Plan Review Details - Permit 19120587
Plan Review Stops For Permit 19120587
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-01-07 Cont ID  
Sent By jwitmer Date 2020-01-07 Time 15:02 Rev Time 0.00
Received By jwitmer Date 2020-01-07 Time 10:35 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-12-31 Cont ID  
Sent By jleahy Date 2019-12-31 Time 14:03 Rev Time 0.00
Received By jleahy Date 2019-12-31 Time 14:03 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-12-30 Cont ID  
Sent By pleduc Date 2019-12-30 Time   Rev Time 0.00
Received By pleduc Date 2019-12-18 Time 10:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-01-09 Cont ID  
Sent By gjohnson Date 2020-01-09 Time 19:05 Rev Time 0.00
Received By gjohnson Date 2019-12-16 Time 10:45 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2020-01-07 Cont ID  
Sent By ccole Date 2020-01-07 Time 14:26 Rev Time 0.00
Received By ccole Date 2020-01-07 Time 14:26 Sent To  
Notes
***NONE***

Review Stop MEDGAS MEDICAL GAS
Rev No 1 Status P Date 2020-01-09 Cont ID  
Sent By gjohnson Date 2020-01-09 Time 18:53 Rev Time 0.00
Received By gjohnson Date 2020-01-09 Time 18:53 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-01-09 Cont ID  
Sent By gjohnson Date 2020-01-09 Time 18:53 Rev Time 0.00
Received By gjohnson Date 2020-01-09 Time 18:53 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-01-13 Cont ID  
Sent By shill Date 2020-01-13 Time 11:03 Rev Time 0.00
Received By shill Date 2020-01-13 Time 11:03 Sent To  
Notes
2020-01-13 11:05:38ENGINEER WILL OBTAIN DIGITAL SIGNATURE FROM CERTIFICATE
 AUTHORITY (KURT PENNER, PE)
 THIS IS HIS 2ND NOTIFICATION (ADVISED ON 7/9/19);
 FUTURE SUBMITTALS WILL NOT BE ACCEPTED WITHOUT
 COMPLIANT SIGNATURE
  
 ADDED THE FOUR M PAGES TO SIGNATURE FOLDER IN
 PROJECTDOX

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-01-09 Cont ID  
Sent By gjohnson Date 2020-01-09 Time 18:54 Rev Time 0.00
Received By gjohnson Date   Time   Sent To  
Notes
2020-01-10 17:32:06SPOKE WITH ENGINEER - HE WILL EMAIL THE PAGES WHICH ARE
 NOT DIGITALLY SIGNED DIRECTLY TO ME
  
 [email protected]
  
 WILL PASS WITH PROVISO; ENGINEER WILL OBTAIN DIGITAL
 SIGNATURE ISSUED BY CERTIFICATE AUTHORITY
  
2020-01-09 18:54:26THE PLUMBING SHEETS HAVE ELECTRONIC SIGNATURES AND
 SEALS THAT ARE SELF-CERTIFIED BY THE EOR- 3RD PARTY
 CERTIFICATION REQUIRED.
2020-01-07 14:34:22MECHANICAL PLAN SHEETS M0.2, M1.2, M2.2, M3.2 ARE NOT
 ELECTRONICALLY SIGNED AND SEALED AS REQUIRED BY FL.
 STATUTE 471.025 AND SECTION 61G15-23.005 FLORIDA
 ADMINISTRATIVE CODE. THE REMAINING MECH SHEETS HAVE
 ELECTRONIC SIGNATURES AND SEALS THAT ARE SELF-CERTIFIED
 BY THE EOR- 3RD PARTY CERTIFICATION REQUIRED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved