Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-12-20 Cont ID  
Sent By rmcdouga Date 2019-12-20 Time 14:17 Rev Time 0.00
Received By rmcdouga Date 2019-12-20 Time 14:17 Sent To  
Notes
2019-12-20 14:50:31DIGITALLY SIGNED PLANS WERE SUBMITTED BY EMAIL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-12-19 Cont ID  
Sent By rmcdouga Date 2019-12-19 Time 15:29 Rev Time 0.00
Received By rmcdouga Date 2019-12-19 Time 15:29 Sent To I
Notes
2019-12-19 15:35:44PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) FIRST COMMENT WAS NOT ADDRESSED. THE GENERATOR PAD
 DETAILS THAT WERE SUBMITTED DO NOT HAVE THE ENGINEER'S
 ORIGINAL SIGNATURE AS REQUIRED BY SECTION 471.025,
 F.S., AND RULE 61G15-23.001, F.A.C. SUBMIT TWO SETS OF
 GENERATOR PAD AND GENERATOR TO PAD ANCHORING DETAILS.
 PRE-FABRICATED PADS REQUIRE SIGNED AND SEALED
 ENGINEERING. FBC 107.2.1

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-10-08 Cont ID  
Sent By rmcdouga Date 2019-10-08 Time 17:34 Rev Time 0.00
Received By rmcdouga Date 2019-10-08 Time 17:34 Sent To I
Notes
2019-10-08 17:40:46PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF GENERATOR PAD AND GENERATOR TO
 PAD ANCHORING DETAILS. PRE-FABRICATED PADS REQUIRE
 SIGNED AND SEALED ENGINEERING. FBC 107.2.1

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2020-01-09 Cont ID  
Sent By jleahy Date 2020-01-09 Time 10:49 Rev Time 0.00
Received By jleahy Date 2020-01-09 Time 10:49 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2019-12-23 Cont ID  
Sent By jleahy Date 2019-12-23 Time 13:44 Rev Time 0.00
Received By jleahy Date 2019-12-23 Time 13:44 Sent To  
Notes
2019-12-23 13:46:37FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) VALUE OF WORK LOW PLEASE SUBMIT A SIGNED CONTRAC FOR
 THE WORK INVOLVED SHOWING TOTAL PRICE OF INSTALLATION.
  
 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF
 THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF
 BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS,
 MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE
 UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE
 DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED,
 QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS
 (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE
 BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION
 OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT
 VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING,
 MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK,
 ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-10-03 Cont ID  
Sent By jleahy Date 2019-10-03 Time 10:40 Rev Time 0.00
Received By jleahy Date 2019-10-03 Time 10:40 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2019-10-04 Cont ID  
Sent By lcrespo Date 2019-10-04 Time 06:36 Rev Time 0.00
Received By lcrespo Date 2019-10-04 Time 06:36 Sent To  
Notes
2019-10-04 06:37:51GAS REVIEW DONE UNDER PERMIT 19090705 AND IT'S HAS
 PASSED.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-12-19 Cont ID  
Sent By rmcdouga Date 2019-12-19 Time 15:35 Rev Time 0.00
Received By rmcdouga Date 2019-12-18 Time 14:32 Sent To  
Notes
2019-12-19 14:32:33RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-08 Cont ID  
Sent By rmcdouga Date 2019-10-08 Time 17:34 Rev Time 0.00
Received By rmcdouga Date 2019-09-25 Time 12:56 Sent To  
Notes
2019-09-26 12:56:58ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2019-09-27 Cont ID  
Sent By rfalcone Date 2019-09-27 Time 13:40 Rev Time 0.00
Received By rfalcone Date 2019-09-27 Time 13:40 Sent To  
Notes
***NONE***