Plan Review Details - Permit 19081109
Plan Review Stops For Permit 19081109
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status N Date 2019-08-23 Cont ID  
Sent By skennedy Date 2019-08-23 Time 11:31 Rev Time 0.00
Received By skennedy Date 2019-08-23 Time 11:31 Sent To  
Notes
2019-08-23 11:32:04NO DEMOLITION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-08-27 Cont ID  
Sent By dbattles Date 2019-08-27 Time 13:52 Rev Time 0.00
Received By dbattles Date 2019-08-27 Time 13:51 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-08-22 Cont ID  
Sent By jleahy Date 2019-08-22 Time 13:17 Rev Time 0.00
Received By jleahy Date 2019-08-22 Time 12:54 Sent To  
Notes
2019-08-22 13:21:13FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
  
 PROVISIO
  
 1) PANEL NEEDS MAIN
 2) NEED SIZE OF WATER HEATER
 3) SEE APNEL SCHEDULE FOR PROBLEMS
 4) NEED BRANCH CKT #S ON PLAN
 5) NEED LOAD CALC FOR SERVICE
 6) NEED FAULT CURRENT CALC FOR SERVICE
 7) PLAN SHOWS 4 SWITCHES IN DOORWAY
 8) E5 NOT SHOWN ON PANEL SCHEDULE
  
 SUBMIT BEFORE FINAL ELECTRICAL INSPECTION.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-08-23 Cont ID  
Sent By pleduc Date 2019-08-23 Time   Rev Time 0.00
Received By pleduc Date 2019-08-23 Time 14:39 Sent To  
Notes
2019-08-23 14:44:03THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) THERE IS AN INDICATION OF A TWO BURNER HOTPLATE.
 HOTPLATE COOKING SHALL NOT PRODICE GREASE LADIN VAPORS
 UNLESS PROTECT BY A HOOD AND SUPPRESSION SYSTEM.
  
 PLEASE ENSURE COMPLIANCE.
  
  
 2) THERE IS AN INDICATION OF A WOOD BURNING PIZZA OVEN
 UNDER SEPARATE PERMIT.
  
 PLEASE ENSURE THAT THE PROPOSED OVEN IS LISTED AND THAT
 THE MANUFACTURES SPECIFICATION SHEET(S) IS SUBMITTED.
  
  
  
 3) THERE IS AN INDICATION OF A WOOD BURNING PIZZA OVEN
 UNDER SEPARATE PERMIT.
  
 ON SUBMITTAL OF THE OVEN PERMIT, PLEASE PROVIDE DETAILS
 OF WHERE THE WOOD WILL BE STORED AND HOW MUCH.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-27 Cont ID  
Sent By dbattles Date 2019-08-27 Time 16:39 Rev Time 0.00
Received By dbattles Date 2019-08-22 Time 11:21 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2019-09-10 Cont ID  
Sent By dbattles Date 2019-09-10 Time 16:13 Rev Time 0.00
Received By dbattles Date 2019-09-10 Time 16:13 Sent To  
Notes
2019-09-10 16:14:19OK-PLANS STAMPED
 MU-2019-27837-0000

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2019-08-27 Cont ID  
Sent By dbattles Date 2019-08-27 Time 16:39 Rev Time 0.00
Received By dbattles Date 2019-08-27 Time 16:39 Sent To  
Notes
2019-08-27 16:41:12109 FBC[AMENDED] PLANS REQUIRE REVIEW BY THE PBC IMPACT
 FEE OFFICE. ?CALL (561) 233-5025. ?UPON APPROVAL, YOU
 MAY CHECK OUT ONE PLAN SET AND TAKE TO THAT OFFICE FOR
 REVIEW. ?PLEASE RETURNED STAMPED AND WITH A COPY OF THE
 RECEIPT AS APPLICABLE. PLEASE PROVIDE THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO THE PBC IMPACT FEE
 OFFICE. THE FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGO
 V.ORG/PZB/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONN
 AIRE.PDF

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2019-08-22 Cont ID  
Sent By hmoser Date 2019-08-22 Time 12:08 Rev Time 0.00
Received By hmoser Date 2019-08-22 Time 11:59 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2019-08-23 Cont ID  
Sent By gjohnson Date 2019-08-23 Time 12:12 Rev Time 0.00
Received By gjohnson Date 2019-08-23 Time 12:12 Sent To  
Notes
***NONE***

Review Stop P-GREASE GREASE INTERCEPTOR/TRAP REVIEW
Rev No 1 Status P Date 2019-08-23 Cont ID  
Sent By gjohnson Date 2019-08-23 Time 12:11 Rev Time 0.00
Received By gjohnson Date 2019-08-23 Time 12:11 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2019-08-23 Cont ID  
Sent By aborngra Date 2019-08-23 Time 15:48 Rev Time 0.00
Received By aborngra Date 2019-08-23 Time 15:47 Sent To  
Notes
2019-08-23 15:48:37PERMIT APPROVED PER PLANS AND FOR INTERNAL WORK ONLY.
  
 AARON BORNGRABER
 HISTORIC PRESERVATION PLANNER
 CITY OF WEST PALM BEACH - DEVELOPMENT SERVICES