| Plan Review Stops For Permit 19110505 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2019-12-15 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-12-15 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-12-15 |
Time |
10:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2019-12-05 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-12-05 |
Time |
16:52 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-12-05 |
Time |
16:52 |
Sent To |
|
|
| Notes |
| 2019-12-05 16:54:43 | ***CORRECTIONS*** | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | 2ND BUILDING REVIEW DENIED: | | | | | | FBC B 107, ENGINEERING PLANS, SPECIFICATIONS, REPORTS | | | OR OTHER DOCUMENTS WHICH MUST BE SIGNED, DATED AND | | | SEALED IN ACCORDANCE WITH THE PROVISIONS OF SECTION | | | 471.025, F.S., AND RULE 61G15-23.001, F.A.C. MUST BE | | | PHYSICALLY SIGNED, DATED AND SEALED AS PROVIDED HEREIN | | | BY THE PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE. | | | (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE | | | LICENSEE?S SIGNATURE ON EACH PAGE REQUIRED TO BE | | | SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR | | | COPIED IMAGE OF THE LICENSEE?S SIGNATURE SHALL NOT BE | | | USED. | | | (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY | | | CREATED SEAL, OR AN EMBOSSING SEAL PLACED PERTIALLY | | | OVERLAPPING THE LICENSEE?S SIGNATURE ON EACH PAGE | | | REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL | | | NOT RENDER THE SIGNATURE ILLEGIBLE. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2019-12-02 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-12-02 |
Time |
09:00 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-12-02 |
Time |
09:00 |
Sent To |
|
|
| Notes |
| 2019-12-02 09:03:30 | ***CORRECTIONS*** | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | BUILDING REVIEW DENIED: | | | | | | FBC B 107.1/CITY OF WPB AMENDMENTS 107.1, TWO OR MORE | | | SETS OF DOCUMENTS NEED TO BE SUBMITTED (DESIGN | | | CALCULATIONS). |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2019-12-04 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-12-04 |
Time |
10:51 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-12-04 |
Time |
10:51 |
Sent To |
|
|
| Notes |
| 2019-12-04 10:53:13 | PUT BACK IN THE DENIED BIN UNDER "S" JLEAHY |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2019-12-03 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-12-03 |
Time |
11:53 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-12-03 |
Time |
11:28 |
Sent To |
|
|
| Notes |
| 2019-12-03 11:57:47 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | 1) VALUE OF PERMIT IS LOW FOR WORK PROPOSED, I LOOKED | | | OVER ALL YOUR APPLICATIONS AND THERE SEEMS TO BE A | | | LARGE AMOUNT OF WORK. MAKE SURE THAT YOU INCLUDE THE | | | COST OF THE MATERIALS AND SIGNS IN THE VALUE, YOU MAY | | | NOT BE SUPPLYING THE SIGNS BUT THEY ARE TO BE INCLUDED | | | IN THE COSTS. | | | | | | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS | | | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-12-15 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-12-15 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-12-09 |
Time |
15:34 |
Sent To |
|
|
| Notes |
| 2019-12-10 15:34:40 | RESUB ROUTED TO PVALENTI |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-12-05 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-12-05 |
Time |
16:54 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-12-04 |
Time |
14:35 |
Sent To |
|
|
| Notes |
| 2019-12-05 14:35:31 | RESUB ROUTED TO PVALENTI |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-12-03 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-12-03 |
Time |
12:23 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-11-12 |
Time |
13:19 |
Sent To |
|
|
| Notes |
| 2019-11-14 13:19:55 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2019-11-22 |
|
|
Cont ID |
|
| Sent By |
rfalcone |
Date |
2019-11-22 |
Time |
08:40 |
Rev Time |
0.00 |
| Received By |
rfalcone |
Date |
2019-11-22 |
Time |
08:40 |
Sent To |
B |
|
| Notes |
|
|