| 2019-08-22 15:03:08 | 08/22/2018 1ST GAS REVIEW **DENIED** WITH COMMENTS. |
| | |
| | NOTE: A FULL AND COMPREHENSIVE PLAN REVIEW COULD NOT BE |
| | ACCOMPLISHED AT THIS TIME DUE TO THE QUALITY OF THE |
| | SUBMITTED PLANS. ADDITIONAL COMMENTS MAY BE GENERATED |
| | ON THE RESUBMITTAL REVIEW. |
| | |
| | 1. LABEL OF ALL SHUT OFF VALVES PER THE 2017 FBC FG |
| | SEC. 409.4. |
| | |
| | 2. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION PER THE 2017 FBC FG SEC. 410.1. |
| | |
| | 3. SUBMIT MANUFACTURER?S SPECIFICATION |
| | SHEETS/INSTALLATION MANUAL FOR TANKLESS GAS EQUIPMENT |
| | TO VERIFY COMPLIANCE WITH 2017 FBC FG SEC.305.1. |
| | |
| | 4. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE, |
| | TERMINATION POINT, HEIGHT ABOVE THE ROOF AND ANCHORING |
| | DETAILS OF THE GAS VENT(S) PER THE 2017 FBC FUEL GAS |
| | SECS. 502 THRU 505. |
| | |
| | 5. NEED A SHUTOFF VALVE, UNION AND HARD CAP FOR FUTURE |
| | RANGE SHOW ON GAS ISOMERIC PER THE 2017 FBC FG SEC. |
| | 409.5. |
| | |
| | 6. SHOW THE CORRESPONDING EHD NUMBER OF THE CORRUGATED |
| | STAINLESS-STEEL TUBING (IF APPLICABLE) FOR EACH PIPE |
| | SIZE. WPB AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION |
| | ON CONSTRUCTION DOCUMENTS. |
| | |
| | 7. THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON |
| | THE APPLICATION, THE VALUE MUST INCLUDE THE COST OF ALL |
| | EQUIPMENT INCLUDING TANKLESS PLEASE PROVIDE A BONA FIDE |
| | SIGNED CONTRACT. WPB AMENDMENTS TO THE FBC 109.3. |
| | BUILDING PERMITS VALUATIONS. |
| | |
| | 8. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1? OF |
| | EITHER SIDE PER THE 2017 FBC FG SEC 410.2. |
| | |
| | |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | |