| 2020-01-24 18:04:34 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 2ND REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) REPEAT COMMENT. SHEET 4 OF 5 OF PRODUCT APPROVAL |
| | FL11291-R7 REQUIRES A 3-1/2" EDGE DISTANCE FOR THE |
| | ANCHOR SPACING OF 12" LISTED IN THE TABLE. A 3" EDGE |
| | DISTANCE IS SPECIFIED IN THE INSTALLATION SCHEDULE THAT |
| | WAS SUBMITTED. THE NOTES THAT ARE BELOW THE TABLE |
| | REQUIRE THE ANCHOR SPACING IN THE TABLE TO BE |
| | MULTIPLIED BY .86 WHEN THE EDGE DISTANCE IS 3". |
| | THEREFORE THE SPACING WOULD BE 10.32 " WHICH IS 12" X |
| | .86. PLEASE CORRECT. |
| | |
| | 2) THE TABLE FROM THE STORM CATCHER THAT IS MARKED IS |
| | TABLE 4 WHICH IS FOR CONCRETE. THE INSTALLATION |
| | SCHEDULE YOU SUBMITTED SPECIFIES THAT THE SUBSTRATE IS |
| | CONCRETE BLOCK. TABLE 16 ON PAGE 25 IS FOR HOLLOW |
| | CONCRETE BLOCK AND TABLE 12 ON PAGE 21 IS FOR GROUT |
| | FILLED CONCRETE BLOCK. USE THE TABLE THAT MATCHES THE |
| | SUBSTRATE THAT YOU WILL BE ANCHORING TO. IF IT IS |
| | POURED CONCRETE YOU WILL NEED TO CHANGE THE |
| | INSTALLATION SCHEDULE FROM CONCRETE BLOCK TO CONCRETE. |
| | IT IS NOT CLEAR WHICH METHOD OF ATTACHMENT WILL BE USED |
| | TO INSTALL THE STORM CATCHER ABATEMENT SCREEN SYSTEM. |
| | THERE ARE SEVERAL DIFFERENT WAYS TO ATTACH THE FABRIC |
| | TO THE STRUCTURE SHOWN IN THE PRODUCT APPROVAL. CIRCLE |
| | THE APPROPRIATE ITEMS IN THE PRODUCT APPROVAL AND |
| | PROVIDE A DIAGRAM DRAWING THAT CLEARLY SHOWS HOW THE |
| | FABRIC WILL BE INSTALLED. FBC 107.2.1 |
| | |