Plan Review Details - Permit 19090965
Plan Review Stops For Permit 19090965
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-11-21 Cont ID  
Sent By rrossano Date 2019-11-21 Time   Rev Time 0.00
Received By rrossano Date 2019-11-21 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-10-09 Cont ID  
Sent By rrossano Date 2019-10-09 Time   Rev Time  
Received By rrossano Date 2019-10-09 Time   Sent To I
Notes
2019-10-09 13:48:46PLEASE ADDRESS FIRE & MECHANICAL COMMENTS.

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-11-16 Cont ID  
Sent By bwoods Date 2019-11-16 Time   Rev Time 0.00
Received By bwoods Date 2019-11-11 Time   Sent To M
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-10-04 Cont ID  
Sent By bwoods Date 2019-10-04 Time   Rev Time  
Received By bwoods Date 2019-10-04 Time   Sent To M
Notes
2019-10-04 10:59:35PERMIT # 19090965
 REVIEW COMMENTS - FIRE DEPARTMENT
  
 1. CLARIFICATION ON THE INSTALLATION ON THE SPECIFIC
 PIPE SIZE THE PLANS INDICATES 2 1/2 " BUT THE PERMIT
 APPLICATION INDICATES 3"
 2. SUPPORTING DOCUMENTS TO SUPPORT THE WATER SUPPLY
 DEMANDS FOR THE DESIGNED UNDERGROUND PIPING SIZE
 3. THE WORKING PLAN SUBMITTAL SHALL INCLUDE THE
 MANUFACTURER?S INSTALLATION INSTRUCTIONS FOR ANY
 SPECIALLY LISTED EQUIPMENT, INCLUDING DESCRIPTIONS,
 APPLICATIONS, AND LIMITATIONS FOR ANY DEVICES, PIPING,
 OR FITTINGS.
  
  
 BRITTANY WOODS
 FIRE INVESTIGATOR & INSPECTOR
 OFFICE OF THE FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 [email protected]
 (561) 804-4754
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-11-21 Cont ID  
Sent By cpuell Date 2019-11-21 Time 10:48 Rev Time 0.00
Received By cpuell Date 2019-11-08 Time 15:51 Sent To  
Notes
2019-11-12 15:52:00RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-09 Cont ID  
Sent By cpuell Date 2019-10-09 Time 16:00 Rev Time 0.00
Received By cpuell Date 2019-09-24 Time 13:02 Sent To  
Notes
2019-09-25 13:02:21ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2019-11-20 Cont ID  
Sent By ccole Date 2019-11-20 Time 16:50 Rev Time 0.00
Received By ccole Date 2019-11-20 Time 15:47 Sent To ENG
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-10-08 Cont ID  
Sent By ccole Date 2019-10-08 Time 09:03 Rev Time 0.00
Received By ccole Date 2019-10-08 Time 08:25 Sent To ENG
Notes
2019-10-08 09:12:14 
 1ST REVIEW FBC-2017 MECHANICAL
 PERMIT #19090965
 10/8/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) INDICATE HOW THE UNDERGROUND PIPE AND FITTINGS WILL
 BE RESTRAINED AGAINST MOVEMENT. PROVIDE MATERIAL DATA
 SHEETS FOR THE DUCTILE PIPE AND ALL COMPONENTS OF THE
 SYSTEM- SECTION 107.2.1 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved