Plan Review Details - Permit 19110044
Plan Review Stops For Permit 19110044
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-11-21 Cont ID  
Sent By rmcdouga Date 2019-11-21 Time 10:35 Rev Time 0.00
Received By rmcdouga Date 2019-11-21 Time 10:35 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-11-07 Cont ID  
Sent By rmcdouga Date 2019-11-07 Time 18:31 Rev Time 0.00
Received By rmcdouga Date 2019-11-07 Time 18:27 Sent To I
Notes
2019-11-07 18:48:13PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE HANDRAIL EXTENSION AT THE BOTTOM OF THE STAIRS
 SHOWN IN DETAIL 1 ON SHEET A-3.0.2 DOES NOT COMPLY WITH
 THE CODE. THE DRAWING SHOWS A PORTION OF THE HANDRAIL
 EXTENSION THAT IS LEVEL. FBC ACCESSIBILTY SECTION
 505.10.3. AT THE BOTTOM OF A STAIR FLIGHT, HANDRAILS
 SHALL EXTEND AT THE SLOPE OF THE STAIR FLIGHT FOR A
 HORIZONTAL DISTANCE AT LEAST EQUAL TO ONE TREAD DEPTH
 BEYOND THE LAST RISER NOSING. EXTENSION SHALL RETURN TO
 A WALL, GUARD, OR THE LANDING SURFACE, OR SHALL BE
 CONTINUOUS TO THE HANDRAIL OF AN ADJACENT STAIR FLIGHT.
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-11-21 Cont ID  
Sent By lmarchan Date 2019-11-21 Time 15:49 Rev Time 0.00
Received By lmarchan Date 2019-11-14 Time 15:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-11-07 Cont ID  
Sent By rmcdouga Date 2019-11-07 Time 18:48 Rev Time 0.00
Received By rmcdouga Date 2019-11-07 Time 11:51 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2019-11-21 Cont ID  
Sent By rmcdouga Date 2019-11-21 Time 10:36 Rev Time 0.00
Received By rmcdouga Date 2019-11-21 Time 10:36 Sent To  
Notes
2019-11-21 10:39:01P.E. SIGNATURE IS NOT VALID IN ADOBE, BUT IS VALID IN
 PDF.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2019-11-07 Cont ID  
Sent By rmcdouga Date 2019-11-07 Time 18:27 Rev Time 0.00
Received By rmcdouga Date 2019-11-07 Time 18:27 Sent To  
Notes
2019-11-07 18:30:49THE ENGINEER'S DIGITAL SIGNATURE ON THE SHEETS S-1 AND
 S-2 ARE SHOWING THAT THEY ARE INVALID DUE TO ERRORS
 BUILDING THE PATH FROM THE SIGNER'S CERTIFICATE TO AN
 ISSUER CERTIFICATE.

Review Stop Z ZONING
Rev No 2 Status P Date 2019-11-21 Cont ID  
Sent By lmarchan Date 2019-11-21 Time 15:49 Rev Time 0.00
Received By lmarchan Date 2019-11-21 Time 15:49 Sent To  
Notes
2019-11-21 15:17:21LANDSCAPE PERMIT REQUIRED TO BE APPROVED AND ACCEPTED
 BEFORE CO

Review Stop Z ZONING
Rev No 1 Status P Date 2019-11-07 Cont ID  
Sent By hmtribou Date 2019-11-07 Time 14:10 Rev Time 0.00
Received By hmtribou Date 2019-11-07 Time 14:10 Sent To I
Notes
2019-11-07 14:13:18LANDSCAPE PERMIT REQUIRED TO BE SUBMITTED, APPROVED,
 INSPECTED AND COMPLETED TO MEET 94-453 BEFORE CO .
 PLEASE COORINDATE WITH FUTURE PLANS FOR ELIZABETH AVE.
 PLEASE CONTACT HEATHER DANFORTH 561-822-1562


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved