| 2019-12-13 07:01:20 | 12/13/19 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. THERE SEEMS TO BE A GAS HEATER PERMIT APPLIED FOR |
| | THIS AS HEATER UNDER PERMIT 19091100 AND YOU ARE |
| | REQUESTING TO CHANGE OUT A POOL HEATER. THERE IS NO |
| | RECORD OF A POOL HEATER INSTALLED OR INSPECTED IN CITY |
| | RECORDS FOR 235 POTTER RD. IF YOU ARE TAKING OVER THE |
| | JOB OVER PLEASE HAVE PROVIDE EMAIL OR LETTER FROM THE |
| | POOL CONTRACTOR STATING THAT YOU ARE THE NEW CONTRACTOR |
| | OF RECORD. |
| | 2. A SUB GAS PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | 3. THE PHYSICAL ADDRESS OF THE PROJECT MUST BE ON PLANS |
| | IN FULL, NUMBER, STREET, CITY, STATE AND ZIP CODE PER |
| | THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION |
| | ON CONSTRUCTION DOCUMENTS. |
| | 4. GAS RISER DIAGRAM REQUIRED WPB AMENDMENTS TO THE FBC |
| | SEC. 107.3.5.3 (12) RESIDENTIAL GAS. |
| | 5. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2017 FBC RES. SEC. G2413.2, G2413.4.3. |
| | 6. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS-STEEL TUBING (IF APPLICABLE) FOR |
| | EACH PIPE SIZE. WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 7. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER THE 2017 FBC |
| | RES. SEC. G2413.4.1. |
| | 8. SUBMIT TWO COPIES OF THE SIZING TABLE USED IN THE |
| | DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS |
| | OF PLANS LISTING THE SIZING TABLES FROM GAS CODES OR |
| | ANOTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS |
| | SYSTEM PER THE 2017 FBC RES. SEC. G2413.3. |
| | 9. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION PER THE 2017 FBC RES. SEC. G2421.1. |
| | 10. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1' OF |
| | EITHER SIDE PER THE 2017 FBC FG SEC 410.2. |
| | 11. PLEASE LABEL THE SHUTOFF VALVE ON GAS ISOMERIC PER |
| | THE 2017 FBC RES. SEC. G2401.1.3. |
| | 12. SHOW DRIP LEG ON EQUIPMENT INSTALLED PER THE 2017 |
| | FBC RES. SEC. G2419.2. |
| | 13. SHOW THE BTU LOAD FOR THE FUTURE POOL HEATER. THIS |
| | VALUE MUST BE INCLUDED IN THE SIZING OF THE SYSTEM PER |
| | THE 2017 FBC RES. SEC G2413.2 MAXIMUM GAS DEMAND. |
| | 14. SUBMIT A SITE PLAN THAT SHOWS THE LOCATION OF THE |
| | POOL HEATER IN RELATION TO BUILDING OPENINGS (SOFFITS) |
| | AND OPERABLE DOORS AND WINDOWS. THE POOL HEATER EXHAUST |
| | SHALL BE LOCATED PER THE POOL HEATER INSTALLATION |
| | MANUAL PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 6:30 AM 7:30 / 2:00 PM TO 5:00 PM |
| | [email protected] |
| | 561-701-6437 |
| | |