Plan Review Details - Permit 19120506
Plan Review Stops For Permit 19120506
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-02-20 Cont ID  
Sent By jgomez Date 2020-02-20 Time 16:37 Rev Time 0.00
Received By jgomez Date 2020-02-20 Time 16:32 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-02-20 Cont ID  
Sent By jleahy Date 2020-02-20 Time 13:31 Rev Time 0.00
Received By jleahy Date 2020-02-20 Time 13:31 Sent To  
Notes
2020-02-20 16:38:53ENTERED BY ELECTRICAL REVIEWER BY MISTAKE. JG.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-12-30 Cont ID  
Sent By jgomez Date 2019-12-30 Time 12:59 Rev Time 0.00
Received By jgomez Date 2019-12-30 Time 11:38 Sent To E
Notes
2019-12-30 13:00:45SIGN BUILDING REVIEW COMMENTS
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 NOTE: SEC. 702.6 FBC-EXISTING BUILDING. ALL NEW WORK
 SHALL COMPLY WITH THE MATERIALS AND METHODS
 REQUIREMENTS IN THE FLORIDA BUILDING CODE.
  
 1- ACCORDING TO SEC. 1609.4 FBC-BUILDING, THIS BUILDING
 IS LOCATED IN EXPOSURE "D" NOT EXPOSURE "C". ENGINEER
 TO REVISE THE SIGN DESIGN CALCULATIONS AS REQUIRED.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-02-20 Cont ID  
Sent By jgomez Date 2020-02-20 Time 16:43 Rev Time 0.00
Received By jgomez Date 2020-02-20 Time 16:43 Sent To  
Notes
2020-02-20 16:45:01ELECTRICAL REVIEWER ENTERED THE BUILDING REVIEW BY
 MISTAKE. SEE APPROVAL BY JAKE LEAHY UNDER THE BUILDING
 REVIEW. I PASSED THE ELECTRICAL REVIEW BECAUSE JAKE
 ALREADY LEFT THE OFFICE. JG.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-01-03 Cont ID  
Sent By jleahy Date 2020-01-03 Time 15:42 Rev Time 0.00
Received By jleahy Date 2020-01-03 Time 15:42 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-02-20 Cont ID  
Sent By jgomez Date 2020-02-20 Time 16:45 Rev Time 0.00
Received By jgomez Date 2020-02-12 Time 14:12 Sent To I
Notes
2020-02-18 07:47:17RESUB ROUTED TO JLEAHY INBOX
2020-02-13 14:13:09RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-01-03 Cont ID  
Sent By jleahy Date 2020-01-03 Time 15:42 Rev Time 0.00
Received By jleahy Date 2019-12-12 Time 14:10 Sent To  
Notes
2019-12-13 14:10:40ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2020-02-14 Cont ID  
Sent By rfalcone Date 2020-02-14 Time 10:10 Rev Time 0.00
Received By rfalcone Date 2020-02-14 Time 10:10 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2019-12-24 Cont ID  
Sent By rfalcone Date 2019-12-24 Time 11:39 Rev Time 0.00
Received By rfalcone Date 2019-12-24 Time 11:39 Sent To B
Notes
2019-12-24 11:40:0612/24/19 PASSED.
  
 APPROVED VARIANCE IN 2008.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved