Plan Review Details - Permit 19100156
Plan Review Stops For Permit 19100156
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-10-07 Cont ID  
Sent By rmcdouga Date 2019-10-07 Time 15:41 Rev Time 0.00
Received By rmcdouga Date 2019-10-07 Time 15:41 Sent To I
Notes
2019-10-07 15:44:19WINDOWS 1&2 AND 3&4 HAVE STRUCTURAL FRAMING MEMBERS
 BETWEEN THEM AND ARE NOT REQUIRED TO BE JOINED WITH A
 STRUCTURAL MULLION. VERIFY IN FIELD.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-10-03 Cont ID  
Sent By jbrooks Date 2019-10-03 Time 14:16 Rev Time 0.00
Received By jbrooks Date 2019-10-03 Time 14:16 Sent To HIST
Notes
2019-10-03 14:17:15JONATHAN BROOKS JR.
 BUILDING PLANS EXAMINER
 WORK HOURS TUESDAY & THURSDAY 7:00 AM TO 3:00 PM
 (561) 805-6716 ALTERNATE: CONTACT SAMANTHA HILL (561)
 805-6724
 [email protected]
  
 1ST REVIEW: FBC 2017 6TH EDITION
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC
 RESULTS: DENIED
 YOUR SUBMITTAL IS DEFICIENT FOR THE REASONS LISTED
 BELOW.
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
 YOU MAY RESUBMIT PRINTABLE DOCUMENTS ALONG WITH A
 COMPLETED RESUBMITTAL FORM, VIA EMAIL TO
 [email protected]. THE EMAIL SHOULD INCLUDE THE PERMIT
 NUMBER AND "RESUBMITTAL" IN THE SUBJECT LINE. THE
 RESUBMITTAL FORM CAN BE FOUND AT THIS WEBSITE:
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 1. FBC R 301 FAC9N-3. PROVIDE TWO SETS OF PRODUCT
 APPROVALS/NOA'S FOR THE PROPOSED MULLION BARS TO BE
 USED. MULLION BARS ARE REQUIRED BETWEEN WINDOWS 1&2 AND
 WINDOWS 3&4.
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2019-10-04 Cont ID  
Sent By aborngra Date 2019-10-04 Time 08:56 Rev Time 0.00
Received By aborngra Date 2019-10-04 Time 08:55 Sent To PC
Notes
2019-10-04 08:56:37RETROACTIVE APPROVAL FOR WINDOWS. NEW OCTAGON GABLE
 VENT AND TRIM BOARDS ARE BEING INSTALLED.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-10-07 Cont ID  
Sent By rmcdouga Date 2019-10-07 Time 15:44 Rev Time 0.00
Received By rmcdouga Date 2019-10-04 Time 14:29 Sent To  
Notes
2019-10-07 14:29:46RESUB ROUTED TO JBROOKS

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-04 Cont ID  
Sent By jbrooks Date 2019-10-04 Time 11:03 Rev Time  
Received By cpuell Date 2019-10-03 Time   Sent To  
Notes
2019-10-03 09:54:20SENT TO MISC 1 BLDG


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved