Plan Review Details - Permit 19100274
Plan Review Stops For Permit 19100274
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-12-11 Cont ID  
Sent By jleahy Date 2019-12-11 Time 07:36 Rev Time 0.00
Received By jleahy Date 2019-12-11 Time 07:36 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2019-11-26 Cont ID  
Sent By jleahy Date 2019-11-26 Time 14:08 Rev Time 0.00
Received By jleahy Date 2019-11-26 Time 14:08 Sent To  
Notes
2019-11-26 14:13:26FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 DEFERRAL FOR SUBMITALS IS OK.
  
 VALUE WILL NEED TO BE ADDRESSED BEFORE PERMIT IS
 ISSUED.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-10-21 Cont ID  
Sent By jleahy Date 2019-10-21 Time 08:03 Rev Time 0.00
Received By jleahy Date 2019-10-21 Time 08:03 Sent To  
Notes
2019-10-21 09:58:23FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) VALUE IS LOW FOR WORK SHOWN. PLEASE SUBMIT A SIGNED
 CONTRACT.
  
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2) SUBMIT CUT SHEETS FOR FIXTURES AND POLES.
  
 3) SUBMIT CUT SHEETS FOR CONTROLLER FOR SITE LIGHTS.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-11-26 Cont ID  
Sent By jleahy Date 2019-11-26 Time 14:14 Rev Time 0.00
Received By jleahy Date 2019-11-14 Time 11:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-21 Cont ID  
Sent By jleahy Date 2019-10-21 Time 11:05 Rev Time 0.00
Received By jleahy Date 2019-10-09 Time 08:07 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2019-11-26 Cont ID  
Sent By jleahy Date 2019-11-26 Time 14:14 Rev Time 0.00
Received By jleahy Date 2019-11-26 Time 14:14 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2019-10-21 Cont ID  
Sent By jleahy Date 2019-10-21 Time 11:05 Rev Time 0.00
Received By jleahy Date 2019-10-21 Time 11:05 Sent To  
Notes
2019-10-21 11:05:42PLAN IS REQUIRED TO BE SIGNED AND SEALED BY A DESIGN
 PROFESSIONAL OR THE ELECTRICAL CONTRACTOR QUALIFIER. FS
 471.003(2)(H); 471.025; FBC 107.2.1

Review Stop Z ZONING
Rev No 1 Status P Date 2019-10-17 Cont ID  
Sent By hdanfort Date 2019-10-17 Time 09:41 Rev Time 0.00
Received By hmtribou Date 2019-10-17 Time 09:41 Sent To  
Notes
***NONE***