Plan Review Details - Permit 19090515
Plan Review Stops For Permit 19090515
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-01-02 Cont ID  
Sent By rmcdouga Date 2020-01-02 Time 09:07 Rev Time 0.00
Received By rmcdouga Date 2020-01-02 Time 09:07 Sent To M
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-12-11 Cont ID  
Sent By rmcdouga Date 2019-12-11 Time 17:49 Rev Time 0.00
Received By rmcdouga Date 2019-12-11 Time 08:23 Sent To I
Notes
2019-12-11 18:13:35PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
  
 1) IF YOU DO NOT WISH TO APPLY FOR A SEPARATE PERMIT AS
 NOTED ON SHEET S-2 OF THE APPROVED PLANS, YOU HAVE TWO
 OTHER OPTIONS THAT ARE ACCEPTABLE. NUMBER ONE IS TO
 REVISE SHEET S-2 AND REMOVE THE NOTE AND CORRECT THE
 DIMENSIONS. NUMBER TWO IS TO PROVIDE A SIGNED AND
 SEALED LETTER FROM THE ENGINEER OF RECORD THAT SIGNED
 SHEET S-2, WHICH STATES THAT THE CHILLER SUPPORT SHOWN
 ON SHEET S-2 IS INCLUDED UNDER PERMIT #17121030 AND THE
 DIMENSIONS ARE REVISED AS SHOWN IN THE STRUCTURAL
 CALCULATION DOCUMENTS. ON SHEET S-2 OF THE APPROVED
 PLANS THERE ARE NOTES THAT INDICATE THE CHILLER SUPPORT
 WILL BE UNDER A SEPARATE PERMIT. THEREFORE, THESE
 DOCUMENTS ARE REQUIRED TO BE SUBMITTED AS A SEPARATE
 PERMIT. THIS SUBMITTAL NUMBER CAN BE CHANGED TO A
 PERMIT NUMBER. YOU WILL NEED TO HAVE THE CONTRACTOR
 THAT IS INSTALLING THE CHILLER STAND FILL OUT A PERMIT
 APPLICATION AND SUBMIT IT WITH THE OTHER DOCUMENTS. FBC
 105.1
  
 2) COMPLIED.
  
 3) SINCE BOTH THE 2014 AND 2017 EDITIONS OF THE FBC
 REFERENCE ASCE 7 - 10 FOR STRUCTURAL DESIGN, THE 2017
 FBC IS ACCEPTABLE. THE PROJECT ASSOCIATED WITH THIS
 PERMIT WAS PERMITTED UNDER THE 2014 FBC FIFTH EDITION.
 THEREFORE, TO RETAIN CONSISTENCY THE DOCUMENTS FOR THIS
 PERMIT SHOULD USE THE SAME DESIGN CRITERIA. FBC 107.2.1
  
 4) SEE COMMENT NUMBER 1. THE NOTES ON SHEET S-2 OF THE
 APPROVED PLANS SPECIFY THAT THE CHILLER WILL BE MOUNTED
 ON A 4'-2" X 6'-3" WALL MOUNTED METAL PLATFORM 7'-6"
 AFF AND A WIND PRESSURE OF 96 PSF (ASD). THE
 ENGINEERING DRAWINGS ARE IN CONFLICT WITH THIS
 INFORMATION. THE APPROVED PLANS OR PROPOSED ENGINEERING
 WILL HAVE TO BE REVISED TO CORRECT THE DIFFERENCES AND
 REFLECT ACTUAL LOCATION OF THE PLAT FORM STAND. FBC
 107.2.1
  
 5) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A
 RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE
 CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-09-17 Cont ID  
Sent By rmcdouga Date 2019-09-17 Time 15:43 Rev Time 0.00
Received By rmcdouga Date 2019-09-17 Time 14:37 Sent To M
Notes
2019-09-17 15:43:44PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
  
 1) SHEET S-2 OF THE APPROVED PLANS THERE ARE NOTES THAT
 INDICATE THE CHILLER SUPPORT WILL BE UNDER A SEPARATE
 PERMIT. THEREFORE, THESE DOCUMENTS ARE REQUIRED TO BE
 SUBMITTED AS A SEPARATE PERMIT. THIS SUBMITTAL NUMBER
 CAN BE CHANGED TO A PERMIT NUMBER. YOU WILL NEED TO
 HAVE THE CONTRACTOR THAT IS INSTALLING THE CHILLER
 STAND FILL OUT A PERMIT APPLICATION AND SUBMIT IT WITH
 THE OTHER DOCUMENTS. FBC 105.1
  
 2) THE ENGINEERED DOCUMENTS THAT WERE SUBMITTED ARE
 SIGNED AND SEALED BY AN ARCHITECT. AN ARCHITECT IS ONLY
 ALLOWED TO SIGN AND SEAL ENGINEERING THAT IS INCIDENTAL
 TO THEIR ARCHITECTURAL PRACTICE.
 ARCHITECTS
 SEC. 481.229 (4)?NOTWITHSTANDING THE PROVISIONS OF THIS
 PART OR OF ANY OTHER LAW, NO REGISTERED ENGINEER WHOSE
 PRINCIPAL PRACTICE IS CIVIL OR STRUCTURAL ENGINEERING,
 OR EMPLOYEE OR SUBORDINATE UNDER THE RESPONSIBLE
 SUPERVISION OR CONTROL OF THE ENGINEER, IS PRECLUDED
 FROM PERFORMING ARCHITECTURAL SERVICES WHICH ARE PURELY
 INCIDENTAL TO HIS OR HER ENGINEERING PRACTICE, NOR IS
 ANY REGISTERED ARCHITECT, OR EMPLOYEE OR SUBORDINATE
 UNDER THE RESPONSIBLE SUPERVISION OR CONTROL OF SUCH
 ARCHITECT, PRECLUDED FROM PERFORMING ENGINEERING
 SERVICES WHICH ARE PURELY INCIDENTAL TO HIS OR HER
 ARCHITECTURAL PRACTICE. HOWEVER, NO ENGINEER SHALL
 PRACTICE ARCHITECTURE OR USE THE DESIGNATION
 ?ARCHITECT? OR ANY TERM DERIVED THEREFROM, AND NO
 ARCHITECT SHALL PRACTICE ENGINEERING OR USE THE
 DESIGNATION ?ENGINEER? OR ANY TERM DERIVED THEREFROM.
  
 3) THE PROJECT ASSOCIATED WITH THIS PERMIT WAS
 PERMITTED UNDER THE 2014 FBC FIFTH EDITION. THEREFORE,
 TO RETAIN CONSISTENCY THE DOCUMENTS FOR THIS PERMIT
 SHOULD USE THE SAME DESIGN CRITERIA. FBC 107.2.1
  
 4) THE NOTES ON SHEET S-2 OF THE APPROVED PLANS SPECIFY
 THAT THE CHILLER WILL BE MOUNTED ON A 4'-2" X 6'-3"
 WALL MOUNTED METAL PLATFORM 7'-6" AFF AND A WIND
 PRESSURE OF 96 PSF (ASD). THE ENGINEERING DRAWINGS ARE
 IN CONFLICT WITH THIS INFORMATION. THE APPROVED PLANS
 OR PROPOSED ENGINEERING WILL HAVE TO BE REVISED TO
 CORRECT THE DIFFERENCES AND REFLECT ACTUAL LOCATION OF
 THE PLAT FORM STAND. FBC 107.2.1
  
 5) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A
 RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE
 CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
  
  
  
  
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-01-02 Cont ID  
Sent By hmoser Date 2020-01-02 Time 13:39 Rev Time 0.00
Received By hmoser Date 2019-12-19 Time 13:39 Sent To  
Notes
2019-12-20 13:39:20ROUTED TO HMOSER

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-12-11 Cont ID  
Sent By rmcdouga Date 2019-12-11 Time 18:13 Rev Time 0.00
Received By rmcdouga Date 2019-12-06 Time 14:40 Sent To  
Notes
2019-12-09 14:41:04RESUB ROUTED TO HMOSER

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-09-19 Cont ID  
Sent By hmoser Date 2019-09-19 Time 14:11 Rev Time 0.00
Received By hmoser Date 2019-09-13 Time 14:50 Sent To  
Notes
2019-09-16 14:51:02SUBMITTAL ROUTED TO RMCDOUGAL

Review Stop M MECHANICAL (A/C)
Rev No 3 Status N Date 2020-01-02 Cont ID  
Sent By hmoser Date 2020-01-02 Time 13:37 Rev Time 0.00
Received By hmoser Date 2020-01-02 Time 13:37 Sent To I
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2019-12-10 Cont ID  
Sent By hmoser Date 2019-12-10 Time 10:06 Rev Time 0.00
Received By hmoser Date 2019-12-10 Time 10:00 Sent To B
Notes
2019-12-10 10:07:45PLAN DENIED
 NO MECHANICAL PLAN SUBMITTED. HM.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-09-19 Cont ID  
Sent By hmoser Date 2019-09-19 Time 14:11 Rev Time 0.00
Received By hmoser Date 2019-09-19 Time 13:47 Sent To I
Notes
2019-09-19 14:11:27PLAN DENIED
 1) REFER TO SECTION 301.15 WIND RESISTANCE 2107 FBC (M)
 2) REFER TO SECTION 304.11 GUARDS 2017 FBC (M)
 3) REFER TO SECTION 306.5 EQUIPMENT AND APPLIANCES
 ON ROOFS OR ELEVATED STRUCTURES.
  
 PLAN REVIEW BY HAROLD MOSER
 [email protected]
 OFFICE 561-805-6732
 FAX 561-805-6676


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved