Plan Review Details - Permit 19100279
Plan Review Stops For Permit 19100279
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-10-28 Cont ID  
Sent By dbattles Date 2019-10-28 Time 08:47 Rev Time 0.00
Received By dbattles Date 2019-10-28 Time 08:21 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-11-22 Cont ID  
Sent By jleahy Date 2019-11-22 Time 11:44 Rev Time 0.00
Received By jleahy Date 2019-11-22 Time 11:44 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2019-11-12 Cont ID  
Sent By jleahy Date 2019-11-12 Time 08:41 Rev Time 0.00
Received By jleahy Date 2019-11-12 Time 08:41 Sent To  
Notes
2019-11-12 08:46:17VALUE NEEDS TO BE ADDRESSED

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-10-21 Cont ID  
Sent By jleahy Date 2019-10-21 Time 11:06 Rev Time 0.00
Received By jleahy Date 2019-10-17 Time 15:50 Sent To  
Notes
2019-10-21 11:08:02 
 FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) VALUE OF WORK SHOWN IS LOW, SUBMIT A SIGNED CONTRACT
 .
  
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
  
  
 2) PLAN IS REQUIRED TO BE SIGNED AND SEALED BY A DESIGN
 PROFESSIONAL OR THE ELECTRICAL CONTRACTOR QUALIFIER. FS
 471.003(2)(H); 471.025; FBC 107.2.1

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-11-12 Cont ID  
Sent By jleahy Date 2019-11-12 Time 08:46 Rev Time 0.00
Received By jleahy Date 2019-11-04 Time 08:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-28 Cont ID  
Sent By dbattles Date 2019-10-28 Time 08:47 Rev Time 0.00
Received By dbattles Date 2019-10-09 Time 08:08 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2019-11-12 Cont ID  
Sent By jleahy Date 2019-11-12 Time 08:46 Rev Time 0.00
Received By jleahy Date 2019-11-12 Time 08:46 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2019-10-28 Cont ID  
Sent By dbattles Date 2019-10-28 Time 08:41 Rev Time 0.00
Received By dbattles Date 2019-10-28 Time 08:41 Sent To  
Notes
2019-10-21 11:11:07SIGNATURE FOR ELECTRICAL PAGES NOT GOOD.

Review Stop Z ZONING
Rev No 1 Status P Date 2019-10-15 Cont ID  
Sent By hmtribou Date 2019-10-15 Time 15:58 Rev Time 0.00
Received By hmtribou Date 2019-10-15 Time 15:58 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved