Plan Review Details - Permit 19110804
Plan Review Stops For Permit 19110804
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-01-22 Cont ID  
Sent By dbattles Date 2020-01-22 Time 11:02 Rev Time 0.00
Received By dbattles Date 2020-01-22 Time 11:02 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-12-27 Cont ID  
Sent By dbattles Date 2019-12-27 Time 13:50 Rev Time 0.00
Received By dbattles Date 2019-12-27 Time 13:50 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-01-22 Cont ID  
Sent By jleahy Date 2020-01-22 Time 15:47 Rev Time 0.00
Received By jleahy Date 2020-01-22 Time 15:47 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-12-17 Cont ID  
Sent By jleahy Date 2019-12-17 Time 13:36 Rev Time 0.00
Received By jleahy Date 2019-12-17 Time 13:36 Sent To  
Notes
2019-12-17 13:36:57ELECTRICAL PASS UPON MECHANICAL PASS JLEAHY

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-01-15 Cont ID  
Sent By pleduc Date 2020-01-15 Time   Rev Time 0.00
Received By pleduc Date 2020-01-15 Time 15:11 Sent To B
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-11-25 Cont ID  
Sent By pleduc Date 2019-11-25 Time   Rev Time 0.00
Received By pleduc Date 2019-11-25 Time 14:43 Sent To M
Notes
2019-11-25 15:01:49THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
  
 1) THERE NO INDICATIONS OF THE INSTALLATION COMPLYING
 WITH ANY NFPA CODE.
  
 THE INSTALLATION SHALL COMPLY WITH NFPA 30A AND ALL
 OTHER APPLICABLE CODES
  
 CHAPTER 1 ADMINISTRATION
 1.1* SCOPE.
 1.1.1 SCOPE. THIS CODE SHALL APPLY TO MOTOR FUEL
 DISPENSING
 FACILITIES AND MOTOR FUEL DISPENSING AT FARMS AND
 ISOLATED CONSTRUCTION
 SITES.
  
 PLEASE REIVEW, ENSURE COMPLIANCE AND PROVIDE AN
 APPLICABLE NOTE;
  
  
 2) THERE ARE INDICATIONS OF DIMENSIONS FOROM NEAREST
 BUILDINGS
  
 PER NFPA 30A
  
 4.3.2* ABOVEGROUND STORAGE TANKS. EXCEPT AS MODIFIED BY
 THE
 PROVISIONS OF THIS SUBSECTION, ABOVEGROUND STORAGE
 TANKS SHALL
 MEET ALL APPLICABLE REQUIREMENTS OF CHAPTERS 21 AND 22
 OF
 NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE.
 4.3.2.1 THE USE OF ABOVEGROUND STORAGE TANKS AT MOTOR
 FUEL
 DISPENSING FACILITIES, FLEET VEHICLE MOTOR FUEL
 DISPENSING FACILITIES,
 AND MARINE MOTOR FUEL DISPENSING FACILITIES SHALL BE
 PERMITTED WHEN INSTALLED IN ACCORDANCE WITH THE
 REQUIREMENTS
 OF THIS SUBSECTION AND WITH ALL APPLICABLE REQUIREMENTS
 OF CHAPTERS 21, 22, AND 27 OF NFPA 30, FLAMMABLE AND
 COMBUSTIBLE LIQUIDS CODE, AND, FOR TANKS OTHER THAN
 TANKS IN
 VAULTS, WHEN THE SPECIFIC INSTALLATION HAS BEEN
 APPROVED BY
 THE AUTHORITY HAVING JURISDICTION.
  
 NFPA 30
  
 22.4* LOCATION OF ABOVEGROUND STORAGE TANKS.
 22.4.1 LOCATION WITH RESPECT TO PROPERTY LINES, PUBLIC
 WAYS,
 AND IMPORTANT BUILDINGS.
 22.4.1.1 TANKS STORING CLASS I, CLASS II, OR CLASS IIIA
 STABLE
 LIQUIDS WHOSE INTERNAL PRESSURE IS NOT PERMITTED TO
 EXCEED A
 GAUGE PRESSURE OF 2.5 PSI (17 KPA) SHALL BE LOCATED IN
 ACCORDANCE
 WITH TABLE 22.4.1.1(A) AND TABLE 22.4.1.1(B). WHERE
 TANK SPACING IS BASED ON A WEAK ROOF-TO-SHELL SEAM
 DESIGN, THE
 USER SHALL PRESENT EVIDENCE CERTIFYING SUCH
 CONSTRUCTION TO THE
 AUTHORITY HAVING JURISDICTION UPON REQUEST.
  
 PLEASE PROVIDE DIMENSIONS COMPLYING WITH THE MINIMUM
 DIEMSIONS.
  
  
 3) THE INSTALLATION AND TESTING OF PIPING SHALL BE PER
 NFPA 30 CH 27
  
 27.3 GENERAL REQUIREMENTS.
 27.3.1 PERFORMANCE STANDARDS. THE DESIGN, FABRICATION,
 ASSEMBLY,
 TEST, AND INSPECTION OF PIPING SYSTEMS SHALL BE
 SUITABLE
 FOR THE WORKING PRESSURES AND STRUCTURAL STRESSES TO BE
 ENCOUNTERED
 BY THE PIPING SYSTEM. COMPLIANCE WITH APPLICABLE
 SECTIONS
 OF ASME B31, CODE FOR PRESSURE PIPING, AND THE
 PROVISIONS
 OF THIS CHAPTER SHALL BE CONSIDERED PRIMA FACIE
 EVIDENCE OF COMPLIANCE
 WITH THE FOREGOING PROVISIONS.
  
 PLEASE REVIEW, ENSURE COMPLIANCE AND PROVIDE AN
 APPLICABLE NOTE.
  
  
 4) THERE AR NO EQUIPMENT MANUFACTURE SPEC SHEETS NOR A
 TANK MANUFACTURE SPEC SHEET ATTACHED.
  
 PLEASE SUBMIT THE APPLICABLE EQUIPMENT SPEC SHEETS FOR
 THE PROPOSED PROJECT,
  
  
  
 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-01-22 Cont ID  
Sent By jleahy Date 2020-01-22 Time 15:47 Rev Time 0.00
Received By jleahy Date 2020-01-14 Time 13:45 Sent To  
Notes
2020-01-15 13:45:47RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-12-27 Cont ID  
Sent By dbattles Date 2019-12-27 Time 13:50 Rev Time 0.00
Received By dbattles Date 2019-11-18 Time 14:13 Sent To  
Notes
2019-11-19 14:13:29ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2020-01-22 Cont ID  
Sent By ccole Date 2020-01-22 Time 12:38 Rev Time 0.00
Received By ccole Date 2020-01-22 Time 11:38 Sent To E
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-12-09 Cont ID  
Sent By ccole Date 2019-12-09 Time 08:24 Rev Time 0.00
Received By ccole Date 2019-12-09 Time 08:04 Sent To E
Notes
2019-12-09 10:31:13 
 1ST REVIEW FBC-2017 MECHANICAL
 PERMIT #19110804
 12/9/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
 NFPA 30- 2015
 NFPA 30A- 2015
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PAGE 1: THE VACANT LOT ADJACENT TO THE PROPOSED FUEL
 TANK LOCATION HAS A SEPARATE PCN NUMBER THEREFORE IS A
 LOT THAN CAN BE SOLD OR BUILT UPON. REFER TOTABLES
 22.4.1.1(A) AND 22.4.1.1(B) NFPA 30 AND INDICATE THE
 SEPARATION DISTANCE BETWEEN THE TANK AND THE ADJACENT
 LOT.
  
 2) PROVIDE A COPY OF THE UL CERTIFICATE FOR THE FUEL
 TANK AND A MANUFACTURER'S PRODUCT DATA SHEET- SECTION
 22.2.3 NFPA 30.
  
 3) PAGE 1: REFER TO SECTION 6.2.1 NFPA 30A AND INDICATE
 THE SEPARATION DISTANCES FORM THE FUEL DISPENSERS AND
 THE ADJACENT PROPERTY LINE.
  
 4) PROVIDE COPIES OF THE UL CERTIFICATES AND
 MANUFACTURER'S PRODUCT DATA SHEETS FOR THE FUEL
 DISPENSERS, THE HOSE BREAKAWAY DEVICES, AND AUTO
 SHUTOFF NOZZLES- AND A MANUFACTURER'S PRODUCT DATA
 SHEET- SEE SECTIONS 6.3.2, 6.5.2, AND 6.6.1 NFPA 30A.
  
 5) PAGE 2, NOTE #5: THE LENGTH OF THE DISPENSING HOSE
 SHALL NOT BE GREATER THAN 18'. PLEASE CORRECT THE 20'
 LENGTH SPECIFIED- SECTION 6.5.1 NFPA 30A.
  
 6) PAGE 3: INDICATE THE BOLLARDS WILL BE FILLED WITH
 CONCRETE, AND WILL BE SET NOT LESS THAN 3' DEEP IN A
 CONCRETE FOOTING OF NOT LESS 15 IN. DIAMETER- SECTION
 4.3.7.2 (1) (3) NFPA 30A.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved