Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-12-10 Cont ID  
Sent By jleahy Date 2019-12-10 Time 09:06 Rev Time 0.00
Received By jleahy Date 2019-12-10 Time 09:05 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-11-15 Cont ID  
Sent By pleduc Date 2019-11-15 Time   Rev Time 0.00
Received By pleduc Date 2019-11-15 Time 16:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2019-12-13 Time   Rev Time 0.00
Received By lmarchan Date 2019-12-12 Time 13:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-12-10 Cont ID  
Sent By jleahy Date 2019-12-10 Time 09:06 Rev Time 0.00
Received By jleahy Date 2019-11-12 Time 10:57 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status P Date 2019-12-06 Cont ID  
Sent By shill Date 2019-12-06 Time 07:36 Rev Time 0.00
Received By shill Date 2019-12-06 Time 07:36 Sent To  
Notes
2020-03-25 14:48:213/25/20 IMPACT FEES PAID UNDER 19020380. LEM
2019-12-06 07:37:36IMPACT FEES UNDER BUILDING PERMIT 19020380 IS TO BE
 PAID PRIOR TO ISSUANCE.
 [email protected], 561-805-6724

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2019-12-13 Cont ID  
Sent By ccole Date 2019-12-13 Time 17:31 Rev Time 0.00
Received By ccole Date 2019-12-13 Time 17:31 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-12-06 Cont ID  
Sent By ccole Date 2019-12-06 Time 08:29 Rev Time 0.00
Received By ccole Date 2019-12-06 Time 07:30 Sent To  
Notes
2019-12-06 08:49:371ST REVIEW FBC-2017 MECHANICAL
 PERMIT #19110261
 12/6/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET C8: THERE IS NO TEXT FOR THE CIRCLED NUMBER
 NOTES ON THE PLAN. THERE IS A REFERENCE TO SHEET C8.1
 ON THE PLAN WHICH IS NOT INCLUDED WITH THE PLAN SETS-
 PLEASE PROVIDE THE SHEET AND THE CORELATING PLAN NOTES-
 SECTION 107.2.1 WPB.
  
 2) SUBMIT PRODUCT DATA SHEETS FOR THE TANKS, THE FUEL
 PIPING, AND THE DISPENSERS- SECTION 107.2.1 WPB.
  
 3) THE $275,000 COST FOR THE PROPOSED PROJECT APPEARS
 TO BE UNDERVALUED FOR THE SCOPE OF WORK. PLEASE PROVIDE
 COPIES OF SIGNED CONTRACTS, AND/OR ESTIMATES, INVOICES
 ETC. THAT INDICATE THE TOTAL COSTS OF THE PROJECT
 INCLUDING LABOR, MATERIALS, EQUIPMENT, SITE WORK,
 DESIGN FEES ETC. FOR ALL PHASES- BUILDING, MECHANICAL,
 ELECTRICAL, PLUMBING- SECTION 109.3 WPB.
  
 4) PLEASE PROVIDE STRUCTURAL DRAWINGS FOR CONSTRUCTION
 OF THE CONCRETE SLABS- SECTION 107.2.1 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2019-12-13 Cont ID  
Sent By shill Date 2019-12-13 Time 10:22 Rev Time 0.00
Received By shill Date 2019-12-13 Time 10:22 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2019-12-06 Cont ID  
Sent By shill Date 2019-12-06 Time 07:40 Rev Time 0.00
Received By shill Date 2019-12-06 Time 07:40 Sent To  
Notes
***NONE***