Plan Review Details - Permit 19101323
Plan Review Stops For Permit 19101323
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2019-10-31 Cont ID  
Sent By rrossano Date 2019-10-31 Time   Rev Time  
Received By rrossano Date 2019-10-31 Time   Sent To I
Notes
2019-10-31 07:10:35PASSED WITH PROVISOS:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT, INCLUDING A CITY OF WPB WATER METER
 IMMEDIATELY ADJACENT TO THE PROPOSED DRIVEWAY REPAIR.
 PER CHAPTER 556 OF THE FLORIDA STATE STATUTES, YOU MUST
 CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL BUSINESS
 DAYS IN ADVANCE OF ANY CONSTRUCTION OR DEMOLITION WORK.
 MORE INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX
 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 FAX:
 (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2019-10-30 Cont ID  
Sent By aborngra Date 2019-10-30 Time 15:38 Rev Time 0.00
Received By aborngra Date 2019-10-30 Time 15:35 Sent To ENG
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-31 Cont ID  
Sent By cpuell Date 2019-10-31 Time 09:34 Rev Time 0.00
Received By cpuell Date 2019-10-24 Time 13:33 Sent To  
Notes
2019-10-25 13:33:40ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2019-10-29 Cont ID  
Sent By rfalcone Date 2019-10-29 Time 13:22 Rev Time 0.00
Received By rfalcone Date 2019-10-29 Time 13:22 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved