Plan Review Details - Permit 19080726
Plan Review Stops For Permit 19080726
Review Stop G GAS REVIEW
Rev No 4 Status P Date 2019-10-10 Cont ID  
Sent By tklarge Date 2019-10-10 Time 06:38 Rev Time 0.00
Received By tklarge Date 2019-10-10 Time 06:04 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status F Date 2019-10-02 Cont ID  
Sent By tklarge Date 2019-10-02 Time 11:08 Rev Time 0.00
Received By tklarge Date 2019-10-02 Time 10:56 Sent To  
Notes
2019-10-02 11:04:321) THE PLANS THAT HAVE BEEN SUBMITTED ARE FROM THE
 INITIAL GAS REVIEW UNDER PERMIT #19050833 FOR THE
 GENERATOR AND DO NOT SHOW THE ADDED POOL HEATER OM THE
 GAS DRAWING.THESE PLANS CANNOT BE USED FOR THIS
 REVISION AS THIS PERMIT HAS ALREADY BEEN ISSUED. SUBMIT
 TWO COPIES OF A GAS DRAWING THAT SHOWS ALL THE GAS
 APPLIANCES/ EQUIPMENT THAT ARE CONNECTED TO THIS GAS
 SYSTEM. WPB AMENDMENTS TO FBC SEC. 107.2.1.
 2) 1) SUBMIT TWO COPIES OF THE INSTALLATION
 INSTRUCTIONS FOR THE PRESSURE REGULATORS. REGULATORS
 INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE
 APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON THE
 SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING
 INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR
 CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017
 FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1.
 2) SHOW THE CORRESPONDING EHD NUMBER OF THE CORRUGATED
 STAINLESS STEEL TUBING ON THE PLANS. 2ND REQUEST.
 3) THE PLANS SHOW THE CSST LINE AS A LOW PRESSURE LINE
 BUT THERE IS NO GAS REGULATOR SHOWN ON THE LINE AND THE
 LINE IS SHOWN CONNECTED TO THE 2 PSI PIPING.. CLARIFY.
 3) UNIONS ARE REQUIRED WITHIN ONE FOOT UPSTREAM OR
 DOWNSTREAM OF THE PRESSURE REGULATORS. FGC SEC. 410.2
 (7).
 4) SUBMIT THE APPLICABLE SIZING TABLES FOR THE LOW
 PRESSURE SECTIONS OF THE GAS SYSTEM.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2019-09-11 Cont ID  
Sent By tklarge Date 2019-09-11 Time 10:49 Rev Time 0.00
Received By tklarge Date 2019-09-11 Time 10:41 Sent To  
Notes
2019-09-11 10:42:411) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING
 SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON
 THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING
 INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR
 CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017
 FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1.
 2) SHOW THE CORRESPONDING EHD NUMBER OF THE CORRUGATED
 STAINLESS STEEL TUBING ON THE PLANS. 2ND REQUEST.
 3) THE PLANS SHOW THE CSST LINE AS A LOW PRESSURE LINE
 BUT THERE IS NO GAS REGULATOR SHOWN ON THE LINE AND THE
 LINE IS SHOWN CONNECTED TO THE 2 PSI PIPING.. CLARIFY.
 3) UNIONS ARE REQUIRED WITHIN ONE FOOT UPSTREAM OR
 DOWNSTREAM OF THE PRESSURE REGULATORS. FGC SEC. 410.2
 (7).
 4) SUBMIT THE APPLICABLE SIZING TABLES FOR THE LOW
 PRESSURE SECTIONS OF THE GAS SYSTEM.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date   Cont ID  
Sent By tklarge Date 2019-08-22 Time   Rev Time 0.00
Received By tklarge Date 2019-08-22 Time 05:30 Sent To  
Notes
2019-08-22 12:54:531) ) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3.
 2) SHOW THE CORRESPONDING EHD NUMBER OF THE CORRUGATED
 STAINLESS STEEL TUBING ON THE PLANS.
 3) SHOW THE LOCATION OF THE REGULATOR FOR TANKLESS
 WATER HEATER.
 4) SHOW THE BTU LOAD OF THE COOKTOP AND THE TANKLESS
 WATER HEATER ON THE PLANS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2019-10-10 Cont ID  
Sent By tklarge Date 2019-10-10 Time 06:38 Rev Time 0.00
Received By tklarge Date 2019-10-07 Time 13:29 Sent To  
Notes
2019-10-08 13:29:32RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-10-02 Cont ID  
Sent By tklarge Date 2019-10-02 Time 11:08 Rev Time 0.00
Received By tklarge Date 2019-09-27 Time 13:36 Sent To  
Notes
2019-10-01 13:36:57RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-09-11 Cont ID  
Sent By tklarge Date 2019-09-11 Time 10:49 Rev Time 0.00
Received By tklarge Date 2019-09-09 Time 14:24 Sent To  
Notes
2019-09-10 14:24:19RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-22 Cont ID  
Sent By lmarchan Date 2019-08-22 Time 15:39 Rev Time 0.00
Received By lmarchan Date 2019-08-14 Time 14:15 Sent To  
Notes
2019-08-15 14:15:32REVISION ROUTED TO TKLARGE