Plan Review Details - Permit 19081234
Plan Review Stops For Permit 19081234
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-09-25 Cont ID  
Sent By rmcdouga Date 2019-09-25 Time 09:21 Rev Time 0.00
Received By rmcdouga Date 2019-09-25 Time 09:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-09-11 Cont ID  
Sent By rmcdouga Date 2019-09-11 Time 09:11 Rev Time 0.00
Received By rmcdouga Date 2019-09-11 Time 09:11 Sent To Z
Notes
2019-09-11 09:15:47PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE AMERICAST GENERATOR PAD ENGINEERING DOCUMENTS
 ARE NOT SIGNED AND SEALED AS REQUIRED BY CHAPTER 471,
 FLORIDA STATUTES & 61G15 FLORIDA ADMINISTRATIVE CODE.
 61G15-23.003 PROCEDURES FOR PHYSICALLY SIGNING AND
 SEALING PLANS, SPECIFICATIONS, REPORTS OR OTHER
 DOCUMENTS. ENGINEERING PLANS, SPECIFICATIONS, REPORTS
 OR OTHER DOCUMENTS WHICH MUST BE SIGNED, DATED AND
 SEALED IN ACCORDANCE WITH THE PROVISIONS OF SECTION
 471.025, F.S., AND RULE 61G15-23.001, F.A.C. MUST BE
 PHYSICALLY SIGNED, DATED AND SEALED AS PROVIDED HEREIN
 BY THE PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE.
 (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE
 LICENSEE?S SIGNATURE ON EACH PAGE REQUIRED TO BE
 SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR
 COPIED IMAGE OF THE LICENSEE?S SIGNATURE SHALL NOT BE
 USED.
 (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY
 CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY
 OVERLAPPING THE LICENSEE?S SIGNATURE ON EACH PAGE
 REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL
 NOT RENDER THE SIGNATURE ILLEGIBLE.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-08-26 Cont ID  
Sent By jleahy Date 2019-08-26 Time 16:27 Rev Time 0.00
Received By jleahy Date 2019-08-26 Time 16:27 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2019-10-08 Cont ID  
Sent By tklarge Date 2019-10-08 Time 11:39 Rev Time 0.00
Received By tklarge Date 2019-10-08 Time 11:39 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2019-09-25 Cont ID  
Sent By tklarge Date 2019-09-25 Time 06:32 Rev Time 0.00
Received By tklarge Date 2019-09-25 Time 05:46 Sent To B
Notes
2019-09-25 06:31:201) SUBMIT TWO COPIES OF A CLEAN SURVEY WITHOUT PREVIOUS
 STAMPS OR OTHER PERMIT NUMBERS STAMPED ON IT. WPB
 AMEND. TO FBC SEC. 107.3.5.3.
 2) SIZE THE MEDIUM PRESSURE LINE GOING TO THE GENERATOR
 WPB AMEND. TO FBC SEC. 107.2.1.
 3) SUBMIT A COPY OF THE SIZING TABLE FOR THE LOW
 PRESSURE SIDE OF THE SYSTEM. 2017 FBC-FUEL GAS SEC.
 402.3.
 4) MY CALCULATIONS FOR THE TOTAL BTU'S ON THE SYSTEM IS
 1,110,000 BUT THE SUBMITTED GAS PLAN NOTES 920,000.
 CLARIFY.
 5) SUBMIT TWO COPIES OF PAGES 1, 40 AND 41 OF THE
 MANUFACTURER'S SPECIFICATIONS FOR THE REGULATORS. THESE
 PAGES HAVE INSTALLATION INSTRUCTIONS FOR THE REGULATOR
 AND ITS VENT.\
 6) SHOW THE DISTANCE FROM THE REGULATOR TO EACH
 APPLIANCE/ PIECE OFEQUIPMENT.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-08-26 Cont ID  
Sent By abelisle Date 2019-08-26 Time 07:57 Rev Time 0.00
Received By abelisle Date 2019-08-26 Time 07:23 Sent To  
Notes
2019-08-26 07:57:448/26/2019 1ST GAS REVIEW**DENIED** WITH COMMENTS NOTE -
 A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS TIME
 AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED
 UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
  
 1) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. 2017 FBC FUEL GAS SEC.
 409.4, FBC FUEL GAS RES. SEC. G2420.4.
  
 2) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2017 FBC FUEL GAS SEC.410.1 OR 2017 FBC
 FUEL GAS RES. SEC. G2421.1.
  
 3) THE GENERATOR SHALL BE ONE FOOT SIX INCHES (1?-6?)
 FROM THE HOUSE, FIVE (5?-0?) FROM THE PROPERTY LINE,
 EXHAUST SHALL BE TEN (10?-0?) FROM ANY OPENING UNLESS
 OTHERWISE STATED IN THE MANUFACTURES SPECIFICATION
 INSTRUCTIONS.
  
 4) THERE ARE SECTIONS OF PRINTING ON THE GAS RISER
 DRAWING THAT ARE ILLEGIBLE. SUBMIT A CLEAR AND LEGIBLE
 SHEET THAT REFLECTS THE SCOPE OF WORK BEING DONE. WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON
 CONSTRUCTION DOCUMENTS
  
 5) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC FUEL GAS
 SECS. 401.8 THROUGH 402.6.1 AND TABLES 402.4 (1)
 THROUGH 402.4 (37) OR 2017 FBC FUEL GAS RES. SEC.
 G2413.THERE IS AN EXISTING BTU LOAD CALCULATION ON FILE
 INDICATING A DIFFERENT BTU LOAD.
  
 6) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION
 & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 7) PLEASE SUBMIT 2 COPIES OF THE SURVEY NOT ALREADY
 APPROVED AND STAMPED BY THE CITY OF WEST PALM BEACH
  
 8) SUBMIT TWO COPIES OF THE SIZING TABLE USED IN THE
 DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS
 OF PLANS LISTING THE SIZING TABLES FROM GAS CODES OR
 ANOTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS
 SYSTEM 2017 FBC FUEL GAS SEC. 402.3 OR 2017 FBC FUEL
 GAS RES. SEC. G2413.3
  
 ATELYO BELISLE
 PLUMBING INSPECTOR /
 PLUMBING PLANS EXAMINER
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6695
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status   Date 2019-10-08 Cont ID  
Sent By tklarge Date 2019-10-08 Time 11:39 Rev Time 0.00
Received By tklarge Date 2019-10-08 Time 11:39 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-09-25 Cont ID  
Sent By rmcdouga Date 2019-09-25 Time 09:21 Rev Time 0.00
Received By rmcdouga Date 2019-09-20 Time 14:56 Sent To  
Notes
2019-09-23 14:56:53RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-09-13 Cont ID  
Sent By cpuell Date 2019-09-13 Time 11:11 Rev Time 0.00
Received By cpuell Date 2019-08-23 Time 14:39 Sent To  
Notes
2019-08-23 14:39:40ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2019-09-11 Cont ID  
Sent By rfalcone Date 2019-09-11 Time 15:47 Rev Time 0.00
Received By rfalcone Date 2019-09-11 Time 15:47 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved