Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-10-24 Cont ID  
Sent By fgiaquin Date 2019-10-24 Time 07:03 Rev Time 0.00
Received By fgiaquin Date 2019-10-24 Time 06:55 Sent To M
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-09-10 Cont ID  
Sent By fgiaquin Date 2019-09-10 Time 06:47 Rev Time 0.00
Received By fgiaquin Date 2019-09-10 Time 06:40 Sent To M
Notes
2019-09-10 06:47:55ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. VALUE LOW FOR AMOUNT OF WORK SHOWN. WE NEED AN
 ACCURATE VALUE FOR THE WORK BEING PERFORMED, TO INCLUDE
 ALL MATERIALS AND LABOR. THIS SHOULD EVEN INCLUDE ITEMS
 THAT ARE CUSTOMER SUPPLIED. PLEASE RECALCULATE YOUR
 VALUE AND PROVIDE AN ACCURATE ESTIMATE. THE FEE FOR A
 PERMIT IS BASED ON A PERCENTAGE OF THE JOB VALUE, SO AN
 INCREASE IN VALUE TYPICALLY MAKES A SMALL DIFFERENCE IN
 THE PERMIT FEES. HOWEVER, CONFIRMING AN ACCURATE VALUE
 FOR THE PROPOSED WORK IS INCLUDED IN THE JOB
 DESCRIPTION FOR A PLAN REVIEWER. AS SUCH, YOUR PERMIT
 CANNOT BE APPROVED UNTIL THIS ISSUE IS RESOLVED.
  
 IN THE FUTURE YOUR PERMIT VALUE SHOULD INCLUDE ALL
 MATERIALS SUPPLIED BY YOU THE CONTRACTOR AND ANY
 CUSTOMER RELATED ITEMS AND LABOR TO INSTALL THE WORK
 PER FBC 109.3. BELOW YOU WILL FIND THE FBC SECTION FOR
 VALUATION OF THE WORK FOR A PERMIT.
  
 CITY ORDINANCE AND FBC 109.3 BUILDING PERMIT
 VALUATIONS. IF, IN THE OPINION OF THE BUILDING
 OFFICIAL, THE CLAIMED VALUATION OF BUILDING,
 ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR
 PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS THE
 APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR
 BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO
 MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 INFORMATIONAL NOTE: WHEN FIRE ALARM INSTALLATIOS ARE
 $5000 OR MORE IT IS REQUIRED TO BE DESIGNED BY A DESIGN
 PROFESSIONAL PER FBC 105.3.1.2 #4
  
 2. ELECTRICAL PLAN IS REQUIRED TO BE DESIGNED AND
 SIGNED/SEALED BY A DESIGN PROFESSIONAL. PROVIDE
 CORRECTION. FS 471.003(2)(H); 471.025; WPB FBC 107.1
  
  
  
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO III
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WEST PALM BEACH
 [email protected]
 CELL: 561-657-1653
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-10-17 Cont ID  
Sent By pleduc Date 2019-10-17 Time   Rev Time 0.00
Received By pleduc Date 2019-10-17 Time 15:28 Sent To E
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-08-20 Cont ID  
Sent By pleduc Date 2019-08-20 Time   Rev Time 0.00
Received By pleduc Date 2019-08-20 Time 14:17 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-10-25 Cont ID  
Sent By cmontell Date 2019-10-25 Time 13:05 Rev Time 0.00
Received By cmontell Date 2019-10-25 Time 13:05 Sent To  
Notes
2019-10-16 14:19:46RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-09-12 Cont ID  
Sent By cmontell Date 2019-09-12 Time 06:09 Rev Time 0.00
Received By cmontell Date 2019-09-12 Time 06:09 Sent To  
Notes
2019-08-20 12:46:05ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2019-10-25 Cont ID  
Sent By cmontell Date 2019-10-25 Time 13:05 Rev Time 0.00
Received By cmontell Date 2019-10-25 Time 13:03 Sent To I
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2019-09-12 Cont ID  
Sent By cmontell Date 2019-09-12 Time 06:09 Rev Time 0.00
Received By cmontell Date 2019-09-12 Time 06:09 Sent To I
Notes
***NONE***