Plan Review Details - Permit 19100636
Plan Review Stops For Permit 19100636
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-02-25 Cont ID  
Sent By jpearson Date 2020-02-25 Time 15:35 Rev Time 0.00
Received By jpearson Date 2020-02-25 Time 15:35 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-11-01 Cont ID  
Sent By jpearson Date 2019-11-01 Time 07:32 Rev Time 0.00
Received By jpearson Date 2019-11-01 Time 07:32 Sent To  
Notes
2019-11-01 07:32:08CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
 FAC = FLORIDA ADMINISTRATIVE CODE
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF
 PLAN IS REQUIRED TO BE SIGNED AND SEALED BY THE PERSON
 THAT DOES THE DESIGN. THIS RESPONSIBLE PERSON SHOULD BE
 EITHER A LICENSED DESIGN PROFESSIONAL, OR THE
 ELECTRICAL CONTRACTOR QUALIFIER. THIS PLAN HAS THE NAME
 OF A PROFESSIONAL ENGINEER, BUT IS NOT SIGNED AND
 SEALED BY THIS PERSON. A DIGITAL PLAN REQUIRES A
 DIGITAL SIGNATURE WITH THE PROPER THIRD PARTY
 VERIFICATION. PROVIDE CORRECTION. WPB FBC 107.1; FS
 471/481
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2020-02-25 Time   Rev Time 0.00
Received By lmarchan Date 2020-02-10 Time 14:28 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2019-11-01 Time   Rev Time 0.00
Received By lmarchan Date 2019-10-15 Time 16:43 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-02-25 Cont ID  
Sent By jpearson Date 2020-02-25 Time 15:35 Rev Time 0.00
Received By jpearson Date 2020-02-25 Time 15:35 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2019-11-01 Cont ID  
Sent By jpearson Date 2019-11-01 Time 07:32 Rev Time 0.00
Received By jpearson Date 2019-11-01 Time 07:32 Sent To  
Notes
2019-11-01 07:31:44PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN
 IS REQUIRED TO BE SIGNED AND SEALED BY THE PERSON THAT
 DOES THE DESIGN. THIS RESPONSIBLE PERSON SHOULD BE
 EITHER A LICENSED DESIGN PROFESSIONAL, OR THE
 ELECTRICAL CONTRACTOR QUALIFIER. THIS PLAN HAS THE NAME
 OF A PROFESSIONAL ENGINEER, BUT IS NOT SIGNED AND
 SEALED BY THIS PERSON. A DIGITAL PLAN REQUIRES A
 DIGITAL SIGNATURE WITH THE PROPER THIRD PARTY
 VERIFICATION. PROVIDE CORRECTION. WPB FBC 107.1; FS
 471/481
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved