| Plan Review Stops For Permit 19120420 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2020-02-07 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2020-02-07 |
Time |
18:04 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2020-02-07 |
Time |
16:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2020-01-23 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2020-01-23 |
Time |
14:31 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2020-01-23 |
Time |
09:59 |
Sent To |
|
|
| Notes |
| 2020-01-23 14:31:21 | TENANT BUILD-OUT, REVISION SECOND BUILDING REVIEW | | | CHECKLIST. | | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS | | | | | | ORIGINAL COMMENT: | | | 1- WATER CLOSET IN REVISED RESTROOM #108 NEED TO BE | | | LOCATED IN THE CORNER, DIAGONAL TO THE DOOR. REVISE AS | | | REQUIRED BY SEC 213.3.1 AND SEC 604.8.1.7 | | | FBC-ACCESSIBILITY. | | | | | | RESPONSE: | | | A) DISCUSSED PROPOSED TOILET LAYOUT WITH ROBERT BROWN | | | (BUILDING OFFICIAL). PROPOSED LAYOUT SHOWN ON THE | | | ENLARGED TOILET PLAN MAY WORK WITH SEC. 604.3.2 | | | FBC-ACCESSIBILITY FOR OVERLAPPING OF CLEARANCES, BUT IS | | | MISSING INFORMATION. PLEASE PROVIDE WRITTEN DIMENSIONS | | | FOR ALL REQUIRED CLEARANCES. SPECIFY THE DIMENSIONS FOR | | | THE DOOR MANEUVERING CLEARANCES, SPECIFY THE 60" | | | TURNING CIRCLE AND THE CLEARANCES FOR THE WATER CLOSET. | | | SEC. 107.2.1 CITY AMENDMENTS. | | | | | | B) ALL PLANS SUBMITTED UNDER THIS REVISION NEED TO BE | | | REVISED SHOWING THE PROPOSED LAYOUT. THERE ARE SOME | | | PLANS THAT WERE NOT REVISED TO REFLECT THE PROPOSED | | | CHANGES. REVISE AS REQUIRED TO MATCH. SEC. 107.2.1 CITY | | | AMENDMENTS. | | | | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2019-12-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2019-12-24 |
Time |
13:13 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2019-12-24 |
Time |
09:48 |
Sent To |
|
|
| Notes |
| 2019-12-24 13:19:32 | TENANT BUILD-OUT, REVISION BUILDING REVIEW COMMENTS | | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS | | | | | | 1- WATER CLOSET IN REVISED RESTROOM #108 NEED TO BE | | | LOCATED IN THE CORNER, DIAGONAL TO THE DOOR. REVISE AS | | | REQUIRED BY SEC 213.3.1 AND SEC 604.8.1.7 | | | FBC-ACCESSIBILITY. | | | | | | 2- A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2020-02-09 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-02-09 |
Time |
10:53 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-02-09 |
Time |
10:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2019-12-30 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-12-30 |
Time |
14:27 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-12-30 |
Time |
14:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2020-02-10 |
|
|
Cont ID |
|
| Sent By |
sathomas |
Date |
2020-02-10 |
Time |
00:00 |
Rev Time |
0.00 |
| Received By |
sathomas |
Date |
2020-02-10 |
Time |
00:00 |
Sent To |
B |
|
| Notes |
| 2020-02-10 09:12:06 | PROVISO: | | | | | | THERE IS NO SPECIFIC REFERENCE TO THE ACCESS CONTROL | | | EXCEPT FOR SHEET A.108 THAT INDICATES PLACEMENT OF | | | MAGLOCKS, REQUEST TO EXIT BUTTON, ELECTRIC STRIKE, ETC. | | | PLEASE INDICATE WHERE YOUR SCOPE OF WORK RELATES TO THE | | | ACCESS CONTROL THAT IS BEING PROPOSED. IF THE ACCESS | | | CONTROL IS INSTALLED BY ?OTHERS? THAT ENTITY IS THE ONE | | | THAT SHOULD BE APPLYING FOR THE PERMIT. | | | | | | S. THOMAS | | | 561-804-4728 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2020-01-29 |
|
|
Cont ID |
|
| Sent By |
sathomas |
Date |
2020-01-29 |
Time |
00:00 |
Rev Time |
0.00 |
| Received By |
sathomas |
Date |
2020-01-29 |
Time |
00:00 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2019-12-30 |
|
|
Cont ID |
|
| Sent By |
bwoods |
Date |
2019-12-30 |
Time |
00:00 |
Rev Time |
0.00 |
| Received By |
sathomas |
Date |
2019-12-30 |
Time |
00:00 |
Sent To |
E |
|
| Notes |
| 2019-12-30 09:40:37 | THERE IS NO INDICATION OF LIFE SAFETY SYSTEMS LISTED ON | | | THE LIFE SAFETY PLAN SHEET. | | | THE ENTIRE PAGE IS CLOUDED, WITH NO INDICATION AS TO | | | WHAT CHANGES WERE MADE. | | | | | | S. THOMAS | | | 561-804-4728 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-02-25 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-02-25 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-02-06 |
Time |
11:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-01-31 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-01-31 |
Time |
14:35 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-01-17 |
Time |
09:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-01-12 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2020-01-12 |
Time |
08:38 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2019-12-13 |
Time |
07:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2020-02-25 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-02-25 |
Time |
08:11 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-02-21 |
Time |
09:31 |
Sent To |
|
|
| Notes |
| 2020-02-25 08:12:30 | REVIEWED REMOTELY BY TIM HUNT | | | APPROVED WITH PROVISO: 30 MINS | | | | | | 1) SHT. A-501 MIRROR SHALL BE MOUNTED MAX 40? TO THE | | | REFLECTIVE SURFACE AND NOT THE BOTTOM EDGE. FBC-ACC | | | 603.3 | | | 2) SHT.A-501 TOILET PAPER HOLDER SHALL BE MOUNTED 7?-9? | | | TO THE CENTER OF THE 1ST ROLL AND NOT THE CENTER OF THE | | | DEVICE. FBC-ACC 604.7 | | | 3) SHT P-100 A REVISED ISOMETRIC BY 1ST INSPECTION | | | SHOWING NO OTHER THEN BATHROOM GROUP FIXTURES ARE BEING | | | DISCHARGE INTO THE BATHROOM GROUP WET VENT. FBC-PLB | | | 912. | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2020-01-31 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-01-31 |
Time |
13:40 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-01-30 |
Time |
14:52 |
Sent To |
|
|
| Notes |
| 2020-01-31 13:40:06 | 1) ALL PLANS SUBMITTED UNDER THIS REVISION NEED TO BE | | | REVISED SHOWING THE PROPOSED LAYOUT. THERE ARE SOME | | | PLANS THAT WERE NOT REVISED TO REFLECT THE PROPOSED | | | CHANGES. REVISE AS REQUIRED TO MATCH. SEC. 107.2.1 CITY | | | AMENDMENTS. | | | 2) SHT.A501 SHOWS A GRAB BAR IN THE VERTICAL POSITION | | | AT E/08G1. GRAB BARS SHALL BE INSTALLED IN A HORIZONTAL | | | POSITION PER 2017 FBC-ACCESS. SEC. 609.4. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2020-01-09 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2020-01-09 |
Time |
14:31 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2020-01-09 |
Time |
10:26 |
Sent To |
|
|
| Notes |
| 2020-01-14 09:27:00 | 1ST REVIEW:19120420 | | | 2017 FLORIDA BUILDING CODE 6TH EDITION | | | 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH | | | EDITION | | | | | | PLUMBING COMMENTS: | | | | | | 1. THE DOOR FOR BATHROOM #108 IS DIRECTLY IN FRONT OF | | | THE TOILET THAT IS A CODE VIOLATION. DOORS SHALL BE | | | LOCATED IN THE FRONT PARTITION OR IN THE SIDE WALL OR | | | PARTITION FARTHEST FROM THE WATER CLOSET. WHERE LOCATED | | | IN THE FRONT PARTITION, THE DOOR OPENING SHALL BE 4 | | | INCHES MAXIMUM FROM THE SIDE WALL OR PARTITION FARTHEST | | | FROM THE WATER CLOSET. PER FBC ACC 604.8.1.2 | | | | | | 2.WHERE PLUMBING FIXTURES ARE REQUIRED, SEPARATE | | | FACILITIES SHALL BE PROVIDED FOR EACH SEX. PER FBC PL | | | 403.2 | | | | | | 3. SHT. A-501 DETAIL E-08G1 THE REAR WALL GRAB BAR | | | SHALL BE 36 INCHES LONG MINIMUM AND EXTEND FROM THE | | | CENTERLINE OF THE WATER CLOSET 12 INCHES MINIMUM ON ONE | | | SIDE AND 24 INCHES MINIMUM ON THE OTHER SIDE. PER FBC | | | ACC 604.5.2 | | | | | | 4. SHT. A-501 DETAIL E-08G2 HAS A NOTE NOT USED PLEASE | | | CLARIFY. PER WPB AMEND TO FBC 107.2.1 | | | | | | END OF COMMENTS | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2020-02-25 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-02-25 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-02-07 17:59:17 | ARCHITECTURAL SHEETS OK. JG. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-01-31 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-01-31 |
Time |
13:41 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-01-31 |
Time |
13:41 |
Sent To |
|
|
| Notes |
| 2020-01-31 13:42:20 | REVISED PLANS WILL HAVE TO BE CHECKED FOR SIGNATURES. | | | TKL. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2019-12-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2019-12-24 |
Time |
13:24 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2019-12-24 |
Time |
13:24 |
Sent To |
|
|
| Notes |
| 2019-12-24 13:21:48 | REVISED PLANS WILL NEED TO BE REVIEWED FOR SIGNATURE. | | | JG. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2020-02-18 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2020-02-18 |
Time |
16:04 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2020-02-18 |
Time |
15:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2020-01-10 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2020-01-10 |
Time |
11:05 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2020-01-10 |
Time |
10:50 |
Sent To |
|
|
| Notes |
|
|