| 2019-11-25 15:01:49 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | |
| | 1) THERE NO INDICATIONS OF THE INSTALLATION COMPLYING |
| | WITH ANY NFPA CODE. |
| | |
| | THE INSTALLATION SHALL COMPLY WITH NFPA 30A AND ALL |
| | OTHER APPLICABLE CODES |
| | |
| | CHAPTER 1 ADMINISTRATION |
| | 1.1* SCOPE. |
| | 1.1.1 SCOPE. THIS CODE SHALL APPLY TO MOTOR FUEL |
| | DISPENSING |
| | FACILITIES AND MOTOR FUEL DISPENSING AT FARMS AND |
| | ISOLATED CONSTRUCTION |
| | SITES. |
| | |
| | PLEASE REIVEW, ENSURE COMPLIANCE AND PROVIDE AN |
| | APPLICABLE NOTE; |
| | |
| | |
| | 2) THERE ARE INDICATIONS OF DIMENSIONS FOROM NEAREST |
| | BUILDINGS |
| | |
| | PER NFPA 30A |
| | |
| | 4.3.2* ABOVEGROUND STORAGE TANKS. EXCEPT AS MODIFIED BY |
| | THE |
| | PROVISIONS OF THIS SUBSECTION, ABOVEGROUND STORAGE |
| | TANKS SHALL |
| | MEET ALL APPLICABLE REQUIREMENTS OF CHAPTERS 21 AND 22 |
| | OF |
| | NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE. |
| | 4.3.2.1 THE USE OF ABOVEGROUND STORAGE TANKS AT MOTOR |
| | FUEL |
| | DISPENSING FACILITIES, FLEET VEHICLE MOTOR FUEL |
| | DISPENSING FACILITIES, |
| | AND MARINE MOTOR FUEL DISPENSING FACILITIES SHALL BE |
| | PERMITTED WHEN INSTALLED IN ACCORDANCE WITH THE |
| | REQUIREMENTS |
| | OF THIS SUBSECTION AND WITH ALL APPLICABLE REQUIREMENTS |
| | OF CHAPTERS 21, 22, AND 27 OF NFPA 30, FLAMMABLE AND |
| | COMBUSTIBLE LIQUIDS CODE, AND, FOR TANKS OTHER THAN |
| | TANKS IN |
| | VAULTS, WHEN THE SPECIFIC INSTALLATION HAS BEEN |
| | APPROVED BY |
| | THE AUTHORITY HAVING JURISDICTION. |
| | |
| | NFPA 30 |
| | |
| | 22.4* LOCATION OF ABOVEGROUND STORAGE TANKS. |
| | 22.4.1 LOCATION WITH RESPECT TO PROPERTY LINES, PUBLIC |
| | WAYS, |
| | AND IMPORTANT BUILDINGS. |
| | 22.4.1.1 TANKS STORING CLASS I, CLASS II, OR CLASS IIIA |
| | STABLE |
| | LIQUIDS WHOSE INTERNAL PRESSURE IS NOT PERMITTED TO |
| | EXCEED A |
| | GAUGE PRESSURE OF 2.5 PSI (17 KPA) SHALL BE LOCATED IN |
| | ACCORDANCE |
| | WITH TABLE 22.4.1.1(A) AND TABLE 22.4.1.1(B). WHERE |
| | TANK SPACING IS BASED ON A WEAK ROOF-TO-SHELL SEAM |
| | DESIGN, THE |
| | USER SHALL PRESENT EVIDENCE CERTIFYING SUCH |
| | CONSTRUCTION TO THE |
| | AUTHORITY HAVING JURISDICTION UPON REQUEST. |
| | |
| | PLEASE PROVIDE DIMENSIONS COMPLYING WITH THE MINIMUM |
| | DIEMSIONS. |
| | |
| | |
| | 3) THE INSTALLATION AND TESTING OF PIPING SHALL BE PER |
| | NFPA 30 CH 27 |
| | |
| | 27.3 GENERAL REQUIREMENTS. |
| | 27.3.1 PERFORMANCE STANDARDS. THE DESIGN, FABRICATION, |
| | ASSEMBLY, |
| | TEST, AND INSPECTION OF PIPING SYSTEMS SHALL BE |
| | SUITABLE |
| | FOR THE WORKING PRESSURES AND STRUCTURAL STRESSES TO BE |
| | ENCOUNTERED |
| | BY THE PIPING SYSTEM. COMPLIANCE WITH APPLICABLE |
| | SECTIONS |
| | OF ASME B31, CODE FOR PRESSURE PIPING, AND THE |
| | PROVISIONS |
| | OF THIS CHAPTER SHALL BE CONSIDERED PRIMA FACIE |
| | EVIDENCE OF COMPLIANCE |
| | WITH THE FOREGOING PROVISIONS. |
| | |
| | PLEASE REVIEW, ENSURE COMPLIANCE AND PROVIDE AN |
| | APPLICABLE NOTE. |
| | |
| | |
| | 4) THERE AR NO EQUIPMENT MANUFACTURE SPEC SHEETS NOR A |
| | TANK MANUFACTURE SPEC SHEET ATTACHED. |
| | |
| | PLEASE SUBMIT THE APPLICABLE EQUIPMENT SPEC SHEETS FOR |
| | THE PROPOSED PROJECT, |
| | |
| | |
| | |
| | 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | |
| | 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |
| | |