Plan Review Details - Permit 19100780
Plan Review Stops For Permit 19100780
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-12-12 Cont ID  
Sent By rrossano Date 2019-12-12 Time   Rev Time 0.00
Received By rrossano Date 2019-12-12 Time   Sent To I
Notes
2019-12-12 09:08:00REVIEWED UNDER FORMAL ENGINEERING SUBMITTAL E18100021.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2019-10-24 Cont ID  
Sent By rrossano Date 2019-10-24 Time   Rev Time  
Received By rrossano Date 2019-10-24 Time   Sent To M
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-12-03 Cont ID  
Sent By pleduc Date 2019-12-03 Time   Rev Time 0.00
Received By pleduc Date 2019-12-03 Time 14:54 Sent To M
Notes
2019-12-03 15:12:27THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) THE INSTALLATION OF ALL UNDERGROUND FIRELINE SHALL
 BE DONE IN COMPLIANCE WITH THE REQUIREMENTS OF NFPA 24.
  
 PLEASE ENSURE COMPLIANCE.
  
  
 2) PROVIDE ALL EQUIPMENT SPEC SHEETS FOR INSPECTOR
 REVIEW AND INSPECTION.
  
 PLEASE ENSURE COMPLIANCE.
  
  
 3) DO NOT COVER OVER AND UNDERGROUND FIRELINE PRIOR TO
 FIRE INSPECTIONS.
  
 PLEASE ENSURE COMPLIANCE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-10-23 Cont ID  
Sent By pleduc Date 2019-10-23 Time   Rev Time 0.00
Received By pleduc Date 2019-10-21 Time 12:28 Sent To E
Notes
2019-10-23 14:18:47THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) THE INSTALLATION OF ALL UNDERGROUND FIRELINE SHALL
 BE DONE IN COMPLIANCE WITH THE REQUIREMENTS OF NFPA 24.
  
 PLEASE ENSURE COMPLIANCE.
  
  
 2) DO NOT COVER OVER AND UNDERGROUND FIRELINE PRIOR TO
 FIRE INSPECTIONS.
  
 PLEASE ENSURE COMPLIANCE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-12-11 Cont ID  
Sent By hmoser Date 2019-12-11 Time 10:26 Rev Time 0.00
Received By hmoser Date 2019-11-22 Time 14:06 Sent To  
Notes
2019-11-25 14:06:50RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2019-10-29 Time   Rev Time 0.00
Received By lmarchan Date 2019-10-15 Time 13:54 Sent To  
Notes
2019-10-16 13:54:57ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2019-12-11 Cont ID  
Sent By hmoser Date 2019-12-11 Time 10:25 Rev Time 0.00
Received By hmoser Date 2019-12-10 Time 10:42 Sent To ENG
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-10-29 Cont ID  
Sent By ccole Date 2019-10-29 Time 16:52 Rev Time 0.00
Received By ccole Date 2019-10-29 Time 16:52 Sent To  
Notes
2019-10-29 17:17:161ST REVIEW FBC-2017 MECHANICAL
 PERMIT #1910078
 10/29/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE ENGINEER OF RECORD SHALL PROVIDE ORIGINAL SEALS
 AND WET SIGNATURES ON THE FIRELINE PLANS- SECTION
 61G15-23.002 FAC. DIGITAL SIGNATURES AND SEALS ARE FOR
 ELECTRONIC PLAN SUBMITTALS- SECTION 61G15-23.005 FAC.
  
 2) PLEASE REMOVE ALL PLANS FROM THE SETS THAT ARE NOT
 NEEDED TO TO DEPICT THE SCOPE OF WORK ASSOCIATED WITH
 THE FIRELINE INSTALLATION- SECTION 107.2.1 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status N Date 2019-10-29 Cont ID  
Sent By ccole Date 2019-10-29 Time 17:17 Rev Time 0.00
Received By hmoser Date 2019-10-29 Time 17:17 Sent To  
Notes
***NONE***