Plan Review Details - Permit 19110154
Plan Review Stops For Permit 19110154
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status N Date 2019-12-04 Cont ID  
Sent By skennedy Date 2019-12-04 Time 13:25 Rev Time 0.00
Received By skennedy Date 2019-12-04 Time 13:25 Sent To  
Notes
2019-12-04 13:26:35SUPPLIED GENERAC PAD MADE FOR THE SPECIFIC GENERATOR.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-11-08 Cont ID  
Sent By rmcdouga Date 2019-11-08 Time 17:31 Rev Time 0.00
Received By rmcdouga Date 2019-11-08 Time 17:31 Sent To  
Notes
2019-11-08 17:36:22PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE GENERATOR. FBC
 107.2.1
  
 2) SUBMIT TWO SETS OF GENERATOR PAD DETAILS AND
 GENERATOR TO PAD ANCHORING DETAILS. FBC-R301.2.1

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-12-04 Cont ID  
Sent By jleahy Date 2019-12-04 Time 13:16 Rev Time 0.00
Received By jleahy Date 2019-12-04 Time 13:16 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-12-04 Cont ID  
Sent By jleahy Date 2019-12-04 Time 07:54 Rev Time 0.00
Received By jleahy Date 2019-12-04 Time 07:54 Sent To  
Notes
2019-12-04 07:55:46FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) VALUE OF GENERATOR IS TO BE INCLUDED WITH THE VALUE
 OF THE PERMIT.

Review Stop G GAS REVIEW
Rev No 2 Status N Date 2019-12-04 Cont ID  
Sent By skennedy Date 2019-12-04 Time 13:24 Rev Time 0.00
Received By skennedy Date 2019-12-04 Time 13:24 Sent To  
Notes
2019-12-04 13:05:49SEE 19111077

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-11-20 Cont ID  
Sent By abelisle Date 2019-11-20 Time 08:12 Rev Time 0.00
Received By abelisle Date 2019-11-20 Time 07:21 Sent To  
Notes
2019-11-20 08:12:3911/20/2019 1ST PLUMBING REVIEW **DENIED** WITH COMMENTS
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS-STEEL TUBING (IF APPLICABLE) FOR
 EACH PIPE SIZE. WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 2) TYPE OF GAS (LP OR NATURAL). WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 3) SUBMIT TWO COPIES OF THE MANUFACTURER?S
 SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS
 INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE
 APPROVED FOR OUTDOOR INSTALLATION. 2017 FBC FUEL GAS
 SEC.410.1 OR 2017 FBC FUEL GAS RES. SEC. G2421.1.
  
 4) SUBMIT TWO SETS OF MANUFACTURE?S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE GENERATOR. FBC
 107.2.1
  
 5) THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON
 THE APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED
 CONTRACT. WPB AMENDMENTS TO THE FBC 109.3. BUILDING
 PERMITS VALUATIONS.
  
 6) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION
 & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 7) SUBMIT TWO COPIES OF THE SIZING TABLE USED IN THE
 DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS
 OF PLANS LISTING THE SIZING TABLES FROM GAS CODES OR
 ANOTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS
 SYSTEM 2017 FBC FUEL GAS SEC. 402.3 OR 2017 FBC FUEL
 GAS RES. SEC. G2413.3
  
  
 ATELYO BELISLE
 PLUMBING INSPECTOR /
 PLUMBING PLANS EXAMINER
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6695
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-12-04 Cont ID  
Sent By cpuell Date 2019-12-04 Time 15:04 Rev Time 0.00
Received By cpuell Date 2019-12-04 Time 13:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-12-04 Cont ID  
Sent By jleahy Date 2019-12-04 Time 07:54 Rev Time 0.00
Received By jleahy Date 2019-11-04 Time 09:52 Sent To  
Notes
2019-11-05 09:53:08ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2019-12-04 Cont ID  
Sent By rfalcone Date 2019-12-04 Time 14:00 Rev Time 0.00
Received By rfalcone Date 2019-12-04 Time 14:00 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2019-11-06 Cont ID  
Sent By rfalcone Date 2019-11-06 Time 11:06 Rev Time 0.00
Received By rfalcone Date 2019-11-06 Time 11:06 Sent To  
Notes
2019-11-06 11:08:3611/6/19 FAILED.
  
 PLEASE PROVIDE A SURVEY OF THE SUBJECT SITE AND
 ILLUSTRATE THE LOCATION OF THE PROPOSED GENERATOR.
 PURSUANT ZLDR SEC. 94-305(B)(4), MECHANICAL EQUIPMENT.
 MECHANICAL EQUIPMENT MAY NOT PROJECT MORE THAN FOUR
 FEET INTO A SETBACK.
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT HTTPS://WPB.ORG/DEPARTME
 NTS/DEVELOPMENT-SERVICES/OVERVIEW.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT
 TEL: (561) 822-1442
 E-MAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved