETS, OR THE ENGINE AIR-INTAKE | | | SYSTEM. | | | 7.10.3* EXHAUST PIPING SHALL BE CONNECTED TO THE PRIME | | | MOVER | | | BY MEANS OF A FLEXIBLE CONNECTOR AND SHALL BE | | | INDEPENDENTLY | | | SUPPORTED THEREAFTER SO THAT NO DAMAGING WEIGHT OR | | | STRESS IS | | | APPLIED TO THE ENGINE EXHAUST MANIFOLD OR TURBOCHARGER. | | | | | | PLEASE DSPROVIDE THE EXHAUST SYSTEM DETAIL PER THE NFPA | | | CODE. | | | | | | | | | | | | 2) THERE IS NO INDIOCATION OF THE FUEL TANK VENTING. | | | | | | PER NFPA 110 | | | | | | 7.9.1.1 ALL FUEL TANKS AND SYSTEMS SHALL BE INSTALLED | | | AND MAINTAINED | | | IN ACCORDANCE WITH NFPA 30, FLAMMABLE AND COMBUSTIBLE | | | LIQUIDS CODE; NFPA 37, STANDARD FOR THE INSTALLATION | | | AND USE OF | | | STATIONARY COMBUSTION ENGINES AND GAS TURBINES; NFPA | | | 54, NATIONAL | | | FUEL GAS CODE; AND NFPA 58, LIQUEFIED PETROLEUM GAS | | | CODE. | | | | | | PER NFPA 30 | | | | | | 27.8.1 VENT PIPING FOR ABOVEGROUND STORAGE TANKS. | | | 27.8.1.1 WHERE THE OUTLETS OF VENT PIPES FOR TANKS | | | STORING | | | CLASS I LIQUIDS ARE ADJACENT TO BUILDINGS OR PUBLIC | | | WAYS, THEY | | | SHALL BE LOCATED SO THAT VAPORS ARE RELEASED AT A SAFE | | | POINT | | | OUTSIDE OF BUILDINGS AND NOT LESS THAN 12 FT (3.6 M) | | | ABOVE THE | | | ADJACENT GROUND LEVEL. | | | 27.8.1.2 VAPORS SHALL BE DISCHARGED UPWARD OR | | | HORIZONTALLY | | | AWAY FROM ADJACENT WALLS. | | | 27.8.1.3 VENT OUTLETS SHALL BE LOCATED SO THAT VAPORS | | | WILL NOT BE | | | TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALL BE AT | | | LEAST 5 FT | | | (1.5 M) FROM BUILDING OPENINGS AND AT LEAST 15 FT (4.5 | | | M) FROM | | | POWERED VENTILATION AIR INTAKE DEVICES. | | | | | | PLEASE PROVIDE DETAILS FO THE FUEL TANK VENT SYSTEM. | | | | | | | | | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | | | | | | | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
N |
Date |
2020-02-28 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-02-28 |
Time |
11:26 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-02-28 |
Time |
11:26 |
Sent To |
|
|
| Notes |
| 2020-02-28 11:26:31 | THIS IS A DIESEL GENERATOR; NO LP/GAS | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2020-01-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-01-22 |
Time |
06:49 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-01-08 |
Time |
17:32 |
Sent To |
|
|
| Notes |
| 2020-01-22 06:49:47 | 1ST PLUMBING/GAS REVIEW**DENIED**19120697 | | | 1) PROVIDE A SITE PLAN CLEARLY SHOWING LOCATION OF | | | GENERATOR AND GENERATOR EXHAUST FROM BUILDING, WINDOWS, | | | DOORS, AND PROPERTY LINE. FBC 107.3.5 | | | 2) SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE, | | | TERMINATION POINT, AND ANCHORING DETAILS OF THE GAS | | | EXHAUST VENT(S) PER 2017 FBC-FUEL GAS SECS. 502 THRU | | | 505. | | | 3) IT APPEARS THE FUEL STORAGE TANK AND GENERATOR DID | | | NOT COME FROM THE FACTORY AS 1 UNIT. PLEASE CLARIFY. IF | | | NOT PLEASE PROVIDE A COMPLETE TANK TO GENERATOR FUEL | | | PIPING SHOWING MATERIAL BEING USED, SIZE FOR SUPPLY, | | | RETURN, AND VENT. FBC 107.3.5 | | | | | | TIM HUNT | | | PLUMBING PLAN REVIEW | | | CITY OF WEST PALM BEACH (CGA SOLUTIONS) | | | 561-248-2703 | | | [email protected] | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-03-12 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-03-12 |
Time |
14:21 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-02-26 |
Time |
08:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-01-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-01-22 |
Time |
06:49 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-12-24 |
Time |
09:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2020-03-02 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2020-03-02 |
Time |
12:07 |
Rev Time |
0.00 |
| Received By |
hmoser |
Date |
2020-03-02 |
Time |
08:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
N |
Date |
2020-02-28 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-02-28 |
Time |
11:26 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-02-28 |
Time |
11:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2020-01-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-01-22 |
Time |
06:48 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-01-08 |
Time |
17:32 |
Sent To |
|
|
| Notes |
| 2020-01-22 06:49:27 | REVIEWED REMOTELY BY TIM HUNT | | | SEE GAS REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2020-03-02 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-03-02 |
Time |
09:25 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-03-02 |
Time |
09:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-01-09 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2020-01-09 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2020-01-09 |
Time |
14:42 |
Sent To |
|
|
| Notes |
| 2020-01-09 14:42:09 | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | IS REQUIRED TO BE SIGNED AND SEALED BY THE PERSON | | | RESPONSIBLE FOR THE DESIGN. A DIGITAL PLAN REQUIRES A | | | DIGITAL SIGNATURE WITH THE PROPER THIRD PARTY | | | VERIFICATION. SELF-CERTIFICATION IS NOT ACCEPTABLE FOR | | | ENGINEERS. PROVIDE CORRECTION FOR ALL SHEETS WITH THIRD | | | PARTY VERIFICATION. ADDITIONALLY, SHEET A1.00 IS NOT | | | DIGITALLY SIGNED. WPB FBC 107.1; FS 471/481 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2020-03-12 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2020-03-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2020-03-12 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-03-12 10:32:11 | GENERATOR LOCATED WITHIN THE BUILDING. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2020-01-03 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2020-01-03 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
2020-01-03 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-01-03 15:48:32 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | IT IS NOT CLEAR IN THE PLANS TO WHERE THE PROPOSED | | | GENERATOR WILL BE LOCATED (I.E. IS IT EXTERIOR OR | | | INTERIOR TO THE BUILDING?). THE LOCATION OF THE | | | GENERATOR MUST BE CLEARLY IDENTIFIED IN THE PLANS. | | | | | | SHEET A1.00: NEW RED BOX DETECTED AT THE NORTHEAST | | | CORNER OF THE BUILDING. PLEASE IDENTIFY AND/OR REMOVE | | | THE ELEMENT FROM THE SITE PLAN, AS THIS ELEMENT IS NOT | | | REFLECTED IN THE APPROVED PLANS. | | | | | | ANY MODIFICATIONS TO THE SITE AND/OR APPROVED | | | ARCHITECTURAL ELEVATIONS WILL REQUIRE A MINOR PD | | | AMENDMENT PRIOR TO ZONING APPROVAL FOR THIS PERMIT. | | | | | | NOTES: | | | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | * REFERENCE: PB 997C (AS-BUILT PLANS) | | | | | | * ZONE: RPD (GEORGIAN GARDENS APARTMENTS) | | | |
|
|