Plan Review Details - Permit 19091074
Plan Review Stops For Permit 19091074
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-10-11 Cont ID  
Sent By rmcdouga Date 2019-10-11 Time 06:54 Rev Time 0.00
Received By rmcdouga Date 2019-10-11 Time 06:45 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-10-08 Cont ID  
Sent By rmcdouga Date 2019-10-08 Time 15:53 Rev Time 0.00
Received By rmcdouga Date 2019-10-08 Time 15:25 Sent To E
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-10-09 Cont ID  
Sent By jleahy Date 2019-10-09 Time 08:27 Rev Time 0.00
Received By jleahy Date 2019-10-09 Time 08:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-10-11 Cont ID  
Sent By rmcdouga Date 2019-10-11 Time 06:54 Rev Time 0.00
Received By rmcdouga Date 2019-10-10 Time 14:21 Sent To  
Notes
2019-10-10 14:22:11RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-09 Cont ID  
Sent By jleahy Date 2019-10-09 Time 08:27 Rev Time 0.00
Received By jleahy Date 2019-09-26 Time 11:25 Sent To  
Notes
2019-09-27 11:25:22ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-10-11 Cont ID  
Sent By tklarge Date 2019-10-11 Time 06:28 Rev Time 0.00
Received By tklarge Date 2019-10-11 Time 06:10 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-10-04 Cont ID  
Sent By tklarge Date 2019-10-04 Time 08:23 Rev Time 0.00
Received By tklarge Date 2019-10-04 Time 06:38 Sent To  
Notes
2019-10-04 06:58:321) THE PUMP THAT IS CALLED OUT ON SHT.1 IN THE POOL
 EQUIPMENT SCHEDULE IS DIFFERENT THAN THE PUMP THAT IS
 CIRCLED ON THE SUBMITTED PUMP SPECIFICATIONS. CLARIFY.
 2) SHT. 3 OF 5 - THE TOTAL DYNAMIC HEAD SECTION ON THIS
 SHEET IS ILLEGIBLE AND UNACCEPTABLE. SUBMIT A SEPARATE
 SHEET WITH THIS INFORMATION IN A CLEAR AND LEGIBLE
 FORMAT. IN ADDITION, THE TWO PUMP CURVES AND PRINTING
 ARE BLURRED AND ILLEGIBLE. WPB AMEND. TO FBC SEC.
 107.2.1. I HAVE BROUGHT THIS TO THE CONTRACTOR'S
 ATTENTION PREVIOUSLY AND EXPLAINED THAT THIS SHEET IS
 UNACCEPTABLE AND WILL BE REJECTED IF IT SUBMITTED.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2019-10-01 Cont ID  
Sent By rfalcone Date 2019-10-01 Time 16:27 Rev Time 0.00
Received By rfalcone Date 2019-10-01 Time 16:27 Sent To  
Notes
***NONE***