Plan Review Stops For Permit 19090079
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-11-06 Cont ID  
Sent By rmcdouga Date 2019-11-06 Time 11:35 Rev Time 0.00
Received By rmcdouga Date 2019-11-06 Time 11:20 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-10-08 Cont ID  
Sent By pleduc Date 2019-10-04 Time 12:15 Rev Time 0.00
Received By rmcdouga Date 2019-10-08 Time 11:26 Sent To E
Notes
2019-10-08 11:27:39PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) COMMENT WAS NOT ADDRESSED. SUBMIT TWO SETS OF
 GENERATOR PAD DETAILS AND GENERATOR TO PAD ANCHORING
 DETAILS. FBC 107.2.1

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-09-11 Cont ID  
Sent By rmcdouga Date 2019-09-11 Time 18:00 Rev Time 0.00
Received By rmcdouga Date 2019-09-11 Time 18:00 Sent To  
Notes
2019-09-11 18:02:58PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF GENERATOR PAD DETAILS AND
 GENERATOR TO PAD ANCHORING DETAILS. FBC 107.2.1

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-11-05 Cont ID  
Sent By jleahy Date 2019-11-05 Time 16:44 Rev Time 0.00
Received By jleahy Date 2019-11-05 Time 16:44 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-10-08 Cont ID  
Sent By jleahy Date 2019-10-08 Time 14:52 Rev Time 0.00
Received By jleahy Date 2019-10-08 Time 14:52 Sent To G
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-09-19 Cont ID  
Sent By jleahy Date 2019-09-19 Time 09:36 Rev Time 0.00
Received By jleahy Date 2019-09-19 Time 09:36 Sent To FIRE
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2019-10-31 Cont ID  
Sent By pleduc Date 2019-10-31 Time 1 Rev Time 0.00
Received By pleduc Date 2019-10-31 Time 12:01 Sent To E
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 2019-10-04 Cont ID  
Sent By pleduc Date 2019-10-04 Time   Rev Time 0.00
Received By pleduc Date 2019-10-04 Time 11:54 Sent To B
Notes
2019-10-04 12:00:52THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) COMPLIED
  
  
  
 2) NOT COMPLIED
  
 THERE ARE NO INDICATIONS OF COMPLAINCE WITH ANY NFPA
 CODES.
  
 THE PROPOSED PROJECT SHALL COMPLY WITH, THE FLORIDA
 FIRE PREVENTION CODES AND ALL OTHER APPLICABLE CODES
 INCLUDING BUT NOT LOMITED TO:
  
 NFPA 110, NFPA 110, STANDARD FOR EMERGENCY AND STANDBY
 POWER SYSTEMS, 2013 EDITION.
 NFPA 37, STANDARD FOR THE INSTALLATION AND USE OF
 STATIONARY
 COMBUSTION ENGINES AND GAS TURBINES, 2015 EDITION.
 NFPA 58, LIQUEFIED PETROLEUM GAS CODE, 2014 EDITION.
  
  
  
 3) NOT COMPLIED - NO DIMENSIONS ARE PROVIDED FROM THE
 PROPERTY LINE.
  
 THERE ARE NO INDICATIONS OF THE LP FUEL SUPPLY LOCATION
 AND OR SIZE ON THE PLAN SHEETS.
  
 PLEASE PROVIDE DETAILS, INCLUDING NEAREST BUILDINGS,
 PROPERTY LINES AND VEHICLE DRIVE PATHS
  
  
  
  
 3A) NEW COMMENT - A LP TANK IS INDICATED.
  
 IS THIS AN UNDERGROUND OR ABOVEGROUND TANK.
  
 PLEASE PROVIDE DETAILS.
  
  
  
  
 4) NOT COMPLIED - NO DIMENSIONS ARE PROVIDED
  
 FOR EXHAUST MIGRATION REVIEW, PLEASE PROVIDE THE
 DIMENSIONS AND LOCATIONS OF WINDOWS, DOORS, SOFFITS OR
 AIR INTAKE EQUIPMENT.
  
  
  
 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-09-19 Cont ID  
Sent By pleduc Date 2019-09-19 Time   Rev Time 0.00
Received By pleduc Date 2019-09-19 Time 11:29 Sent To I
Notes
2019-09-19 11:41:10THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THE SUBMITTED PLANS ARE TOO SMALL AND NOT LEGIBLE.
 PER NFPA 1
  
 1.7.11 PLANS AND SPECIFICATIONS.
  
 1.7.11.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE
 PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH
 APPLICABLE CODES AND STANDARDS.
  
 PLEASE PROVIDE LARGER STANDARDIZED PLAN SETS.
  
  
  
 2) THERE ARE NO INDICATIONS OF COMPLAINCE WITH ANY NFPA
 CODES.
  
 THE PROPOSED PROJECT SHALL COMPLY WITH, THE FLORIDA
 FIRE PREVENTION CODES AND ALL OTHER APPLICABLE CODES
 INCLUDING BUT NOT LOMITED TO:
  
 NFPA 110, NFPA 110, STANDARD FOR EMERGENCY AND STANDBY
 POWER SYSTEMS, 2013 EDITION.
 NFPA 37, STANDARD FOR THE INSTALLATION AND USE OF
 STATIONARY
 COMBUSTION ENGINES AND GAS TURBINES, 2015 EDITION.
 NFPA 58, LIQUEFIED PETROLEUM GAS CODE, 2014 EDITION.
  
  
 3) THERE ARE NO INDICATIONS OF THE LP FUEL SUPPLY
 LOCATION AND OR SIZE ON THE PLAN SHEETS.
  
 PLEASE PROVIDE DETAILS, INCLUDING NEAREST BUILDINGS,
 PROPERTY LINES AND VEHICLE DRIVE PATHS.
  
  
  
 4) FOR EXHAUST MIGRATION REVIEW, PLEASE PROVIDE THE
 DIMENSIONS AND LOCATIONS OF WINDOWS, DOORS, SOFFITS OR
 AIR INTAKE EQUIPMENT.
  
  
  
 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status N Date 2019-10-08 Cont ID  
Sent By lcrespo Date 2019-10-08 Time 19:03 Rev Time 0.00
Received By lcrespo Date 2019-10-08 Time 19:03 Sent To  
Notes
2019-10-08 19:04:06GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-09-16 Cont ID  
Sent By lcrespo Date 2019-09-16 Time 17:42 Rev Time 0.00
Received By lcrespo Date 2019-09-16 Time 17:00 Sent To  
Notes
2019-09-16 18:17:0209/16/2019 1ST GAS/LP/TANK REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. A SUB PLUMBING PERMIT (GAS) LP BY A LICENSED
 CONTRACTOR IS REQUIRED FOR THE SCOPE OF WORK PER THE
 WPB AMENDMENTS TO THE FBC SEC. 105.1
 2. GAS RISER DIAGRAM REQUIRED PER THE WPB AMENDMENTS TO
 THE FBC SEC. 107.5.1.5 (9) COMMERCIAL GAS
 3. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE AND TYPE OF PIPE PER
 2017 FBC FG SECS. 402.4.1, 402.4.2.
 4. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2017 FBC FG SEC. 402.2.
 5. PLEASE SHOW SHUTOFF VALVES, UNIONS, DRIP LEGS, BTU
 AND REGULATORS ON ISOMETRIC PER THE 2017 FBC FG SEC.
 409.4.
 6. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1? OF
 EITHER SIDE PER THE 2017 FBC FG SEC 410.2.
 7. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER THE 2017 FBC
 FG SEC. 402.4.1.
 8. PLAN ARE TOO SMALL TO READ NOTES, PLANS SHALL BE
 DRAWN TO A MINIMUM 1/8 INCH SCALE ON E.01 PER THE WPB
 AMENDMENT TO FBC SEC. 107.2.1.3 QUALITY OF BUILDING
 PLANS.
 9. SUBMIT TWO COPIES OF THE SIZING TABLE USED IN THE
 DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS
 OF PLANS LISTING THE SIZING TABLES FROM GAS CODES OR
 ANOTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS
 SYSTEM PER THE 2017 FBC FG SEC. 402.
 10. IF A REGULATOR IS REQUIRED SUBMIT MANUFACTURER?S
 SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS
 INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE
 APPROVED FOR OUTDOOR INSTALLATION PER THE 2017 FBC FG
 SEC. 410.1.
 11. CLEARLY, INDICATE ON THE PLAN IF THE LP TANK IS
 ABOVE GROUND OR BELOW GROUND, AND SHOW THE METHOD OF
 REQUIRED PROTECTION FOR THE LP TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK IS BELOW GROUND IT SHALL BE
 ANCHORED PER NFPA 58 SEC.3-2.2.7 (H). IF ABOVE GROUND,
 THE TANK SHALL BE SECURELY ANCHORED TO WITHSTAND 170
 MPH ULT WIND LOAD PER THE FLORIDA BUILDING CODE. WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
 12. SHOW THE DEPTH OF THE LP GAS CONTAINER IF BELOW
 GRADE. COMPLY WITH NFPA 58 SEC. 6.6.6.1.
 13. FOR A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED
 PER NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE
 MONITORED PER NFPA 58 SEC.6.6.6.1 (J). SUBMIT DETAILS
 ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS.) & A
 NUMBER OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE CABLE
 AND AMOUNT OF WATER TO ACTIVATE IT.
 14. IF AN UNDERGROUND UNIT CLEARLY INDICATE ON TIE-DOWN
 SHEET IF THE LP TANK TIE-DOWN METHOD AND IF YOU ARE
 USING STRAPS OR CABLE, IF CABLE HOW IS IT PROTECTED FOR
 THE LP TANK AND APPURTENANCES PER NFPA 58. WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
 15. PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR
 THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO
 BE INSTALLED TO PREVENT FLOTATION. NFPA 58 SEC.
 6.6.1.6.
 16. THE TANK SHALL BE A MIN OF 10' FROM ANY SOURCE OF
 IGNITION ACCORDING TO NFPA TABLE 6.3.4.3 SEPARATION
 DISTANCE BETWEEN CONTAINER PRESSURE RELIEF VALVE AND
 BUILDING OPENINGS.
 17. SHOW THE DISTANCE OF THE LP TANK FROM THE EXTERIOR
 WALL OF THE STRUCTURE TO THE CONTAINER SURFACE AND ALSO
 FROM THE PROPERTY LINE TO THE CONTAINER SURFACE. COMPLY
 WITH NFPA 58-11 SEC. 6.3.1 & TABLE 6.3.1.
 18. SHOW THE CAPACITY AND LOCATION OF THE LP TANK ON
 THE PLANS AND SHOW THE TYPE OF TANK (HORIZONTAL ASME OR
 VERTICAL ASME). WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-11-06 Cont ID  
Sent By rmcdouga Date 2019-11-06 Time 11:35 Rev Time 0.00
Received By rmcdouga Date 2019-10-28 Time 14:54 Sent To  
Notes
2019-10-29 14:55:08RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-10-08 Cont ID  
Sent By lcrespo Date 2019-10-08 Time 19:04 Rev Time 0.00
Received By lcrespo Date 2019-10-02 Time 12:23 Sent To  
Notes
2019-10-03 12:23:45RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-09-19 Cont ID  
Sent By lmarchan Date 2019-09-19 Time 13:51 Rev Time 0.00
Received By lmarchan Date 2019-09-05 Time 11:25 Sent To  
Notes
2019-09-06 11:26:03ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 3 Status P Date 2019-10-30 Cont ID  
Sent By rfalcone Date 2019-10-30 Time 09:56 Rev Time 0.00
Received By rfalcone Date 2019-10-30 Time 09:56 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2019-10-03 Cont ID  
Sent By rfalcone Date 2019-10-03 Time 14:51 Rev Time 0.00
Received By rfalcone Date 2019-10-03 Time 14:51 Sent To FIRE
Notes
2019-10-03 14:54:5010/3/19 FAILED.
  
 PLEASE PROVIDE THE SETBACK OF THE PROPOSED EQUIPMENT.
  
 ********
  
 09/06/19 FAILED.
  
 PURSUANT ZLDR SEC. 94-305(B)(4), MECHANICAL EQUIPMENT.
 MECHANICAL EQUIPMENT MAY NOT PROJECT MORE THAN FOUR
 FEET INTO A SETBACK. WINDOW AIR-CONDITIONING UNITS MAY
 NOT PROJECT MORE THAN 18 INCHES INTO A REQUIRED SIDE
 SETBACK. PLEASE PROVIDE A SURVEY OF THE SUBJECT SITE.
 THE SURVEY AND SITE PLAN SHOULD SHOW THE SETBACKS FOR
 THE PROPOSED GENERATOR.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT
 TEL: (561) 822-1442
 E-MAIL: [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2019-09-06 Cont ID  
Sent By rfalcone Date 2019-09-06 Time 16:31 Rev Time 0.00
Received By rfalcone Date 2019-09-06 Time 16:31 Sent To FIRE
Notes
2019-09-06 16:44:4909/06/19 FAILED.
  
 PURSUANT ZLDR SEC. 94-305(B)(4), MECHANICAL EQUIPMENT.
 MECHANICAL EQUIPMENT MAY NOT PROJECT MORE THAN FOUR
 FEET INTO A SETBACK. WINDOW AIR-CONDITIONING UNITS MAY
 NOT PROJECT MORE THAN 18 INCHES INTO A REQUIRED SIDE
 SETBACK. PLEASE PROVIDE A SURVEY OF THE SUBJECT SITE.
 THE SURVEY AND SITE PLAN SHOULD SHOW THE SETBACKS FOR
 THE PROPOSED GENERATOR.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT