Plan Review Details - Permit 19080979
Plan Review Stops For Permit 19080979
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-09-19 Cont ID  
Sent By jgomez Date 2019-09-19 Time 16:24 Rev Time 0.00
Received By jgomez Date 2019-09-19 Time 10:21 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-08-29 Cont ID  
Sent By rmcdouga Date 2019-08-29 Time 06:38 Rev Time 0.00
Received By rmcdouga Date 2019-08-29 Time 06:05 Sent To I
Notes
2019-08-29 06:38:31PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SPECIFY WHICH ONE OF THE SYSTEMS AND ITS MAXIMUM
 DESIGN PRESSURE LISTED IN THE PRODUCT APPROVAL FOR THE
 GAF SELF-ADHERING MODIFIED NOA NO 16-1206.02 WILL BE
 INSTALLED. YOU CAN CIRCLE THESE ITEMS ON THE PRODUCT
 APPROVAL.
  
 2) THIS PROJECT IS A ONE STORY SINGLE FAMILY RESIDENCE
 LOCATED IN EXPOSURE C WITH A 170 MPH VULT WIND SPEED.
 NONE OF THE MAXIMUM DESIGN PRESSURES LISTED IN THE NOA
 ARE ADEQUATE FOR ROOF ZONES 2 AND 3 WITHOUT ENHANCED
 FASTENING. SEE GENERAL LIMITATION #7 WHICH REQUIRES
 SIGNED AND SEALED RAS 117 CALCULATIONS. FBC-R 905.11.3
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-08-21 Cont ID  
Sent By rmcdouga Date 2019-08-21 Time 11:28 Rev Time 0.00
Received By rmcdouga Date 2019-08-21 Time 10:50 Sent To  
Notes
2019-08-21 11:28:08PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF PRODUCT APPROVALS FOR THE ROOFING
 MATERIALS FOR THE FLAT ROOF. THE CITY OF WEST PALM
 BEACH HAS NOT ADOPTED RAS 150. THE ROOFING HAS TO BE
 INSTALLED IN ACCORDANCE WITH THE PRODUCT APPROVAL. FBC
 107.3.4 & FAC 61G20-3.001.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-09-19 Cont ID  
Sent By jgomez Date 2019-09-19 Time 16:24 Rev Time 0.00
Received By jgomez Date 2019-09-16 Time 09:25 Sent To I
Notes
2019-09-18 09:25:42RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-08-29 Cont ID  
Sent By rmcdouga Date 2019-08-29 Time 06:38 Rev Time 0.00
Received By rmcdouga Date 2019-08-28 Time 16:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-21 Cont ID  
Sent By rmcdouga Date 2019-08-21 Time 11:28 Rev Time 0.00
Received By rmcdouga Date 2019-08-20 Time 11:36 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved