| 2019-09-09 16:42:40 | 09/09/2019 1ST GAS/LP/TANK REVIEW **DENIED** WITH |
| | COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC RES. |
| | SECS. G2413.4.1, G2413.4.2. |
| | 2. TYPE OF GAS (LP OR NATURAL). WPB AMENDMENTS TO THE |
| | FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 3. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2017 FBC RES. SEC. G2413.2. |
| | 4. SHOW THE LOCATION OF LP TANK. A LISTED SHUTOFF |
| | VALVE, UNIONS AND REGULATOR PER THE 2017 FBC RES. SEC. |
| | G2420.4. |
| | 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER THE 2017 FBC |
| | RES. SEC. G2413.4.1. |
| | 6. SUBMIT TWO COPIES OF THE SIZING TABLE USED IN THE |
| | DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS |
| | OF PLANS LISTING THE SIZING TABLES FROM GAS CODES OR |
| | ANOTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS |
| | SYSTEM PER THE 2017 FBC RES. SEC. G2413.3 |
| | 7. THE CITY RECORDS INDICATE AN EXISTING LP TANK AND |
| | GENERATOR INSTALLED IN 2005. THE BTU LOAD OF THE |
| | EXISTING SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD |
| | ON THE SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY |
| | SIZED. IF UNDERSIZED, THE EXISTING SYSTEM MUST BE |
| | REDONE TO ENSURE A SAFE OPERATING SYSTEM PER THE 2017 |
| | FBC RES. SECS. G2412.4, G2412.8, G2413.1, G2413.2, |
| | G2413.3. |
| | 8. IF APPLICABLE SUBMIT MANUFACTURER?S SPECIFICATIONS |
| | FOR THE PRESSURE REGULATORS. REGULATORS INSTALLED ON |
| | THE EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR |
| | OUTDOOR INSTALLATION PER THE 2017 FBC RES. SEC. |
| | G2421.1. |
| | 9. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1? OF |
| | EITHER SIDE PER THE 2017 FBC FG SEC 410.2. |
| | 10. THE ADDRESS OF THE PROJECT OR RESIDENCE MUST BE ON |
| | PLAN. WPB AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION |
| | ON CONSTRUCTION DOCUMENTS. |
| | 11. THE MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR |
| | SHALL BE ONSITE FOR FINAL GAS INSPECTION. THE GENERATOR |
| | SHALL BE LISTED AND APPROVED. NFPA 58 SEC. 5.20.1. THE |
| | GENERATOR SHALL MEET THE REQUIREMENTS OF UL 2200. |
| | |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |