Plan Review Details - Permit 19101275
| Plan Review Stops For Permit 19101275 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-11-20 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2019-11-20 |
Time |
16:16 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2019-11-19 |
Time |
14:13 |
Sent To |
|
|
| Notes |
| 2019-11-20 14:13:49 | RESUB ROUTED TO LCRESPO |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-11-12 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2019-11-12 |
Time |
18:50 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2019-11-08 |
Time |
16:07 |
Sent To |
|
|
| Notes |
| 2019-11-12 16:07:24 | RESUB ROUTED TO LCRESPO |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-10-28 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2019-10-28 |
Time |
07:32 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2019-10-24 |
Time |
13:41 |
Sent To |
|
|
| Notes |
| 2019-10-25 13:42:02 | ROUTED TO PLUMBING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2019-11-20 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2019-11-20 |
Time |
15:03 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2019-11-20 |
Time |
15:03 |
Sent To |
|
|
| Notes |
| 2019-11-20 15:03:54 | 11/20/19 REVIEWED FOR CODE COMPLIANCE (IRRIGATION) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING INSPECTOR / | | | PLUMBING PLAN REVIEW | | | AVAILABLE FROM 2:00 PM TO 5:00 PM | | | [email protected] | | | 561-701-6437 | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2019-11-12 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2019-11-12 |
Time |
18:49 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2019-11-12 |
Time |
18:49 |
Sent To |
|
|
| Notes |
| 2019-11-12 18:53:55 | 11/12/2019 2ND PLUMBING REVIEW **DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. THERE WAS ONLY ONE SET OF PLANS AND LETTER | | | SUBMITTED. PLEASE SEND SECOND SET, I HAVE APPROVED | | | FIRST SET AND AS SOON AS I GET SECOND SET I WILL | | | APRROVE IT. I WILL BE BACK IN MY OFFICE ON FRIDAY, FYI. | | | | | | LUIS A. CRESPO | | | PLUMBING INSPECTOR / | | | PLUMBING PLAN REVIEW | | | AVAILABLE FROM 1:00 PM TO 4:00 PM | | | [email protected] | | | 561-805-6720 | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2019-10-28 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2019-10-28 |
Time |
07:31 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2019-10-28 |
Time |
07:31 |
Sent To |
|
|
| Notes |
| 2019-10-28 07:31:56 | 10/28/2019 1ST PLUMBING REVIEW **DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. PLEASE NOTE ON LANDSCAPE PLANS A SHOW A PVB BACKFLOW | | | AND A REDUCED PRESSURE ZONE (RPZ) IS REQUIRED AT THE | | | WATER METER AND SHALL HAVE A SEPARATE PERMIT, | | | CERTIFICATION AND FINAL INSPECTION PER WEST PALM BEACH | | | CROSS CONNECTION MANUAL PER THE WPB A TO FBC SEC. | | | 107.2.1. | | | | | | 2. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED | | | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS | | | TO THE FBC SEC. 105.1. | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. | | | | | | LUIS A. CRESPO | | | PLUMBING INSPECTOR / | | | PLUMBING PLAN REVIEW | | | AVAILABLE FROM 1:00 PM TO 4:00 PM | | | [email protected] | | | 561-805-6720 | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |